Sunteți pe pagina 1din 4

4.

2 Water
requirement
The total water
requirement will be
about 3881 m
3
/hr. The
Government
of Karnataka has
already allotted 22
MGD of water
from downstream
of TB damand
Almatti dam for the
proposed project.
The permission
obtained fordrawl
of the required
quantity of fresh
water is given in
Annexure 1-
Sanctions and
approvals. The
quantities of water
required for
various unitsof
integrated steel
plant and effluent
generated are
presented in Table
2.

S-ar putea să vă placă și