Sunteți pe pagina 1din 1

Client Name: Sociedad Minera Cerro Verde S.A.A.

Specification C-CS-50-005
Project Name: Primary Sulfide Project Page 10 of 14
Project Number: PSP108 Attachment 1_Rev. 0

FLUOR
Mining & Minerals

FIELD FABRICATION AND INSTALLATION OF HDPE PIPING

5.3 The replacement joints shall be re-established in accordance with the seven basic steps noted in this
BPS.

6. HEAT FUSION BUTT JOINT VISUAL INSPECTION GUIDELINES

6.1 The visual inspection guidelines given below are not intended to replace Code or specification
requirements, i.e. Table A341.3.2 of ASME B31.3 or Annex IX of AWS G1.10M. They are intended to
provide guidance for conducting visual inspection on heat fusion butt joints.

6.2 Manufacturer Recommendations for visual inspection shall also be used to verify butt fusion joints.

6.3 The gap (A) between the two single beads, or weld undercut, must not be below the fusion surface
throughout the entire circumference of the butt joint.

6.4 The displacement (V) between the fused ends must not exceed 10% of the pipe/fitting minimum wall
thickness or 1/16” (1.5 mm); whichever is less.

6.5 The outer bead must be “rolled back” fully against the wall of the pipe/fitting.

Proper Roll-Back

Improper Roll-Back

Y:\103\109 ENGDOC\109.2 CONSPEC_CS\PIPING\C-CS-50-005\C-CS-50-005 ATTACHMENT 1_REV0.DOC PIPING