Arrangement of the requisite financing for the project.

Finalization of the layout for the proposed plant.


Design of all plant buildings, auxiliary and ancillary buildings, utilities and services.
Issue of tender documents and specifications for all equipment, selection of equipment suppliers
and placement of orders.
Finalization of arrangements for the construction of the substation for the electric power supply
system / gas distribution system. For the construction and commissioning of the plant the
following major steps are needed :
Setting up an organization for the execution of the job.
Arrangement of all construction facilities at the plant site.
Procurement of bulk of steel, cement and other constructional materials and their progressive
delivery in accordance with the construction schedule.
Obtaining foundation load and other relevant data of furnace, gas generator etc.
Preparation of tender documents for construction.
Issue of tender documents and selection of contractors for handling civil, structural,
mechanical and electrical jobs and equipment installation