Foundation Concrete Pab_2

Nivel Sector Group Name_Elem h_Cim Long_Cim Excav_Cim Solado_Cim Encof_Cim Volume Strength Phase Created

Cimentacion Pab_2 Sector_1 Ciment Viga_Ciment 36.22 19.58 67.79 8.473 f'c=280 Kg/cm2 Tipo MS Ejecutado
Viga_Ciment 36.22 19.58 67.79 8.473
Cimentacion Pab_2 Sector_1 Ciment Zapata Comb_3 0.500 5.500 19.80 12.38 11.00 6.188 f'c=280 Kg/cm2 Tipo MS Ejecutado
Zapata Comb_3 19.80 12.38 11.00 6.188 www.autodesk.com/revit
Cimentacion Pab_2 Sector_1 Ciment Zapatas 75.49 47.18 56.32 22.316 f'c=280 Kg/cm2 Tipo MS Ejecutado
Zapatas 75.49 47.18 56.32 22.316

3D Ejecutado
1
Pab_2 Sector_1 Ciment: 78 131.51 79.13 135.11 36.977

Cimentacion Pab_2 Sector_2 Ciment Viga_Ciment 27.55 14.89 57.53 7.191 f'c=280 Kg/cm2 Tipo MS Ejecutado
Viga_Ciment 27.55 14.89 57.53 7.191
Cimentacion Pab_2 Sector_2 Ciment Zapata Comb_3 Z-A Pab_2 A=1.00 0.500 5.500 9.68 6.05 5.50 3.025 f'c=280 Kg/cm2 Tipo MS Ejecutado
Zapata Comb_3 9.68 6.05 5.50 3.025
Cimentacion Pab_2 Sector_2 Ciment Zapatas 57.95 36.22 45.48 17.424 f'c=280 Kg/cm2 Tipo MS Ejecutado
Zapatas 57.95 36.22 45.48 17.424
Pab_2 Sector_2 Ciment: 63 95.18 57.16 108.51 27.640
Grand total: 141 226.69 136.30 243.61 64.616
Consultant Consultant
Address Address
Address Address
Phone Phone
Fax Fax
e-mail e-mail

Consultant Consultant
Address Address
Address Address
Phone Phone
Fax Fax
e-mail e-mail
2 3 4 8' 10 10' 14

B
PAB_1 CIMENT No. Description Date
C
PAB_2 SECTOR_2 CIMENT PAB_4 CIMENT

G
H

PAB_2 SECTOR_1 CIMENT

L
PAB_3 CIMENT

2 3 4 5' 6"
6' 8' 10'
10 14
Foundation Concrete Pab_3 Mejoramiento del Servicio
0 Sectorización Cimiento Armado Nivel Sector Group Name_Elem h_Cim Long_Cim Excav_Cim Solado_Cim Encof_Cim Volume Strength Phase Created Educativo en la IE_558
2 1 : 200
Cimentacion Pab_3 Ciment Viga_Ciment 31.70 17.14 62.18 7.773 f'c=280 Kg/cm2 Tipo MS Ejecutado Pachacamac II - Villa el
Viga_Ciment
Cimentacion Pab_3 Ciment Zapatas
31.70
87.49
17.14
54.68
62.18
64.80
7.773
26.360 f'c=280 Kg/cm2 Tipo MS Ejecutado
Salvador - Lima - Lima.

Fases Cimiento
Zapatas 87.49 54.68 64.80 26.360
Pab_3 Ciment: 72 119.19 71.82 126.98 34.133
Grand total: 72 119.19 71.82 126.98 34.133
Foundation Concrete Pab_1

Armado
Nivel Sector Group Name_Elem h_Cim Long_Cim Excav_Cim Solado_Cim Encof_Cim Volume Strength Phase Created

Cimentacion Pab_1 Ciment Viga_Ciment 26.93 14.56 51.28 6.410 f'c=280 Kg/cm2 Tipo MS

0001
Viga_Ciment 26.93 14.56 51.28 6.410
Cimentacion Pab_1 Ciment Zapatas 90.18 56.36 50.01 27.507 f'c=280 Kg/cm2 Tipo MS Ejecutado Project number
Zapatas 90.18 56.36 50.01 27.507

Issue Date
Pab_1 Ciment: 60 117.10 70.92 101.29 33.917
Grand total: 60 117.10 70.92 101.29 33.917 Date

Foundation Concrete Pab_4


Nivel Sector Group Name_Elem h_Cim Long_Cim Excav_Cim Solado_Cim Encof_Cim Volume Strength Phase Created
Drawn by Ing. Augusto Paucar

Checked by Ing. Augusto Paucar

05/05/2018 09:47:57 a.m.


Cimentacion Pab_4 Ciment Viga_Ciment 17.59 9.51 46.84 5.855 f'c=280 Kg/cm2 Tipo MS New Construction
Viga_Ciment 17.59 9.51 46.84 5.855

P-101
Cimentacion Pab_4 Ciment Zapata Comb_3 0.500 5.500 17.60 11.00 11.00 5.500 f'c=280 Kg/cm2 Tipo MS New Construction
Zapata Comb_3 17.60 11.00 11.00 5.500
Cimentacion Pab_4 Ciment Zapatas 0.500 63.11 39.44 45.13 19.721 f'c=280 Kg/cm2 Tipo MS New Construction
Zapatas 63.11 39.44 45.13 19.721

1 : 200
Pab_4 Ciment: 29 98.30 59.95 102.97 31.076
Grand total: 29 98.30 59.95 102.97 31.076 Scale
Suma de Volume_Cim Volumen de Concreto: Ejecutado ‐ Programado Phase
CIMENTACIONES IE_558  Ejecutado

27.51  New Construction Group


30.00 26.36
25.00 22.32
17.42
19.72 Viga_Ciment
20.00
15.00 Zapata Comb_3
8.47 7.19 7.77
10.00 6.16 6.19 5.85 5.50
3.03 Zapatas
5.00 0.25
0.00
Viga_Ciment

Zapatas

Viga_Ciment

Zapata Comb_3

Zapatas

Viga_Ciment

Zapata Comb_3

Zapatas

Viga_Ciment

Zapatas

Viga_Ciment

Zapata Comb_3

Zapatas
Pab_1 Ciment Pab_2 Sector_1 Ciment Pab_2 Sector_2 Ciment Pab_3 Ciment Pab_4 Ciment
Sector Group

Suma de Volume_Cim Etiquetas de columna Suma de Volume_Cim Phase


Etiquetas de fila  Ejecutado  New Construction Total general  Ejecutado
Pab_1 Ciment 33.67 0.25 33.92 Vol_Cimentaciones IE_558  New Construction
Viga_Ciment 6.16 0.25 6.41
Zapatas 27.51 27.51
31.32; 19%
Pab_2 Sector_1 Ciment 36.98 36.98
Viga_Ciment 8.47 8.47
Zapata Comb_3 6.19 6.19
132.42; 81%
Zapatas 22.32 22.32
Pab_2 Sector_2 Ciment 27.64 27.64
Viga_Ciment 7.19 7.19
Zapata Comb_3 3.03 3.03
Zapatas 17.42 17.42
Pab_3 Ciment 34.13 34.13
Viga_Ciment 7.77 7.77
Zapatas 26.36 26.36
Pab_4 Ciment 31.08 31.08
Viga_Ciment 5.85 5.85
Zapata Comb_3 5.50 5.50
Zapatas 19.72 19.72
Total general 132.42 31.32 163.74