Sunteți pe pagina 1din 4

METHOD Job.

No
STATEMENT FOR
UNLOADING Doc. No. : QC/031/LGR/03/MS/002
MATERIAL
WAREHOUSE &
WORKSHOP Date BY CHECK APPRV
23-09-2017 ANDRI ZAIFFUL ERIK
STEEL
STRUCTURE
REVISION HISTORICAL SHEET

Rev. No Date Description


0 -09-2017 INITIAL SUBMISSION FOR APPROVAL
1 09-10-2017 REVISION AS COMMENTS.

INTERNAL
Rev. No Date Description
0 20-09-2017 ISSUE FOR APRROVAL
1 09-10-2017 ISSUE FOR APRROVAL

WRK – VE 2 of 6
METHOD Job. No
STATEMENT FOR
UNLOADING Doc. No. : QC/031/LGR/03/MS/002
MATERIAL
WAREHOUSE &
WORKSHOP Date BY CHECK APPRV
23-09-2017 ANDRI ZAIFFUL ERIK
STEEL
STRUCTURE

TABLE OF CONTENTS

1. Introduction
2. Scope and Purpose
3. Procedure (Excavation)
4. SHE Aspec
4.1. Manpower
4.2. Tools

WRK – VE 3 of 6
METHOD Job. No
STATEMENT FOR
UNLOADING Doc. No. : QC/031/LGR/03/MS/002
MATERIAL
WAREHOUSE &
WORKSHOP Date BY CHECK APPRV
23-09-2017 ANDRI ZAIFFUL ERIK
STEEL
STRUCTURE

1. Introduction
This method statement is developed to adopt a suitable, safe and effective method for
Unloading Material Warehouse & Workshop Steel Structure of PLTMG 20 MW
Langgur-Maluku.

2. Scope and Purpose


This procedure deals with unloading work for steel structure with excavation. It is
subject to revision depending upon requirements and site condition at the field in
consent with Safety Officer In-charge. The purpose of this procedure is to:
a. Provide approved, and controlled methodelogy for effective unloading material
works activities.
b. Bring uniformity in the job to supervision.
c. Minimize the error and non conformance.

The necessary safety precautions will be taken in selection of unloading machinery,


task briefing to workers and execution of work. The work indended to execute under
thi method statement will be carried out according to safety provisions.

3. Procedure (Lifting)
a. Clearence and baricade of field area is importane before unloading with nobody
around lifting area .
b. The spotter should be give sign to diver where the material should be unloading.
c. Unloading should be possible in dry condition. It shall be observed that rain may
change this situation.
d. Excavator position should be able to reach the material as well as length boom of
excavator.
e. Steel structure material should tie up well with Weber sling as required weight.
Than hook up at bucket of excavator with shackle.
f. Lift up material slowly from heavy vehicle to ground.
g. Make sure material has landing at ground and loose the weber sling from
excavator

WRK – VE 4 of 6
METHOD Job. No
STATEMENT FOR
UNLOADING Doc. No. : QC/031/LGR/03/MS/002
MATERIAL
WAREHOUSE &
WORKSHOP Date BY CHECK APPRV
23-09-2017 ANDRI ZAIFFUL ERIK
STEEL
STRUCTURE
4. SHE Aspec
Manpower must be use complete PPE (masker, hand glove, safety shoes, helmet)
As per requirement.

6.1 Manpower Worker


- Operator (1 person).
- Spotter (1 persons)
- Driver (1 person)
- Helper (3 person)

6.2 Tools
- Excavator
- Dump Truck
- Weber Sling
- Shackle
- Barricade Line

WRK – VE 5 of 6