Sunteți pe pagina 1din 1

33

Wittunga Botanic Gardens


33

27
26

28

33
33 25

23
24
10
8 12 37
9 11 33
6
29
32
5
17
7 28
22
3
35
34
4
31 21
20

Oval 16
MASTERPLAN KEY AREAS
2
Western frontage & Sports Courts (southside
gateway experience main building)
14
Northern boundary sustainable Extension to parkour
19
and creative zone playground
36 Cricket nets, shelter & picnic
table Library outdoor teaching
20
15
Eastern boundary inc swale, Junior Primary Southside
deck, path & outdoor classroom amphitheatre & fruit tree
13
orchard
1 Junior Primary Playground
18 The Gully nature play
30
17 Japanese Courtyard

Hard Play and school entry -


raised garden beds seating and
School car park
Sh

tree planting
ep
he
rd

The master plan is intended to be


s
H
ill

staged. Can you prioritise the staging


R
oa

of the master plan with your top 5


d

1 Revegetation under trees 11 New playground- climbing, slides and swings 21 Logs and stumps parkour extension 32 Junior primary courtyard with canopy over Note:
2 Low mound with revegetation 12 Outdoor tables and chairs in courtyard 22 Paving and terraced deck to library courtyard with 33 Revegetation Greybox grassy woodland areas (1 being top priority).
and budget/ Please
Design and staging is subject to detailed design
funding opportunities which are to
3 Log and ropes balance
13 New pathway 23
tables
Outdoor amphitheatre for school events and classes
34 Arbour with intermittent translucent panels
note staging of works will be subject to
be advised.
Existing verandah with intermittent translucent panels
funding and practicality of the build.
35
4 Mud play area Fruit tree orchard
14 Outdoor assembly area- future proof for 24
36 Coloured bitumen sports courts

DRAFT
5 Storage crates for loose parts play sports hall expansion 25 Water play elements- water pump/tap and
37 Junior primary deck with access from room
6 2 x renovated cricket practice nets 15 Coloured bitumen play area with large tree rock lined swales
pots and seating edges 26 Large boulders for climbing surrounded with
7 Shelter and picnic table 16 Outdoor music area with verandah- exterior softfall
sliding or bifold doors to be installed 27 Fire pit area with informal tree log and rock seating
8 Rock lined planted swale to manage
Bike storage shelters Blackwood Primary School
stormwater 17
28 Adventure trail with construction hut frames- Kaurna
9 Giant net hammock and viewing decks 18 Western shelter to retained sports courts themes and engagement. Reinterpret existing fire pit area with huts Landscape Master Plan
with seats 29 Deck over swale aligned to existing path
10 Small outdoor classroom with adjacent 19 Retain parkour with additional swings
access gate to Wittunga Botanic 30 Graduation paving walk with planting adjacent building
20 Converted quiet rooms with table tennis with SK01 20181020
step access from courts 31 Japanese garden with canopy over

PSLA
PETER SEMPLE LANDSCAPE ARCHITECT

BLACKWOOD PRIMARY SCHOOL MASTERPLAN


M: 0404 971 376
T: PETER@PSLA.COM.AU
E: PSLA.COM.AU

N
COMMUNITY SURVEY - STAGING PRIORITY DESIGNING PLAYFUL AND LIFESTYLE CONNECTIONS WITH NATURE

S-ar putea să vă placă și