Question 1 Once ACM is identi ed, the person in control or management of the workplace must:
Incorrect
Select one:
Mark 0 out of 1
a. Clearly indicate ACM using signs and labels.
b. Remove ACM.
c. Paint ACM.
Health An assessment of worker's work history, lung function test and chest x-ray. Its is a requirement for asbestos related workers.
monitoring
Question 3 An air monitoring program is required to assess asbestos exposure levels during work carried out in naturally occurring asbestos areas.
Correct
Select one:
Mark 1 out of 1
True
False
d. 31 December 2000.
Question 6 A company is required to remove 0.5 m2 of asbestos lagging (friable asbestos) from a pipe in order to carry out maintenance work. Choose the correct
Incorrect response?
Mark 0 out of 1
Select one:
a. It does not really matter who removes the asbestos as its under 10 square meters.
Question 7 Exposure to asbestos dust may cause long term disease such as mesothelioma, lung cancer or asbestosis.
Correct
Select one:
Mark 1 out of 1
True
False
Question 8 Which of the following activities are likely to cause asbestos containing material to release airborne bres (2 answers)?
Correct
Select one or more:
Mark 1 out of 1
a. Wetting gently with water.
b. Painting.
c. Drilling.
d. Grinding.
Question 9 A building is constructed prior to 31 December 2003 and a small amount of asbestos has been identi ed. Select the correct response
Correct
Select one:
Mark 1 out of 1
a. An Asbestos Register will NOT be required.
b. If the amount of asbestos is less than 10sqm an asbestos register will NOT be required.
d. An Asbestos Register will be required outlining the date the asbestos is identi ed, type of asbestos, location and condition.
Mark 1 out of 1 Often referred to as bonded asbestos it is often found in products such as asbestos cement sheeting.
Non-Friable Asbestos
Easily crumbled by hand it may include sprayed on fireproofing, soundproofing or thermal insulation.
Friable Asbestos
b. Asbestos is a naturally occurring mineral bre which can be found in rocks, sediment or soil.
c. Products containing asbestos are often referred to as Asbestos Containing Material (ACM).
Question 12 Workers are not entitled to have access to the Asbestos Management Plan?
Correct
Select one:
Mark 1 out of 1
True
False
Question 13 A person in control or management of a work premises must ensure all asbestos is identi ed in the workplace by a competent person. A competent
Partially correct person may include (2 answers):
Mark 1 out of 1
Select one or more:
a. Safety manager.
c. Occupational hygienists.
d. Health and Safety Representative.
Question 14 You have recently sold a commercial building. Your obligation is to provide a copy of the asbestos register to the person taking over management or
Correct control of the premises.
Mark 1 out of 1
Select one:
True
False
b. Power tools
Question 16 The Asbestos Management Plan will need to be reviewed? (There is more than 1 correct answer)
Partially correct
Select one or more:
Mark 1 out of 1
a. Once every 5 Years.
b. When the plan is no longer adequate for managing asbestos or ACM.
Question 17 Non Friable Asbestos does NOT change properties (i.e. becomes friable) if exposed to environmental conditions such as heat, chemicals or re.
Incorrect
Select one:
Mark 0 out of 1
True
False
a.
b.
c.
d.
Question 19 Place the following in sequence from highest risk of asbestos airborne bres to lowest risk of airborne bres
Correct
a.
b.
c.
d.
Question 21 Once you develop the Asbestos Register you will need to:
Correct
Select one:
Mark 1 out of 1
a. Provide a copy to the local safety authority.
Question 22 An asbestos management plan sets out how asbestos or ACM that is identi ed at the workplace will be managed, for example what, when and how it is
Correct going to be managed.
Mark 1 out of 1
Select one:
True
False
Question 23 Workers carrying out asbestos related work must receive training that may include:
Correct Type, uses and likely presence of asbestos in the workplace
Mark 1 out of 1 Safe work method procedures to be followed
Correct use of PPE
Select one:
True
False
False
c. When inhaled asbestos bres can penetrate the deepest part of the lungs.
Question 26 A single asbestos cement sheet must be removed to install an air conditioner. The sheet is 2 m2 in total. Choose the correct response?
Incorrect
Select one:
Mark 0 out of 1
a. Non of the answers are correct.
b. This job may be performed by the air conditioning company that is not a licensed asbestos removalist.