ROAD PROJECT LIFE CYCLE

A standard project typically has the following four major phases: initiation, planning, implementation,
and closure.

1. Feasibility phase 2. Design phase

Generation and development of ideas Establishment of design basis


Feasibility studies Design data studies
Studies of infrastructure needs Geotechnical assessments
Layout studies Durability design
Assessment of design data Civil and structural design
Cost estimation Mechanical and electrical installations
Construction and procurement scheduling Operational risk assessment
Environmental impact assessment
Social impact assessment
3. Tender phase 4. Construction phase

Development of tender design Construction management


Management of tender procedures Quality, environmental and safety management
Value engineering Construction risk management
Preparation of contract for construction Interface coordination
Programme and budget control
Site supervision
Contract and claims management
5. Operation and maintenance (O&M)

O&M management system


Inspection of structures and installations
Ranking of maintenance and reinvestment needs
Repair and strengthening design
Institutional development and training
Quality management

1
Highway & Motorway Urban Road Rural Road
 Project preparation and  Surveys  Surveys
planning  Noise abatement analysis  Material investigation and
 Field surveys and  Road safety audits testing
investigations  Road traffic accident  Pavement condition
 Special studies and tasks analysis studies
 Feasibility studies  Traffic simulation and  Feasibility studies
 Design modelling  HDM-4 analysis
 Tendering and  Vulnerable roadusers  Road design
procurement  School travel planning  Pavement design
 Contract administration analysis  Environmental impact
and construction  Traffic action plans assessment (EIA)
supervision  Speed control planning  Social impact assessment
 Operation and  Impact assessment  Procurement
maintenance  Environmental impact  Tendering
 Institutional development assessment (EIA)  Construction supervision
and training  Economic analysis  Maintenance
 Quality management  Integrated design of  Quality management
roads, sewers, lighting
and road furniture

Pavement Road Facility


 Surveys  Road safety audits
 Pavement condition studies  Road traffic accident analysis
 Pavement analysis and modelling  Traffic simulation and modelling
 Pavement design  Vulnerable roadusers
- Flexible and semi-rigid pavements  School travel planning analysis
- Rigid pavements  Traffic action plans
- Low-noise pavements  Speed control planning
- Special pavements, e.g. container  Social impact assessment
terminals  Education
- Innovative pavements  Environmental impact assessment (EIA)
 Recycling  Economic analysis
 Material investigations for pavements  Quality management
 Material engineering for pavements
 Pavement maintenance
 Environmental impact assessment (EIA)
 Economic analysis
 Quality management