Appendix 5.0- PP05/F5 - Proforma of General Submission (CGS) Rev.

La
FSDI
Cont ract Nos. RDA/SEEP/CONT-S4
Project Names: Construction of Extension of
Southern Expressway, Section 4 - Mattala to
Hambantota
Contract or's General Subm ission
(CGS)

Part A: To be prepared by Contractor


To: Engineer's Representative Mr. Dong Wei
Resubmitting proposal for change in reinforcement on end sealing works at BRI-04 P15-P16 pier
Subject:
head
Submission Ref. No. : CHEC/CGS/167/R1
Outgoing Log No. : CHEC/RDAISEEP/CONT/S4/01.21/0/4330
Specification Reference :
Drawing Reference : Oneattachment
Location of Works : Site
SUBMISSION DETAIL
Purpose of Submission : [2] 1 - For Information I Record; 2 - For Approval; 3 - For Construction; 4 - As built

Description of Content :
This is referred to Engineer review comments No.FSDI-CHEC/CGS/004303/A, end sealing works at BRI-04 P15-P16 pier head
reinforcement. Method of concrete filling of the end of pier head and its formwork have changed as per the Engineer review comments
and it is illustrated in Appendix 1. A ll the locations, levels and dimensions in the attachments are in accordance with approved working
drawings of BRI-04 reinforcement of pier.

Your earliest reply on this regards w ill be highly appreciated.

Thank you

From : Contractor's Representative/Project Manager


Nampang Senyan ~ .;_
Date. 24-Apr-18 ~\'
Signature: 'df1rJA N/A Wang Xiao Hua Shen Hon~ Zhuan
Subcontractror Originator Checked By
Distribution/Remarks:

Part B: To be Completed by En~ lneer


A - Reviewed & in line with B - Reviewed with comments: C - Fails to comply R - Returned &
Contract incorporate comments and proc and resubmit Not reviewed

Comments (enter below for each item separately or insert N/A)

Title: Name: Signature: Date:

...
APPENDIX 01

30 •
~- 2400 Pier Heo.d concrete
8'
~~ ... ; •. :·.
0
·r·: ~:· ~JJ .... : •••

0 ·. ; . - ~.. "'·
~
.. .. . . ~· .
; . : :tt·l ••. · : ,..,.,.

.. ,.. " .. ..
••• l
·~ ': '

u--u~~J. .LL _
S?l
o-4. ! n
5800 I

r
II II j 900 l 900 f ~ 900 l 900 l l
rm ~

( D

Figure 1 - Form work arrangement for BRI 04 P15-P16 Pier Head End Figure 2 - A-A .,..
Sealing

NOTES- 1. All dimensions ore in millimeters

2. This drawing is in accordance with


Approved working drawings of BRU-04
P15 P16 reinforcement of pier

.,..