Cimentacion Pab_2 Sector_1 Ciment Viga_Ciment 36.22 19.58 67.79 8.473 f'c=280 Kg/cm2 Tipo MS Ejecutado
Viga_Ciment 36.22 19.58 67.79 8.473
Cimentacion Pab_2 Sector_1 Ciment Zapata Comb_3 0.500 5.500 19.80 12.38 11.00 6.188 f'c=280 Kg/cm2 Tipo MS Ejecutado
Zapata Comb_3 19.80 12.38 11.00 6.188 www.autodesk.com/revit
Cimentacion Pab_2 Sector_1 Ciment Zapatas 75.49 47.18 56.32 22.316 f'c=280 Kg/cm2 Tipo MS Ejecutado
Zapatas 75.49 47.18 56.32 22.316
3D Ejecutado
1
Pab_2 Sector_1 Ciment: 78 131.51 79.13 135.11 36.977
Cimentacion Pab_2 Sector_2 Ciment Viga_Ciment 27.55 14.89 57.53 7.191 f'c=280 Kg/cm2 Tipo MS Ejecutado
Viga_Ciment 27.55 14.89 57.53 7.191
Cimentacion Pab_2 Sector_2 Ciment Zapata Comb_3 Z-A Pab_2 A=1.00 0.500 5.500 9.68 6.05 5.50 3.025 f'c=280 Kg/cm2 Tipo MS Ejecutado
Zapata Comb_3 9.68 6.05 5.50 3.025
Cimentacion Pab_2 Sector_2 Ciment Zapatas 57.95 36.22 45.48 17.424 f'c=280 Kg/cm2 Tipo MS Ejecutado
Zapatas 57.95 36.22 45.48 17.424
Pab_2 Sector_2 Ciment: 63 95.18 57.16 108.51 27.640
Grand total: 141 226.69 136.30 243.61 64.616
Consultant Consultant
Address Address
Address Address
Phone Phone
Fax Fax
e-mail e-mail
Consultant Consultant
Address Address
Address Address
Phone Phone
Fax Fax
e-mail e-mail
2 3 4 8' 10 10' 14
B
PAB_1 CIMENT No. Description Date
C
PAB_2 SECTOR_2 CIMENT PAB_4 CIMENT
G
H
L
PAB_3 CIMENT
2 3 4 5' 6"
6' 8' 10'
10 14
Foundation Concrete Pab_3 Mejoramiento del Servicio
0 Sectorización Cimiento Armado Nivel Sector Group Name_Elem h_Cim Long_Cim Excav_Cim Solado_Cim Encof_Cim Volume Strength Phase Created Educativo en la IE_558
2 1 : 200
Cimentacion Pab_3 Ciment Viga_Ciment 31.70 17.14 62.18 7.773 f'c=280 Kg/cm2 Tipo MS Ejecutado Pachacamac II - Villa el
Viga_Ciment
Cimentacion Pab_3 Ciment Zapatas
31.70
87.49
17.14
54.68
62.18
64.80
7.773
26.360 f'c=280 Kg/cm2 Tipo MS Ejecutado
Salvador - Lima - Lima.
Fases Cimiento
Zapatas 87.49 54.68 64.80 26.360
Pab_3 Ciment: 72 119.19 71.82 126.98 34.133
Grand total: 72 119.19 71.82 126.98 34.133
Foundation Concrete Pab_1
Armado
Nivel Sector Group Name_Elem h_Cim Long_Cim Excav_Cim Solado_Cim Encof_Cim Volume Strength Phase Created
Cimentacion Pab_1 Ciment Viga_Ciment 26.93 14.56 51.28 6.410 f'c=280 Kg/cm2 Tipo MS
0001
Viga_Ciment 26.93 14.56 51.28 6.410
Cimentacion Pab_1 Ciment Zapatas 90.18 56.36 50.01 27.507 f'c=280 Kg/cm2 Tipo MS Ejecutado Project number
Zapatas 90.18 56.36 50.01 27.507
Issue Date
Pab_1 Ciment: 60 117.10 70.92 101.29 33.917
Grand total: 60 117.10 70.92 101.29 33.917 Date
P-101
Cimentacion Pab_4 Ciment Zapata Comb_3 0.500 5.500 17.60 11.00 11.00 5.500 f'c=280 Kg/cm2 Tipo MS New Construction
Zapata Comb_3 17.60 11.00 11.00 5.500
Cimentacion Pab_4 Ciment Zapatas 0.500 63.11 39.44 45.13 19.721 f'c=280 Kg/cm2 Tipo MS New Construction
Zapatas 63.11 39.44 45.13 19.721
1 : 200
Pab_4 Ciment: 29 98.30 59.95 102.97 31.076
Grand total: 29 98.30 59.95 102.97 31.076 Scale
Suma de Volume_Cim Volumen de Concreto: Ejecutado ‐ Programado Phase
CIMENTACIONES IE_558 Ejecutado
Zapatas
Viga_Ciment
Zapata Comb_3
Zapatas
Viga_Ciment
Zapata Comb_3
Zapatas
Viga_Ciment
Zapatas
Viga_Ciment
Zapata Comb_3
Zapatas
Pab_1 Ciment Pab_2 Sector_1 Ciment Pab_2 Sector_2 Ciment Pab_3 Ciment Pab_4 Ciment
Sector Group