PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT S - 01


GENERAL NOTE
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
=

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT S - 02


GENERAL NOTE
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
A
B
C
44'-6"
22'-3" 22'-3"

C4

C3
C3
24" 24" 24"

6"
1

6"
6"

12"
12"
12"
10" 12" 10"
8'-3"

9'-8"
10" 24" 10"

C2A

12"
2

20"
24"
20"

10"
10"

N
12"

C2
C1
20" 20"

1
10'-7 2"
16'-8"

10" 10"

C2A
24"

12"
3

20"
24"
20"

10"
10"

C2
12"
20"

C1
20"

14'-71 2"
16'-8"

10" 10"
C2

24"

12"
4

20"
24"
20"

10"
10"

12"

C2
C1

20" 20"

18'-91 2"
24'-4"

10" 10"
C2

24"
12"
5

20"
24"
20"

10"
10"

12"
C2

20" 20"
C1
135'-812"
19'-51 2"

10" 24" 10"


C2

12"
6

20"
24"
20"

10"
10"

12"
C2
C1

20" 20"
19'-6"

10" 24" 10"


C2

12"
7

20"
24"
20"

10"
10"

12"
C2
C1

20" 20"
19'-6"

10" 10"
C2

24"
C2A

12"
8

20"
24"
20"

10"
10"

12"
C1

20" 20"
9'-10"

24" 24" 24"


9

6"
6"
6"

12"
12"
12"

10" 12" 14"


C4
C3
C4

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT S - 03


LAYOUT PLAN OF COLUMN
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
A
B
C
44'-6"
22'-3" 22'-3"

8'-0"
4'-2" 4'-0"
2'-10"

F4

C3
3'-0"
3'-0"
2'-6"

C4
1

6'-0"
6'-0"
5'-0"

F4
F4

C3
6'-0"
8'-0"
3'-9"

9'-8"

F1

4'-9"

F2
3'-9"
C2A
2

9'-6"
7'-6"

10'-9"

N
F5

C2
C1
7'-6"
4'-9"
10'-9"
9'-6"
16'-8"

5'-412"
4'-9"
3'-9"

F1

4'-9"
5'-412"

F2
3'-9"

C2A
3

9'-6"
7'-6"

10'-9"
F5

C2
C1
7'-6"
9'-6" 10'-9"
16'-8"

5'-412"
4'-9" 4'-9"
C2

F1
5'-412"

4'-9"
4'-9"

F2
4

9'-6"
9'-6"

10'-9"

C2
F2

C1

9'-6"
9'-6" 10'-9"
24'-4"

5'-412" 4'-9"
4'-9"
C2

F1

4'-9"
4'-9"

5'-412"

F2
5

9'-6"
9'-6"

10'-9"
F2

C2
C1
135'-812"

9'-6"
9'-6" 10'-9"
19'-51 2"

5'-412" 4'-9"
4'-9"
C2

F1

4'-9"
4'-9"

5'-412"

F2
6

9'-6"
9'-6"

10'-9"
F2

C2
C1

9'-6"
9'-6" 10'-9"
19'-6"

5'-412" 4'-9"
4'-9"
C2

F1
5'-412"

4'-9"
4'-9"

F2
7

9'-6"
9'-6"

10'-9"
F2

C2
C1

9'-6" 9'-6"
10'-9"
19'-6"

10'-9"
5'-412"
4'-9"
3'-9"
C2
F1
5'-412"

4'-9"
C2A
8

9'-6"
7'-6"

10'-9"
3'-9"

F5

F2
C1

7'-6"
9'-6"
9'-10"

U.G.W.R

F3
3'-0"

2'-6"
2'-6"

F4
F4
9

5'-0"
6'-0"
5'-0"

C4
C4

C3

3'-2" 3'-2"
3'-6"
6'-0" 6'-0"
7'-0"

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT S - 04


LAYOUT PLAN OF FOOTING
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
22'-3"

12"

(3)
(3)
9'-10"

(2)
(2)

PLAN OF U.G.W.R BOTTOM SLAB


12"

22'-3"

(h)
(h)
(h)

(b)
9'-10"

(a)

(h)
PLAN OF U.G.W.R TOP SLAB
COVER

TOP & BOTTOM

12" AS PER ARCHITECTURAL PLAN 6" 12" AS PER ARCHITECTURAL PLAN 6"
5" BRICK WALL
12"

10"
10"

24" 24"
SECTION ON X-X
SECTION ON Y-Y
9'-6"
9'-6"

AS PER PLAN
AS PER PLAN

AS PER PLAN
AS PER PLAN

24" 24"
10"
10"

12"

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT S - 04A


REINF. DETAILS OF U.G.W.R
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
DRAWING NO.

14 MAR. 2018
S - 05
DATE
F.G.L. F.G.L.

VARIES

VARIES
2'-0'

2'-0'
E.G.L. COLUMN MAIN BAR E.G.L. COLUMN MAIN BAR

GB GB
24"
COLUMN TIE BAR COLUMN TIE BAR 20"

DR. M. SHAMIM Z. BOSUNIA


24"

20"
9'-0"

9'-0"

DESIGNED BY:
24" 24"
20" 20"
12"

8"
DETAILS OF COLUMN "C2"
27"

DETAILS OF COLUMN "C1" 18"

24"
18"
15"

16"
3"

3"
10'-9" 9'-6"

3" C.C. (1:3:6) 3" C.C. (1:3:6)


SECTION 1-1 SECTION 2-2

DETAILS OF FOOTING
DRG. TITLE:
5'-412" 5'-412"
15"

4'-9" 4'-9"

12"
5'-412"

COMPOSITE LIMITED
15"

MEGHNA KNIT
4'-9"
15"

CLIENT:
1 1
10'-9"

12" 12"
2 2

9'-6"
C1
5'-412"

C2

4'-9"

AT MASTERBARI SREEPUR, GAZIPUR.


TWO (02) STORIED UTILITY BUILDING
15"

NOTE

12"
fy=72 ksi,
10'-9" f'c=4000 psi
9'-6"
DETAILS OF FOOTING "F1"
DETAILS OF FOOTING "F2"

PROJECT:
DRAWING NO.

14 MAR. 2018
12" 12" 20"

S - 06
DATE
20"
24"
24"

DETAILS OF COLUMN
DETAILS OF COLUMN "C3" DETAILS OF COLUMN "C4" "C2A"

DR. M. SHAMIM Z. BOSUNIA


F.G.L. F.G.L. F.G.L.
VARIES

VARIES

VARIES
2'-0'

2'-0'

2'-0'
E.G.L. E.G.L. E.G.L.

DESIGNED BY:
COLUMN MAIN BAR COLUMN MAIN BAR COLUMN MAIN BAR

GB GB GB

COLUMN TIE BAR COLUMN TIE BAR COLUMN TIE BAR


9'-0"

9'-0"

9'-0"
18" 18" 18"

DETAILS OF FOOTING
20"

20"
18"
3"

3"

3"

DRG. TITLE:
6'-0" 5'-0" 7'-6"

3" C.C. (1:3:6) 3" C.C. (1:3:6) 3" C.C. (1:3:6)


SECTION 3-3 SECTION 4-4 SECTION 5-5

3'-0" 3'-0"
3'-9" 3'-9"

COMPOSITE LIMITED
2'-6" 2'-6"

MEGHNA KNIT
4'-0"

CLIENT:
3'-9"
3'-0"

3 3 4 4 5 5
8'-0"

6'-0"

7'-6"
C2A
3'-0"

C3 C4

3'-9"
4'-0"

AT MASTERBARI SREEPUR, GAZIPUR.


TWO (02) STORIED UTILITY BUILDING
NOTE
fy=72 ksi,
5'-0"
f'c=4000 psi
6'-0" 7'-6"
DETAILS OF FOOTING "F4"

PROJECT:
DETAILS OF FOOTING "F2"
DETAILS OF FOOTING "F3"
A
B
C
44'-6"
22'-3" 22'-3"

1
GB3(12"X24")

9'-8"
2
GB3(12"X24")

N
16'-8"
3

GB3(12"X24")
16'-8"
4

GB4(12"X24")
24'-4"
5

GB4(12"X24")
135'-812"
19'-51 2"

GB1(12"X24")
GB2(12"X24")
GB1(12"X24")
6

GB4(12"X24")
19'-6"
7

GB4(12"X24")
19'-6"

GB4(12"X24")
8
9'-10"

GB4(12"X24")
9

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT LAYOUT PLAN OF GRADE BEAM
S - 07
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
DRAWING NO.

14 MAR. 2018
8'-4" 15'-0" 15'-0" 22'-8" 6'-7"

S - 08
2

1
1" MATCH LINE

DATE
1" 1" 1" 1"

1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

1
8'-2" 5'-0" 5'-0" 5'-0" 5'-0" 4'-10" 5'-0" 7'-6" 7'-6" 7'-6" 5'-9" 9"

LONG SECTION OF GB1 (12''x24'')

11'-3" 17'-10" 17'-10" 8'-6"

DR. M. SHAMIM Z. BOSUNIA


1" 1" 1" 1"
MATCH LINE

1'-0" 1'-0" 1'-0" 1'-0"

DESIGNED BY:
5'-4" 5'-9" 5'-9" 6'-2" 5'-9" 5'-9" 6'-2" 5'-9" 8'-4"

CONTINUATION OF GB1 (12''x24'')

8'-4" 15'-0" 4 15'-0" 22'-8" 6'-7"

3
1" 1" 1" 1" 1" MATCH LINE

1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

DETAILS OF GRADE BEAM


4

8'-2" 5'-0" 4'-10" 5'-0" 5'-0" 4'-10" 5'-0" 7'-6" 7'-6" 7'-6" 5'-9" 9"

LONG SECTION OF GB2 (12''x24'')

DRG. TITLE:
11'-3" 17'-10" 17'-10" 8'-6"

1" 1" 1" 1"


MATCH LINE

1'-0" 1'-0" 1'-0" 1'-0"

COMPOSITE LIMITED
5'-4" 5'-9" 5'-9" 6'-2" 5'-9" 5'-9" 6'-2" 5'-9" 8'-4"

CONTINUATION OF GB2 (12''x24'')

MEGHNA KNIT
15'-0" 20'-1"

CLIENT:
5

1" 1" 1"

24"

24"

24"

24"
1'-0" 1'-0"
5

12'' 12'' 12'' 12''

SEC. ON 1-1 SEC. ON 2-2 SEC. ON 3-3 SEC. ON 4-4


3'-6" 6'-4" 5'-0" 6'-6" 8'-5" 5'-0"

LONG SECTION OF GB3 (12''x24'')

AT MASTERBARI SREEPUR, GAZIPUR.


TWO (02) STORIED UTILITY BUILDING
20'-1" 20'-1"
7

1" 1" 1"


24"

24"

24"

24"
1'-0" 1'-0"

12'' 12'' 12'' 12''


7

SEC. ON 5-5 SEC. ON 6-6 SEC. ON 7-7 SEC. ON 8-8

PROJECT:
5'-0" 8'-5" 6'-6" 6'-6" 8'-5" 5'-0"
LONG SECTION OF GB4 (12''x24'')
A B
22'-3"

4'-2"
4"
9'-8"

7'-3"

4'-2"
2

PLAN OF STAIR (GR. TO MEZZ.)


7'-5" 9'-2" 5'-0"
7'-5"

6'-0"
18"

12
"

4" 6" 6"

3'-
7"
3'-
7"

GB
BRICK WALL
9'-2"

9'-2"

3'-
7"
3'-

12
"
7"

12
"

20''
18"

10"

SEC. OF SB
18"
5'-0"

5'-0"

6'-0"

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT LAYOUT PLAN OF COLUMN
S - 09
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
A B
22'-3"
9'-1" 6'-8" 5'-10"

4'-2"
4"
9'-8"

4'-2"
2

9'-1" 6'-8" 5'-10"

PLAN OF STAIR (MEZZ. TO 1ST F.L)


20''
10"

9'-1"
9'-1"

SEC. OF SB

4'-6"
18"

12"
12
"

2'-
7"

12
"
2'-
7"

6'-8"
6'-8"

2'-
7"
12
"
2'-
7"

12
"
18"

18"
5'-10"
5'-10"

4'-6"

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT LAYOUT PLAN OF COLUMN
S - 09A
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
A
B
C
44'-6"
22'-3" 22'-3"

MB2(12"X24")

1
9'-8"

MB6(12"X21")

MB7(12"X21")
2
MB3(12"X24")

N
16'-8"

X
X
3
16'-8"

MB9(10"X24") MB9(10"X24")
4
24'-4"

Y
Y

MB9(10"X24") MB9(10"X24")
5
135'-812"
19'-51 2"

MB4(12"X24")
MB1(12"X24")

MB8(12"X24")

SEE DRG. NO. S-13


6

DETAILS OF SEC. X-X & Y-Y


19'-6"
7
19'-6"

MB3(12"X24")
8
9'-10"

MB6(12"X21")

MB7(12"X21")
9

MB5(12"X24")

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT LAYOUT PLAN OF MEZZANINE BEAM
S - 10
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
DRAWING NO.

14 MAR. 2018
S - 11
8'-4" 15'-0" 15'-0" 22'-8" 6'-7"

DATE
1

2
1" 1" 1" MATCH LINE

1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"

2
8'-4" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-6" 5'-9" 10"

DR. M. SHAMIM Z. BOSUNIA


LONG SECTION OF MB1 (12''x24'')

11'-3" 17'-10" 17'-10" 8'-6"

1" 1" 1" 1"

DESIGNED BY:
MATCH LINE

1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

5'-5" 5'-9" 5'-9" 6'-4" 5'-9" 5'-9" 6'-4" 5'-9" 8'-6"


CONTINUATION OF MB1 (12''x24'')

DETAILS OF MEZZANINE BEAM


20'-1" 6'-0"
4

DRG. TITLE:
1'-0" 1'-0"

3'-0"
MB7
4

5'-0" 8'-7" 6'-6" 6'-0"


LONG SECTION OF MB2 (12''x24'')

20'-1"

COMPOSITE LIMITED
5
6

MEGHNA KNIT
1'-0" 1'-0"

CLIENT:
3'-0" 3'-0"
MB7
6

5'-0" 10'-1" 5'-0"


LONG SECTION OF MB3 (12''x24'')

AT MASTERBARI SREEPUR, GAZIPUR.


TWO (02) STORIED UTILITY BUILDING
24"

24"

24"

24"

24"

24"
12" 12" 12" 12" 12" 12"

SEC. ON 1-1 SEC. ON 2-2 SEC. ON 3-3 SEC. ON 4-4 SEC. ON 5-5 SEC. ON 6-6

PROJECT:
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"
DRAWING NO.

14 MAR. 2018
S - 12
8'-4" 15'-0" 15'-0" 22'-8" 6'-7"

DATE
7

8
1" 1" 1" MATCH LINE

1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"

8
8'-4" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-6" 5'-9" 10"

LONG SECTION OF MB4 (12''x24'')

DR. M. SHAMIM Z. BOSUNIA


11'-3" 17'-10" 17'-10" 8'-6"

1" 1" 1" 1"


MATCH LINE

DESIGNED BY:
1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

5'-5" 5'-9" 5'-9" 6'-4" 5'-9" 5'-9" 6'-4" 5'-9" 8'-6"

CONTINUATION OF MB4 (12''x24'')

DETAILS OF MEZZANINE BEAM


20'-1" 20'-1"

10
9

DRG. TITLE:
1'-0" 1'-0" 1'-0" 1'-0"

10
MB7
9

5'-0" 8'-7" 6'-6" 6'-6" 8'-7" 5'-0"

LONG SECTION OF MB5 (12''x24'')

20'-5" 20'-5"

COMPOSITE LIMITED
18
17

MEGHNA KNIT
1'-0" 1'-0" 1'-0" 1'-0"

CLIENT:
2'-6"
17

18

MB8

5'-0" 8'-11" 6'-6" 6'-6" 8'-11" 5'-0"

LONG SECTION OF MB9 (10''x24'')

AT MASTERBARI SREEPUR, GAZIPUR.


TWO (02) STORIED UTILITY BUILDING
24"

24"

24"

24"

24"

24"

24"
12" 12" 12" 12" 12" 12" 12"

PROJECT:
SEC. ON 7-7 SEC. ON 8-8 SEC. ON 9-9 SEC. ON 10-10 TYP. SEC. ON MB6 SEC. ON 17-17 SEC. ON 18-18
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"
GROUND FLOOR
5'-0"
7'-0" 5'-0" VARIES FROM 24"
0" TO 36"
1'-6"

WALK WAY IN MEZZ. FL.

MB4
12"

SECTION ON X-X
SECTION ON M-M

2'-7"

M
M

COLUMN LINE
1'-0"

24"
7'-1"

6"
MB8
1'-6"
12"

3'-6"
DETAILS OF MB8

6"

21"
12"

6"
DETAILS OF MB6

GROUND FLOOR
12'-0"
LANDING SLAB

WALK WAY IN MEZZ. FL.

MB4

21"
SECTION ON Y-Y
12"

6"
2'-7"
DETAILS OF MB7

24"
COLUMN LINE
12"
12"

MB8
7'-1"

3'-6"

6"

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT DETAILS OF MEZZANINE FLOOR
S - 13
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
A
B
C
44'-6"
22'-3" 22'-3"

1FB6(12"X24")

1
9'-8"

1FB16(12"X24")
2

1FB7(12"X24")

N
16'-8"

1FB1(14"X24")
3

1FB8(14"X24")
16'-8"

1FB2(14"X24")
4

1FB9(14"X24")

1FB3(14"X24")
24'-4"

1FB3(14"X24")
5

1FB10(14"X24")
135'-812"
19'-512"

1FB4(14"X24")
1FB13(15"X25")

1FB15(15"X25")
1FB14(15"X25")
6

1FB10(14"X24")

1FB5(14"X24")
19'-6"

1FB5(14"X24")
7

1FB10(12"X25")

1FB5(14"X24")
19'-6"

1FB5(14"X24")

1FB11(12"X24")
SLAB THICKNESS = 8"
8
9'-10"

1FB16(12"X24")
9

1FB12(12"X24")

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT LAYOUT PLAN OF 1ST FLOOR BEAM
S - 14
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
21'-7" 13'-11"

1
1'-0" 1'-0"

24"
3'-0"

1
14"

5'-0" 10'-1" 6'-6" 4'-9" 5'-9" 3'-6"


SEC. ON 1-1
LONG SECTION OF 1FB1 (14''x24'') SCALE : 3/8" = 1'-0"
21'-7" 16'-3"

24"
1'-0" 1'-0"

3'-0" 14"
4

3
SEC. ON 2-2
SCALE : 3/8" = 1'-0"
5'-0" 10'-1" 6'-6" 5'-3" 7'-1" 4'-0"
LONG SECTION OF 1FB2 (14''x24'')
21'-7" 20'-3"
6

5
1'-0" 1'-0"

3'-0" 3'-0"
6

5'-0" 10'-1" 6'-6" 6'-3" 9'-1" 5'-0"

LONG SECTION OF 1FB3 (14''x24'')


21'-7" 21'-7"
8

1'-0" 1'-0"

3'-0" 3'-0"
8

5'-0" 10'-1" 6'-6" 6'-6" 10'-2" 5'-0"

LONG SECTION OF 1FB4 (14''x24'')

21'-7" 21'-7"
10

1'-0" 1'-0"

3'-0" 3'-0"
10

5'-0" 10'-1" 6'-6" 6'-6" 10'-2" 5'-0"

LONG SECTION OF 1FB5 (14''x24'')


24"

24"

24"

24"

24"

24"

24"

24"

14" 14" 14" 14" 14" 14" 14" 14"

SEC. ON 3-3 SEC. ON 4-4 SEC. ON 5-5 SEC. ON 6-6 SEC. ON 7-7 SEC. ON 8-8 SEC. ON 9-9 SEC. ON 10-10
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT DETAILS OF 1ST FLOOR BEAM
S - 15
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
20'-1" 6'-0"

12

11

24"

24"
1'-0" 1'-0"

3'-0" 12" 12"

12

11
SEC. ON 11-11 SEC. ON 12-12
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"
5'-0" 8'-7" 6'-6" 6'-0"
LONG SECTION OF 1FB6 (12''x24'')

20'-1" 8'-0"

24"

24"
14

13
12" 12"
1'-0" 1'-0"

3'-0" SEC. ON 13-13 SEC. ON 14-14


14

13
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"

5'-0" 8'-7" 6'-6" 8'-0"


LONG SECTION OF 1FB7 (12''x24'')

20'-1" 12'-0"
16

15

1'-0" 1'-0" 1'-0" 9"

3'-0" 2'-0"
16

15

5'-0" 8'-7" 6'-6" 4'-0" 5'-0" 3'-0"

LONG SECTION OF 1FB8 (14''x24'')

20'-1" 16'-0"
18

17

1'-0" 1'-0" 1'-0" 9"

3'-0" 3'-0"
18

17

5'-0" 8'-7" 6'-6" 5'-0" 7'-0" 4'-0"

LONG SECTION OF 1FB9 (14''x24'')

20'-1" 20'-1"
20

19

1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"
20

19

5'-0" 8'-7" 6'-6" 6'-6" 8'-7" 5'-0"

LONG SECTION OF 1FB10 (14''x24'')


24"

24"

24"

24"

24"

24"

14" 14" 14" 14" 14" 14"

SEC. ON 15-15 SEC. ON 16-16 SEC. ON 17-17 SEC. ON 18-18 SEC. ON 19-19 SEC. ON 20-20
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT DETAILS OF 1ST FLOOR BEAM
S - 16
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
DRAWING NO.

14 MAR. 2018
S - 17
20'-1" 20'-1"

DATE
21

22
1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"

22
21
5'-0" 8'-7" 6'-6" 6'-6" 8'-7" 5'-0"

LONG SECTION OF 1FB11 (12''x24'')

DR. M. SHAMIM Z. BOSUNIA


20'-1" 20'-1"

DESIGNED BY:
23

24
1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"

24
23
5'-0" 8'-7" 6'-6" 6'-6" 8'-7" 5'-0"
LONG SECTION OF 1FB12 (12''x24'')

DETAILS OF 1ST FLOOR BEAM


1 2 3 4 5
8'-4" 15'-0" 15'-0" 22'-8" 6'-7"
25

26

1" 1" 1" MATCH LINE

DRG. TITLE:
1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"
25

28

8'-4" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-6" 5'-9" 10"

LONG SECTION OF 1FB13 (15''x25'')


6 7 8 9
11'-3" 17'-10" 17'-10" 8'-6"

COMPOSITE LIMITED
1" 1" 1" 1"
MATCH LINE

MEGHNA KNIT
CLIENT:
1'-0" 1'-0"

3'-0" 3'-0" 3'-0" 3'-0"

5'-5" 5'-9" 5'-9" 6'-4" 5'-9" 5'-9" 6'-4" 5'-9" 8'-6"

CONTINUATION OF 1FB13 (15''x25'')

AT MASTERBARI SREEPUR, GAZIPUR.


TWO (02) STORIED UTILITY BUILDING
24"

24"

24"

24"

25"

25"
12" 12" 12" 12" 15" 15"

PROJECT:
SEC. ON 21-21 SEC. ON 22-22 SEC. ON 23-23 SEC. ON 24-24 SEC. ON 25-25 SEC. ON 26-26
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"
DRAWING NO.

14 MAR. 2018
S - 18
1 2 3 4 5
8'-4" 15'-0" 15'-0" 22'-8" 6'-7"

DATE
27

28
1" 1" 1" MATCH LINE

1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

2'-0" 3'-0" 3'-0"

27

28
8'-4" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-6" 5'-9" 10"
LONG SECTION OF 1FB14 (15''x25'')

DR. M. SHAMIM Z. BOSUNIA


6 7 8 9
11'-3" 17'-10" 17'-10" 8'-6"

1" 1" 1" 1"

DESIGNED BY:
MATCH LINE

1'-0" 1'-0"

3'-0" 3'-0" 3'-0" 3'-0"

5'-5" 5'-9" 5'-9" 6'-4" 5'-9" 5'-9" 6'-4" 5'-9" 8'-6"

CONTINUATION OF 1FB14 (15''x25'')

DETAILS OF 1ST FLOOR BEAM


1 2 3 4 5
8'-4" 15'-0" 15'-0" 22'-8" 6'-7"
29

30

1" 1" 1" MATCH LINE

DRG. TITLE:
1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"
29

30

8'-4" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-6" 5'-9" 10"

LONG SECTION OF 1FB15 (15''x25'')


6 7 8 9
11'-3" 17'-10" 17'-10" 8'-6"

COMPOSITE LIMITED
1" 1" 1" 1"
MATCH LINE

MEGHNA KNIT
CLIENT:
1'-0" 1'-0"

3'-0" 3'-0" 3'-0" 3'-0"

5'-5" 5'-9" 5'-9" 6'-4" 5'-9" 5'-9" 6'-4" 5'-9" 8'-6"

CONTINUATION OF 1FB15 (15''x25'')

AT MASTERBARI SREEPUR, GAZIPUR.


TWO (02) STORIED UTILITY BUILDING
25"

25"

25"

25"

15" 15" 15" 15"

PROJECT:
SEC. ON 27-27 SEC. ON 26-26 SEC. ON 29-29 SEC. ON 30-30
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"
A
B
C
44'-6"
22'-3" 22'-3"

(b)
9'-8"
2

N
(b)
16'-8"

(b)
3

(b)
16'-8"

(b)
4

(b)
(b)
24'-4"

(b)
5

(b)
135'-812"
19'-512"

(b)
6

(b)

(a) (a)
19'-6"

(b)
7

(b)
19'-6"

(b)

SLAB THICKNESS = 8"


8

(b)
9'-10"
9

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT DETAILS OF 1ST FLOOR SLAB
S - 19
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
A
B
C
44'-6"
22'-3" 22'-3"
1

(2) (2)

(4)
(3)
(4)
(4)
9'-8"
2

N
(2) (2)

(4)
(3)
(4)
(4)
16'-8"

(2) (2)

(4)
(3)
(4)
(4)
3

(2) (2)

(4)
(3)
(4)
(4)
16'-8"

(2) (2)

(4)
(3)
(4)
(4)
4

(2) (2)

(4)
(3)
(4)
(4)

(2) (2)
(4)
(3)
(4)
(4)
24'-4"

(2) (2)
(4)
(3)
(4)
(4)
5

(2) (2)
(4)
(3)
(4)
(4)

(1) (1)
135'-812"
19'-512"

(2) (2)
(4)
(3)
(4)
(4)
6

(2) (2)
(4)
(3)
(4)
(4)
19'-6"

(4)
(3)
(4)

(4)
7

(2) (2)
(4)
(3)
(4)
(4)
19'-6"

(3)

(4)
(4)

(4)

SLAB THICKNESS = 8"


8

(2) (2)
(4)
(3)
9'-10"

(2) (2)
9

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT DETAILS OF 1ST FLOOR SLAB
S - 20
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
A
B
C
44'-6"
22'-3" 22'-3"

RFB6(12"X24")

8'-8"
9'-8"
2
RFB7(12"X24")

N
7'-4"
16'-8"

RFB1(12"X24")

7'-4"
3

RFB8(12"X24")

7'-4"
16'-8"

RFB2(12"X24")

7'-4"
4

RFB9(12"X24")
7'-1"

RFB3(12"X24")
7'-1"
24'-4"

RFB3(12"X24")
7'-1"
5

RFB10(12"X24")
8'-9"

RFB15(15"X25")
RFB14(15"X25")
RFB13(15"X25")
135'-812"
19'-51 2"

RFB4(12"X24")
8'-9"
6

RFB10(12"X24")
8'-9"
19'-6"

RFB5(12"X24")
SLAB THICKNESS = 7"
8'-9"
7

RFB10(12"X24")
8'-9"
19'-6"

RFB5(12"X24")
8'-9"

RFB11(12"X24")
8

8'-10"
9'-10"
9

RFB12(12"X24")

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT LAYOUT PLAN OF ROOF BEAM
S - 21
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
21'-7" 13'-11"

1
1'-0" 1'-0"

24"
3'-0"

1
14"

5'-0" 10'-1" 6'-6" 4'-9" 5'-9" 3'-6"


SEC. ON 1-1
LONG SECTION OF RFB1 (14''x24'') SCALE : 3/8" = 1'-0"
21'-7" 4 16'-3"

24"
1'-0" 1'-0"

3'-0" 14"
4

SEC. ON 2-2
SCALE : 3/8" = 1'-0"
5'-0" 10'-1" 6'-6" 5'-3" 7'-1" 4'-0"

LONG SECTION OF RFB2 (14''x24'')


21'-7" 20'-3"
6

1'-0" 1'-0"

3'-0" 3'-0"
6

5'-0" 10'-1" 6'-6" 6'-3" 9'-1" 5'-0"

LONG SECTION OF RFB3 (14''x24'')


21'-7" 21'-7"
8

1'-0" 1'-0"

3'-0" 3'-0"
8

5'-0" 10'-1" 6'-6" 6'-6" 10'-2" 5'-0"

LONG SECTION OF RFB4 (14''x24'')

21'-7" 21'-7"
10

1'-0" 1'-0"

3'-0" 3'-0"
10

5'-0" 10'-1" 6'-6" 6'-6" 10'-2" 5'-0"

LONG SECTION OF RFB5 (14''x24'')


24"

24"

24"

24"

24"

24"

24"

24"

14" 14" 14" 14" 14" 14" 14" 14"

SEC. ON 3-3 SEC. ON 4-4 SEC. ON 5-5 SEC. ON 6-6 SEC. ON 7-7 SEC. ON 8-8 SEC. ON 9-9 SEC. ON 10-10
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT DETAILS OF ROOF BEAM
S - 22
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
20'-1" 6'-0"

12

11

24"

24"
1'-0" 1'-0"

3'-0" 12" 12"

12

11
SEC. ON 11-11 SEC. ON 12-12
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"
5'-0" 8'-7" 6'-6" 6'-0"
LONG SECTION OF RFB6 (12''x24'')

20'-1" 8'-0"

24"

24"
14

13
1'-0"
12" 12"
1'-0"

3'-0" SEC. ON 13-13 SEC. ON 14-14


14

13
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"

5'-0" 8'-7" 6'-6" 8'-0"


LONG SECTION OF RFB7 (12''x24'')

20'-1" 12'-0"
16

15

1'-0" 1'-0" 1'-0" 9"

3'-0" 2'-0"
16

15

5'-0" 8'-7" 6'-6" 4'-0" 5'-0" 3'-0"

LONG SECTION OF RFB8 (14''x24'')

20'-1" 16'-0"
18

17

1'-0" 1'-0" 1'-0" 9"

3'-0" 3'-0"
18

17

5'-0" 8'-7" 6'-6" 5'-0" 7'-0" 4'-0"

LONG SECTION OF RFB9 (14''x24'')

20'-1" 20'-1"
20

19

1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"
20

19

5'-0" 8'-7" 6'-6" 6'-6" 8'-7" 5'-0"

LONG SECTION OF RFB10 (14''x24'')


24"

24"

24"

24"

24"

24"

14" 14" 14" 14" 14" 14"

SEC. ON 15-15 SEC. ON 16-16 SEC. ON 17-17 SEC. ON 18-18 SEC. ON 19-19 SEC. ON 20-20
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT DETAILS OF ROOF BEAM
S - 23
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
DRAWING NO.

14 MAR. 2018
S - 24
20'-1" 20'-1"

DATE
21

22
1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"

22
21
5'-0" 8'-7" 6'-6" 6'-6" 8'-7" 5'-0"

LONG SECTION OF RFB11 (12''x24'')

DR. M. SHAMIM Z. BOSUNIA


20'-1" 20'-1"

DESIGNED BY:
23

24
1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"

24
23
5'-0" 8'-7" 6'-6" 6'-6" 8'-7" 5'-0"

LONG SECTION OF RFB12 (12''x24'')

1 2 3 4 5

DETAILS OF ROOF BEAM


8'-4" 15'-0" 15'-0" 22'-8" 6'-7"
25

26

1" 1" 1" MATCH LINE

DRG. TITLE:
1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"
25

28

8'-4" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-6" 5'-9" 10"

LONG SECTION OF RFB13 (15''x25'')


6 7 8 9
11'-3" 17'-10" 17'-10" 8'-6"

COMPOSITE LIMITED
1" 1" 1" 1"

MEGHNA KNIT
MATCH LINE

CLIENT:
1'-0" 1'-0"

3'-0" 3'-0" 3'-0" 3'-0"

5'-5" 5'-9" 5'-9" 6'-4" 5'-9" 5'-9" 6'-4" 5'-9" 8'-6"

CONTINUATION OF RFB13 (15''x25'')

AT MASTERBARI SREEPUR, GAZIPUR.


TWO (02) STORIED UTILITY BUILDING
25"

25"
24"

24"

24"

24"

12" 12" 12" 12" 15" 15"

SEC. ON 21-21 SEC. ON 22-22 SEC. ON 23-23 SEC. ON 24-24 SEC. ON 25-25 SEC. ON 26-26

PROJECT:
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"
DRAWING NO.

14 MAR. 2018
S - 25
1 2 3 4 5

DATE
8'-4" 15'-0" 15'-0" 22'-8" 6'-7"

27

28
1" 1" 1" MATCH LINE

1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"

27

28
8'-4" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-6" 5'-9" 10"

DR. M. SHAMIM Z. BOSUNIA


LONG SECTION OF RFB14 (15''x25'')
6 7 8 9
11'-3" 17'-10" 17'-10" 8'-6"

DESIGNED BY:
1" 1" 1" 1"
MATCH LINE

1'-0" 1'-0"

3'-0" 3'-0" 3'-0" 3'-0"

5'-5" 5'-9" 5'-9" 6'-4" 5'-9" 5'-9" 6'-4" 5'-9" 8'-6"

CONTINUATION OF RFB14 (15''x25'')

1 2 3 4 5
8'-4" 15'-0" 15'-0" 22'-8" 6'-7"

DETAILS OF ROOF BEAM


29

30

1" 1" 1" MATCH LINE

DRG. TITLE:
1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0"

3'-0" 3'-0"
29

30

8'-4" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 7'-6" 7'-8" 7'-6" 5'-9" 10"

LONG SECTION OF RFB15 (15''x25'')


6 7 8 9
11'-3" 17'-10" 17'-10" 8'-6"

COMPOSITE LIMITED
1" 1" 1" 1"
MATCH LINE

MEGHNA KNIT
1'-0"

CLIENT:
1'-0"

3'-0" 3'-0" 3'-0" 3'-0"

5'-5" 5'-9" 5'-9" 6'-4" 5'-9" 5'-9" 6'-4" 5'-9" 8'-6"

CONTINUATION OF RFB15 (15''x25'')

AT MASTERBARI SREEPUR, GAZIPUR.


TWO (02) STORIED UTILITY BUILDING
25"

25"

25"

25"
15" 15" 15" 15"

SEC. ON 27-27 SEC. ON 26-26 SEC. ON 29-29 SEC. ON 30-30

PROJECT:
SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0" SCALE : 3/8" = 1'-0"
A
B
C
44'-6"
22'-3" 22'-3"

(b)
9'-8"
2

N
(b)
16'-8"

(b)
3

(b)
16'-8"

(b)
4

(b)
(b)
24'-4"

(b)
5

(b)
135'-81 2"
19'-51 2"

(b)
6

(b)

(a) (a)
19'-6"

(b)
7

(b)
19'-6"

(b)

SLAB THICKNESS = 7"


8

(b)
9'-10"
9

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT DETAILS OF ROOF SLAB
S - 26
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
A
B
C
44'-6"
22'-3" 22'-3"
2'-0"

1
(2) (2)

(4)
(3)
(4)
(4)
9'-8"
2

N
(2) (2)

(4)
(3)
(4)
(4)
16'-8"

(2) (2)

(4)
(3)
(4)
(4)
3

(2) (2)

(4)
(3)
(4)
(4)
16'-8"

(2) (2)

(4)
(3)
(4)
(4)
4

(2) (2)

(4)
(3)
(4)
(4)

(2) (2)

(4)
(3)
(4)
(4)
24'-4"

(2) (2)
(4)
(3)
(4)
(4)
5

(2) (2)
(4)
(3)
(4)
(4)
135'-812"
19'-51 2"

(2) (2)
(4)
(3)
(4)
(4)
6

(2) (2)
(4)
(3)
(4)
(4)

(1) (1)
19'-6"

(2) (2)
(4)
(3)
(4)
(4)
7

(2) (2)
(4)
(3)
(4)
(4)
19'-6"

(2) (2)
(4)
(3)
(4)
(4)

SLAB THICKNESS = 7"


8

(2) (2)
(4)
(3)
9'-10"

(2) (2)
9

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

TWO (02) STORIED UTILITY BUILDING MEGHNA KNIT DETAILS OF ROOF SLAB
S - 27
AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

14 MAR. 2018
LEGEND

A
8 9

A
8 9
9'-10"
9'-10"

C C

T=8" (4)

T=5"
(a)

(4)
(1)
(c)

(b) (2)
B B B B
22'-3"

22'-3"

(d)

(3) 1 2
9'-10"

B B WB2
A

(4)
REINF. PLAN OF OVERHEAD
WATER TANK BOTTOM SLAB
WB1

WB1

WB1

WB1
T=5"

T=5"
(4)
(1)

(1)
(4)
PROVIDE 3/4"(20mm) THICK PLASTER IN C C
22'-3"

22'-3"
1:4 WITH WATER PROOFING ADMIXTURE
C C
PLASTOCRETE-SUPER INCLUDING SIMUL-
TANEOUS NEAT CEMENT FINISHING (P).

USE WATER PROOFING ADMIXTURE


IN BOTTOM SLAB & WALL OF OVER
HEAD WATER TANK.
(4) (4)

WB2 WB2
A

REINF. DETAILS OF ROOF OF REINF. DETAILS OF ROOF OF


STAIR & OH. WATER TANK IN STAIR IN GRID 1& 2
GRID 8& 9

12" 12"
1'-9"

1'-9"

6'-0" 8'-5" 6'-0" 8'-6"

LONG SECTION OF WB1 (12"X21") LONG SECTION OF WB2 (12"X21")


SCALE : 1/4" = 1'-0" SCALE : 1/4" = 1'-0"

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

SIX (06) STORIED UTILITY MEGHNA KNIT DETAILS OF ROOF TOP WATER TANK
S - 28
BUILDING AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA
DATE

25 OCT. 2017
6"
10"
30"

10" 9'-6"
2'-6"

10"
6" 5"
30"
5'-6"
6"
10"
30"
10"

2'-6"
22'-5"

5"
10"

6" 5"
30"
5'-6"

PROJECT: CLIENT: DRG. TITLE: DESIGNED BY: DRAWING NO.

SIX (06) STORIED UTILITY MEGHNA KNIT DETAILS OF ROOF TOP WATER TANK
S - 29
BUILDING AT MASTERBARI SREEPUR, GAZIPUR. COMPOSITE LIMITED DR. M. SHAMIM Z. BOSUNIA