Sunteți pe pagina 1din 1

INSPECTION & TESTING REQUIREMENTS REVISION: 06/15/2011 CODE NUMBER: PAGE:

SAUDI ARAMCO FORM-175 REPLACES: 10/01/2002 IR121600 1 of 1


SCOPE: FIBER REINFORCED PLASTICS (FRP) Grating and FRP Components

TEST AND INSPECTION PER: 12-SAMSS-023 and specifications as noted below

(1) VISUAL INSPECTION WITNESSING BY INSPECTOR (Note 1)


(2) CERTIFICATES / RECORDS TO BE CHECKED BY INSPECTOR
(3) CERTIFICATES / DATA TO BE PROVIDED BY VENDOR / SUPPLIER / MANUFACTURER
0010
0010
*** X
Pre-Fabrication/Production Requirements
The Manufacturing Procedure
Specification Details / Notes:
For each variant component.

0020 X The Raw Material Certifications For each variant component.

0020
0010
*** X
In process inspection & test requirement
Degree of Cure
Specification Details / Notes:
Shall be determined in accordance with ASTM D 5028.

0020 X Fiber Content Shall be determined in accordance with ASTM D 2584.

0030
0010
*** X
Final inspection & test requirements
Material Tests Report
Specification Details / Notes:
Per the requirements detailed in 12-SAMSS-023.

0020 X Fire Performance Requirement Per the requirements detailed in 12-SAMSS-023.

0030 X Acceptance rejection criteria and other Visual Inspection Per the requirements detailed in 12-SAMSS-023.
Requirement

0040 X Marking, Handling, storage and shipment Per 12-SAMSS-023

0040
0010
*** X
Additional/Supplemental Requirements
Installation Documentation
Specification Details / Notes:
Detailed installation instruction and list of all components
required for successful installation.

Notes
(1) May only be waived by the responsible Saudi Aramco, ASC, or AOC
Inspection Offices.
(2) See form SA175 000003 for instructions on using this form.

End of IR121600

S-ar putea să vă placă și