Doc No.

: STPL/SAM/ABL/1

STPL DAILY DAIRY Rev No.:


Date of rev.:
0
17-10-12

Project : Sambalpur -Bargarh Orissa/Chattisgarh Border of NH 6


Client : Ashoka Sambalpur-Bargarh Tollway Pvt. Ltd.
Engineer : Sugam Technocrates Pvt. Ltd.
Date:16-10-
2012
Section 1: Weather Report
Clear(
Cloudy Foggy Rainy
a. Weather )

b. Temperature (0C) Min. 28.3 Max. 37.6

c. Rainfall (mm) Nil

Section 2: Details of Activities Verified at Site


Sl. Checked
R.F.I no. Chainage Activities Remarks
No. by
Box culvert casting of Sr.BE
1 STR/12/1113 5+538 Not ready.
A2 lift -1 M-35 Asst. B.E.
Checked formwork and
reinforcement found ok . Slab
Concrete is going on without
Slab Concrete Minor Sr.BE proper fixing the fabricated unit
2 STR/12/1116 33+760 of drainage spout. In this regard
Bridge Asst. B.E it is instructed that fabricated
drainage spout unit should be
fixed properly before concreting
of slab of Bridge.
4+100 to
Emb. 1st layer FDD
3 RWS/12/1885 4+160 Checked found OK
checking
RHS
4+100 to
Emb. 2nd layer FDD
4 RWS/12/1886 4+300 Checked found OK
checking
RHS
Section 3: Details of Test Conducted in Laboratory
Sl. Witnessed
R.F.I no. Location Test Conducted Remarks
No. by
Bulk Sp.Gravity: 2.443g/cc
Air Voids: 4.05 %
VMA: 13.71 %
DBM-1, Marshall Mould.
14+000 Sr.ME/Lab VFB: 63.22 %
1 Density, Stability, Flow
Lab. Tech M.Stability: 2571 kg
test.
Flow: 4.05 mm
DBM Mix Design in progress
with shell bitumen.
(Excavated Pit for
Sample from Bed (Excavated Pit
Observation of Disturbed
for Observation of Disturbed
18+550 Bed) Sr.ME/Lab
2 Bed)Sub Grade(Moisture content
LHS Moisture Content Tech
-13.01%OMC-9.1%)
Checking of S.G. soil and
GSB -12.77% (OMC 6.20)
GSB under WMM layer.

Section 4: Observations & Recommendations:

Further to our report of 15-10-2012, more pits were excavated at Chainages 18+220,18+240,
17+960 and observations are listed below. Samples were collected for testing for Moisture content
and Gradation of GSB.
Visual Observation:
1) Adjacent Areas are Water Logged and have a Water Table about the same level as subgrade.
2) Visual observations of all 4 Pits made, clearly indicate that the Moisture Content is well
above OMC in both GSB and Subgrade.
3) GSB Material used appears to be from natural source without any Blending and has oversize
aggregates. (sample collected for tests.)
4) Water appears to have percolated from the Top Surface and instead of being dispersed
Laterally through Drainage Layer( GSB),it has travelled downward to Subgrade Layer,
resulting in Subgrade failure leading to bumping on the WMM Top which has happened as
GSB has not functioned properly as Drainage Layer.

Recommendations:

a)The Bed ( 17+860 to 18+730 ) has to be excavated up to Subgrade Top

b) Subgrade Top needs to be scarified, and allow to dry to OMC and compacted as per specification

c). Further Layers has to be constructed with Approved GSB (preferably Crushed ) to improve the
drainage properties of sub base.
Team Leader,
Sugam Technocrates Pvt. Ltd.