Documente Academic
Documente Profesional
Documente Cultură
941201-41ER-1017-PA Page 1 of 3
Etalin Hydroelectric Project (3097 MW)
Dynamic Analysis of Concrete Gravity Dam (Tangon Limb) Annexure-2
Figure A2-2: Stress S33 Plot through End Pier of Overflow Section (MPa)
941201-41ER-1017-PA Page 2 of 3
Etalin Hydroelectric Project (3097 MW)
Dynamic Analysis of Concrete Gravity Dam (Tangon Limb) Annexure-2
Figure A2-3: Stress S33 Plot through Center of Spillway Bay of Overflow Section (MPa)
941201-41ER-1017-PA Page 3 of 3