Bravo Park
Project Summary: Resurface the basketball courts, replace the
playground with shade, and resurface the walking path.
Investment: $293,400
Phase(s): 3 (2026-2028)
Ward(s): 5
Item Phase
Renovate existing basketball court surface 3
Replace existing playground with shade 3
Renovate existing walking path 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Bristol Park
Project Summary: Resurface the basketball court and add shade and
replace the playground and its shade.
Investment: $398,700
Phase(s): 3 (2026-2028)
Ward(s): 5
Item Phase
Renovate existing basketball court surface 3
New shade over existing basketball court 3
Replace existing playground with shade 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $765,771
Phase(s): 1 (2020-2022)
Ward(s): 5
Item Phase
Renovate existing basketball court surface 1
Replace existing playground with shade 1
New ramada 1
New restrooms 1
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $48,150
Phase(s): 1 (2020-2022)
Ward(s): 5
Item Phase
New shade over existing playground 1
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $4,316,130
Phase(s): 1 (2020-2022)
Ward(s): 5
Item Phase
Renovate existing track surface 1
New splash pad 1
New walking path 1
New LED lights at existing Baseball 1 field 1
Renovate irrigation system 1
Renovate existing parking lot 1
New LED lights on existing soccer field 1
New playground with shade 1
New ramada 1
New restrooms 1
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $260,370
Phase(s): 3 (2026-2028)
Ward(s): 5
Item Phase
Replace existing playground with shade 3
Renovate existing walking path 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS
El Pueblo Park
Project Summary: Projects include improvements throughout the
entire El Pueblo Complex including the Activity Center, Senior Center,
and Neighborhood Center as well as the pool and the park.
Investment: $2,470,621
Phase(s): 1 (2020-2022) and 2 (2023-2025)
Ward(s): 5
Item Phase
Park: New splash pad 2
Park: New walking path 2
Park: Renovate irrigation system 2
Park: Renovate existing parking lots 2
Park: Replace existing playground with shade 2
Park: New restrooms 2
Park: Renovate directional signage, bollards, and cable 2
Pool: Replace slide flume and stairs 1
Pool: Renovate pool plaster, tile, and deck 2
Activity Center: Renovate roof security 2
Senior Center: Renovate kitchen, paint, and shade sails 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $636,660
Phase(s): 3 (2026-2028)
Ward(s): 5
Item Phase
New walking path 3
Renovate existing basketball court surface 3
Replace existing playground with shade 3
Renovate 2 tennis court surfaces 3
Renovate existing restrooms 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS
La Mariposa Park
Project Summary: Renovation of the playground and shade over the
playground and amphitheater.
Investment: $255,145
Phase(s): 3 (2026-2028)
Ward(s): 5
Item Phase
New shade over existing amphitheater 3
Replace existing playground with shade 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $51,120
Phase(s): 2 (2023-2025)
Ward(s): 5
Item Phase
New walking path connection to the Airport Wash Greenway 2
Renovate existing half basketball court surface 2
Renovate existing walking path 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Mirasol Park
Project Summary: Renovations to the sports courts, playground,
parking lot, and utilities plus a new restroom.
Investment: $492,169
Phase(s): 2 (2023-2025)
Ward(s): 5
Item Phase
New restrooms 2
Renovate existing basketball court surface 2
Renovate existing parking lots 2
Replace existing playground with shade 2
Upgrade electrical system and lighting 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Ochoa Park
Project Summary: New shade over the playground, ramada, and area
lighting.
Investment: $238,150
Phase(s): 1 (2020-2022) and 2 (2023-2025)
Ward(s): 5
Item Phase
New shade over existing playground 1
New area lighting 2
New ramada 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Parkview Park
Project Summary: New playground and shade.
Investment: $245,565
Phase(s): 1 (2020-2022) and 2 (2023-2025)
Ward(s): 5
Item Phase
New shade over existing playground 1
New playground with shade 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $218,835
Phase(s): 2 (2023-2025) and 3 (2026-2028)
Ward(s): 5
Item Phase
Renovate existing restrooms 2
New walking path 3
Renovate existing basketball court surface 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $700,958
Phase(s): 3 (2026-2028)
Ward(s): 1 and 5
Item Phase
Renovation of the existing sections of the Rodeo Wash 3
Greenway and new improvements to an undeveloped section
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $3,852,274
Phase(s): 2 (2023-2025) and 3 (2026-2028)
Ward(s): 5
Item Phase
Park: New walking path 2
Park: Renovation of 3 existing basketball court surfaces 2
Park: New LED lights on 2 existing little league fields 2
Park: Upgrade 1 little league field lights to LED 2
Park: Renovate existing parking lots 2
Park: Replace existing playground with shade 2
Park: New playground with shade 2
Park: New LED lights on existing soccer field 2
Park: Upgrade existing lights on 2 soccer fields to LED 2
Park: Upgrade existing lights on softball field to LED 2
Park: Upgrade existing lights on Baseball 7 to LED 2
Park: Renovate existing restrooms 2
Mulcahy YMCA: Upgrade HVAC controls 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $72,225
Phase(s): 3 (2026-2028)
Ward(s): 5
Item Phase
New ramada 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $2,984,732
Phase(s): 2 (2023-2025)
Ward(s): 5
Item Phase
2 new ramadas 2
New splash pad 2
New walking path 2
Renovate existing basketball court surface 2
Renovate existing parking lots 2
Renovate existing restrooms 2
Renovate skate park 2
Renovate irrigation system 2
Replace existing playground with shade 2
Upgrade existing lights on baseball field to LED 2
Upgrade existing lights on softball field to LED 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $770,490
Phase(s): 3 (2026-2028)
Ward(s): 5
Item Phase
New LED lights on existing soccer field 3
New LED lights on existing little league field 3
New walking path 3
Renovate existing basketball court surface 3
Replace existing playground with shade 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Silverlake Park
Project Summary: Multiple projects including improvements to the
park, Quincie Douglas Center including a memorial to the Buffalo
Soldiers, and Quincie Douglas Pool.
Investment: $1,957,979
Phase(s): 1 (2020-2022) and 2 (2023-2025)
Ward(s): 5
Item Phase
Park: New walking path 2
Park: New covered basketball court 2
Park: New playground with shade 2
Park: New ramada 2
Park: Renovate existing parking lots 2
Park: Renovate existing walking path 2
Quincie Douglas Center: New Buffalo Soldier Memorial 1
Quincie Douglas Center: Upgrade HVAC controls 2
Quincie Douglas Pool: Renovate pool deck 2
Quincie Douglas Pool: Replace pool slide flume 2
Quincie Douglas Pool: Renovate splash pad 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $207,045
Phase(s): 2 (2023-2025)
Ward(s): 5
Item Phase
New playground with shade 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Sunnyside Pool
Project Summary: Renovations to pool plaster, tile and deck.
Investment: $133,650
Phase(s): 3 (2026-2028)
Ward(s): 5
Item Phase
Renovate pool plaster, tile, and deck 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Swan Park
Project Summary: A new bridge over the wash and a new playground
with shade.
Investment: $385,200
Phase(s): 3 (2026-2028)
Ward(s): 5
Item Phase
New bridge over the wash 3
Replace existing playground with shade 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $353,260
Phase(s): 3 (2026-2028)
Ward(s): 5
Item Phase
Renovate west concessions and water mainline 3
Replace deteriorating roofs 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $1,230,908
Phase(s): 2 (2023-2025)
Connects: 4 parks, 5 schools
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $2,586,280
Phase(s): 2 & 3 (2023-2028)
Connects: 26 parks, 10 schools, 2 libraries
Ward(s): 1, 5, 6
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Airport Wash Greenway
Liberty Ave to S. 12th Ave
Investment: $530,950
Phase(s): 3 (2026-2028)
Connects: 3 parks, 1 school
Ward(s): 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $4,401,445
Phase(s): 2 (2023-2025)
Connects: 6 parks, 5 schools
Ward(s): 5, 6
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $2,773,840
Phase(s): 3 (2026-2028)
Connects: 4 parks, 3 schools
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $2,127,530
Phase(s): 1 (2020-2022)
Connects: 4 parks, 5 schools, 1 library
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $1,958,426
Phase(s): 1 (2020-2022)
Connects: 4 parks, 5 schools, 1 library
Ward(s): 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Andrew Street Bicycle Boulevard
Aviation Bikeway to Jessica-Mann Ave
Investment: $1,198,717
Phase(s): 1 (2020-2022)
Connects: 8 parks, 6 schools, 1 library
Ward(s): 2, 4, 5, 6
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $126,645
Phase(s): 1 (2020-2022)
Connects: 2 parks, 2 schools
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $ 738,492
Phase(s): 1 (2020-2022)
Connects: 3 parks, 2 schools
Ward(s): 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $684,954
Phase(s): 2 (2023-2025)
Connects: 15 parks, 5 schools, and 2 libraries
Ward(s): 5, 6
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Michigan / Fair Street Bicycle Boulevard
Santa Cruz River Park to Julian Wash
Investment: $ 502,921
Phase(s): 1 (2020-2022)
Connects: 10 parks, 3 schools
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Santa Clara Avenue Bicycle Boulevard
Los Reales Rd to Julian Wash Greenway
Investment: $1,126,554
Phase(s): 3 (2026-2028)
Connects: 7 parks, 8 schools
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Nebraska Street Bicycle Boulevard
Santa Clara Ave to Ajo Way
Investment: $ 666,056
Phase(s): 3 (2026-2028)
Connects: 4 parks, 3 schools
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $476,087
Phase(s): 1 (2020-2022)
Connects: 9 parks, 5 schools, 1 library
Ward(s): 1, 5, 6
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $430,432
Phase(s): 1 (2020-2022)
Connects: 1 parks, 2 schools
Ward(s): 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Palo Verde Bicycle Boulevard
3rd St to Kleindale Rd
Investment: $1,260,581
Phase(s): 2 (2023-2025)
Connects: 6 parks, 3 schools
Ward(s): 3, 5, 6
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Investment: $391,522
Phase(s): 1 (2020-2022)
Connects: 3 parks, 3 schools
Ward(s): 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Cherrybell Stravenue / Pinal Vista Bicycle
Boulevard
James Thomas Park to 18th St
Investment: $398,802
Phase(s): 1 (2020-2022)
Connects: 3 parks, 4 schools, 1 library
Ward(s): 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Treat Avenue Bicycle Boulevard
Aviation Park to Rillito River Park
Project Summary: Residential street improvements including
enhanced street crossings at Prince Rd, Glenn Rd, Speedway Blvd, 6th
Street, traffic calming to slow car speeds, wayfinding signage, pavement
markings, and landscaping to enhance the walking and biking
environment. Connects to the Loop at the Rillito River Park and to
Aviation Bikeway.
Investment: $1,438,040
Phase(s): 1 (2020-2022)
Connects: 6 parks, 6 schools, 1 library
Ward(s): 3, 5, 6