Roger Wesley
Business Consultant
Aspen Technology, Inc.
roger.wesley@aspentech.com
Aspen Aspen
Process Capital
Economic Cost
Analyzer Estimator
Aspen In-Plant
Cost Estimator
Project
Area
Component
Installation Bulk
Activity network,
P&A EPC Schedule crew sizes,
durations, float,...
Execution Plan
• Contracts
• Engineering/Construction workforces
• Equipment Rental
• Project Schedule
GRADE (default)
PAD
OPEN (open steel structure)
EXOPEN (existing steel structure)
MODULE
Skirt or leg
height = 0
Buildings Site
development
User Models
FABRICATION LABOR:
• Shop [+ Field]
• Labor
• Man-hours
x
associated with each piece of equipment
x
Volumetric models automatically develop:
x
– Equipment Setting
– Volumetric P&ID
– Civil Designs x
– Steel Designs
x
– Electrical
– Insulation
– Paint
TI TI
TCV
1
4 1
TW PP PP TW
TW PP PP TW
TIC TT
1
x x
TI
TSV TI
TSV
5 6
SHELL SIDE OUTLET
3 TUBE SIDE INLET 2
Volumetric modeling:
– Provides consistent approach for piping, instrumentation,
civil/structural, electrical, insulation and paint associated with
equipment items
Versus
x
x
x
Decision Analyzer
– Analyzer Scale-Up Module (ASM)
Estimate quantity-based, conceptual costs of re-sized project
(based upon existing sized equipment list)
– Analyzer Relocation Module (ARM)
Generate conceptual costs for relocation of a base case project to
any of 89 international locations
Utility Models
– Generate utility systems based upon project scope
Instrument and plant air systems
Cooling water systems
Estimate data
Resources
Select component
models to be
included in data
entry spreadsheet
Automatically
generates
spreadsheet
with component
classes already
defined in
selected project
areas
Allows user to
select
component
models for
which data will
be exported to
spreadsheet
Can also be
used to
model
topsides for
offshore
projects
15 shipping
routes
Shipping available
with preset
accelerations