Sunteți pe pagina 1din 6

CURRICULUM VITAE

Riston Belman Sidabutar

Profession Expert Resource & Reserve Geologist


Education ST (Geology) Padjadjaran University,
Bandung - Indonesia, 2004 - 2010
Registrations IAGI (Member), MGEI (Member)
Phone +62813-9424-6868
Email riston_sidabutar@yahoo.com

Specialization Exploration and Data management, Modeling Geology, Geostatistics, Pit


Optimization, Mine Design and Mine Plan Scheduling, Mine Economic.

Expertise Riston Belman Sidabutar has seven years’ experience in the mining
industry. He has worked in PT. Pamapersada Nusantara a Mining
Contractor in Indonesia as expert resource & reserve geologist where he
do due diligence in many coal, gold, and Nickel Lateritic project in Indonesia
and overseas. He was assigned to Planning and Executions of Explorations
Program, including Geological Mapping, Stratigraphic Drilling, Explorations
Drilling, Sampling, Geophysical Logging Interpretations, Infill Drilling and
Geotechnical Drilling. Also to manage the geological data base and
Geological Modelling, Seam Correlations, Geological Structure
interpretations, and Computerized Geological and Grade/Quality
Modelling by Using Minescape, Minex, Datamine, Leapfrog Software. Also
have strong experience in mining engineering activity such as Pit
Optimizations, Mine Design & Long term Mine Schedulling by Using Pit
optimizer module Minex Software & Open Cut Module, Mincom
Minescape.

Employment Record
2011 – 2018 PT. Pamapersada Expert Resource & Reserve Geologist, Jakarta, Indonesia
2010 - 2011 PT. Optima Nusantara Energi Geothermal Reservoir Geologist, Jakarta,
Indonesia
2005 - 2010 FreeLance Exploration Geologist of Coal, Nickel, LIPI, Geohidro Geologist,
Indonesia

Languages Indonesian, English, Malay

1|P age Riston Belman Sidabutar Resume


CURRICULUM VITAE
Riston Belman Sidabutar
Software Mincom – Minescape 5.7 Core Module (Advance)
Mincom – Minescape 5.7 OpenCut Coal (Advance)
Mincom – Minescape 5.7 Stratmodel (Advance)
Gemcom – Minex 6.5 Geology (Advance)
Gemcom – Minex 6.5 Pit Optimizer (Advance)
Xpac Mine Schedulling (Basic)
Datamine Studio 3.21 Ore Modelling & Pit Design (Advance)
Datamine NPV (Advance)
Leap frog 4.0 Ore Modelling (Advance)
Map Info 12.5 (Advance)
Mapinfo Discover 3D (Advance)
ArcGIS 9.0 (Advance)
Global Mapper 17 (Advance)
Autocad 2017 (Intermediate)
Geovariance – Isatis (Intermediate)
Minitab 14 Statistical Software (Intermediate)
TSG Clay Mineral Spectral Analysis (Advance)
Rockwork & Logplot 2015 (Advance)

Trainings
2017 Leapfrog Ore Modelling 7 Days Internal PAMA
2016 Mapinfo + Discover 3D 3 Days Internal PAMA
2016 Basic Geostatistics & Isatis Software 6 Days Internal PAMA
2016 Spectral Clay Mineral Analysis 7 Days J-Resource
2015 Datamine Ore Modelling 7 Days Stania Bara Consulting
2015 Datamine Pit Design 7 Days Stania Bara Consulting
2014 Minex Drill & Blast 3 Days Gemcom Indonesia
2014 Minex Pit Optimizer 3 Days Gemcom Indonesia
2013 MGEI Course Gold Mine 7 Days G-Resouces, Sumut
2013 Astra Basic Manajemen Program 7 Days Astra, Jakarta
2013 Minescape-Open Cut 14 Days Internal PAMA
2013 Minescape-Basic & Stratmodel 7 Days Internal PAMA
2012 PAMA Basic Engineer MINON 7 Days Internal PAMA

2|P age Riston Belman Sidabutar Resume


CURRICULUM VITAE
Riston Belman Sidabutar
Key Experience: Coal

January 2018 – Present as PAMA Resource & Reserve Geologist Validation for Member of
PAMA Group Company (Thermal Coal)
PT. Asmin Bara Baronang (ABB) – Mamput, Central Kalimantan, Indonesia.
Responsibility: Exploration Planning, Updated Geological Model, Reconciliation, Pit
Optimization (Mineable Reserve), NPV, Annually Mine Scheduling, Annually Review Mining
Operation & Owning Cost Parameter, Annually Reporting.

January 2018 – Present as PAMA Resource & Reserve Geologist Validation for Member of
PAMA Group Company (Thermal Coal)
PT. Asmin Bara Jaan (ABJ) – Lemo, Central Kalimantan, Indonesia.
Responsibility: Exploration Planning, Updated Geological Model, Reconciliation, Pit
Optimization (Mineable Reserve), NPV, Annually Mine Scheduling, Annually Review Mining
Operation & Owning Cost Parameter, Annually Reporting.

January 2018 – Present as PAMA Resource & Reserve Geologist Validation for Member of
PAMA Group Company (Thermal Coal)
PT. Telen Orbit Prima (TOP) – Paring Lahung, Central Kalimantan, Indonesia.
Responsibility: Exploration Planning, Updated Geological Model, Reconciliation, Pit
Optimization (Mineable Reserve), NPV, Annually Mine Scheduling, Annually Review Mining
Operation & Owning Cost Parameter, Annually Reporting.

January 2018 – Present as PAMA Resource & Reserve Geologist Validation for Member of
PAMA Group company (Coking Coal)
PT. Suprabari Mapanindo Mineral (SMM) – Sekako, Central Kalimantan, Indonesia.
Responsibility: Exploration Planning, Updated Geological Model, Reconciliation, Pit
Optimization (Mineable Reserve), NPV, Annually Mine Scheduling, Annually Review Mining
Operation & Owning Cost Parameter, Annually Reporting.

January 2018 – Present as Geological Model Vs Mining Production Reconciliation


12 Site Pama as Mining Contractor – (ABKL, ADR, ARIA, BAYA, BEKB, BHPL, BRCB, INDO,
KIDE, KPCS, MTBU, TCMM), Indonesia.
Responsibility: Continue Updating Geological Model, Ensure Recovery Geological Model vs
Mining Production.

August 2018 – October 2018 as Project Leader Geologist for PAMA Due Dilligence Program
(Coking Coal) with
PT. Daya Bumindo Karunia (BDK) – Tumbang Lahung, Central Kalimantan, Indonesia.
Responsibility: Exploration Planning, Data Validation, Existing Geological Model Validation,
Pit Optimization (Mineable Reserve), Analysis Mining Operation & Owning Cost Parameter,
Mine Economic Reporting, NPV, Field Confirmatory of Surface Quality.

June 2018 – August 2018 as Support Geologist for EPN (Member of PAMA Group) Due
Dilligence Program (Mine Mouth Power Plant Sumbagsel-1 2x150 MW– Low Rank Coal) with
PT. Adimas Puspita Serasi (APS) – Baturaja, South Sumatera, Indonesia.

3|P age Riston Belman Sidabutar Resume


CURRICULUM VITAE
Riston Belman Sidabutar
Responsibility: Exploration Data Validation, Existing Geological Model Validation, Resources
& Reserve Estimation (Mineable Reserve) based on Mine Mouth Quality Specification.

April 2018 – June 2018 as Support Geologist for EPN (Member of PAMA Group) Due
Dilligence Program (Mine Mouth Power Plant Jambi-2 2x300 MW– Low Rank Coal) with
PT. Batubara Energi Indonesia (BEI) – Batanghari, Jambi, Indonesia.
Responsibility: Exploration Data Validation, Existing Geological Model Validation, Pit
Optimization (Mineable Reserve), Resources & Reserve Estimation (Mineable Reserve)
based on Mine Mouth Quality Specification.

March 2018 – April 2018 as PAMA Resource & Reserve Geologist Validation for PAMA Due
Dilligence Program (Thermal Coal) with
PT. Bumi Dharma Kencana (BDK) – Long iram, East Kalimantan, Indonesia.
Responsibility: Exploration Data Validation, Existing Geological Model Validation, Pit
Optimization (Mineable Reserve), Resources & Reserve Estimation, Analysis Mining
Operation & Owning Cost Parameter, Mine Economic Reporting, NPV.

January 2018 – March 2018 as PAMA Resource & Reserve Geologist Validation for PAMA
Due Dilligence Program (Thermal Coal) with
PT. ACL Gourp 3 Concession – Pendang Buntok, Central Kalimantan, Indonesia.
Responsibility: Exploration Data Validation, Existing Geological Model Validation, Pit
Optimization (Mineable Reserve), Resources & Reserve Estimation, Analysis Mining
Operation & Owning Cost Parameter, Mine Economic Reporting, NPV.

September 2017 – January 2018 as PAMA Resource & Reserve Geologist Validation for
PAMA Due Dilligence Program (Coking Coal) with
PT. Suprabari Mapanindo Mineral (SMM) – Sekako, Central Kalimantan, Indonesia.
Responsibility: Exploration Data Validation, Existing Geological Model Validation, Pit
Optimization (Mineable Reserve), Analysis Mining Operation & Owning Cost Parameter,
NPV, Mine Economic Reporting.

June 2012 – August 2014 as PAMA Head Office Resource & Reserve Expert for PAMA Due
Dilligence Exploration Program
PT. Asmin Bara Baronang (ABB) & Asmin Bara Jaan (ABJ), Mamput, Central Kalimantan,
Indonesia.
Responsibility : To Create Plan Of Explorations Drilling, Supervise of Exploration Drilling
Activity, Geotechnical Drilling, Geophysical Logging Interpretations, Seam Correlations, Coal
Sampling, Geological Modelling, Pit Design, Mineable Reserve Calculations.

Jan 2010 – June 2012 as PAMA Exploration Geologist to Pit Geologist, at PAMA Mine
Operation at PT. Telen Orbit Prima (TOP) Coal Concession, Central Kalimantan, Indonesia.
Responsibility : To support Reserve Development Drilling & support Mine Planner on
Updating Geological Model by actual coal Geometry and Quality, Define Coal Seam Pick
Roof Floor Data at open Pit Mine, Coal Sampling (Pit, Stockpile, Port), Management of Coal
Production By Type of Quality, Reconciliation.

4|P age Riston Belman Sidabutar Resume


CURRICULUM VITAE
Riston Belman Sidabutar
2005 – 2010 as Frelance Exploration Geologist (Mapping & Wellsite Drilling)
PT. Bukit Enim Energi Coal concession at South Sumatera, PT. Multi Harapan Utama (MHU)
Coal Concession at East Kalimantan, PT. Kalimantan Prima Persada (KPP) at South
Kalimantan Coal Concession Indonesia.
Responsibility : Geological Mapping to find New Prospect Area, Geological Factual Map,
Outcrop Map & Database, Wellsite Drilling, interpretation of Geophysical Logging data, Coal
Correlation, Geological Modelling.

Key Experience: Nickel

October 2015 as Resource Geologist for PAMA due diligence program


PT. Gerbang Multi Sejahtera (GMS) Nickel Laterite – Konawe, Southeast Sulawesi, Indonesia.
Responsibility: Data Validation, Geological Modelling, Resource Estimate.

November 2014 as Resource Geologist for PAMA due diligence program


PT. CLM (Holyrise Corporation) Nickel Laterite – Lampia, South Sulawesi, Indonesia.
Responsibility: Exploration Review, Geological Modelling Review, Resource Estimate.

Key Experience: Gold

June 2018 as Resource Geologist for PAMA Due Dilligence Program with
PT. G-Resources – Batangtoru, Sumatera Utara, Indonesia.
Responsibility: Data Validation, Geological Modelling, Grade Estimation, Mine Schedule,
Mining financial Modelling & Confirmatory Drilling.

April 2016 – September 2017 as Resource Geologist for PAMA Due Dilligence Program with
PT. Inti Cipta Jaya Tambang (ICJT) – Tarutung, Sumatera Utara, Indonesia.
Responsibility: Data Validation, Geological Modelling, Grade Estimation, Mine Schedule,
Mining financial Modelling & Confirmatory Drilling.

January 2014 – April 2016 as Reserve Development Geologist for Gold Exploration Program
PT. Sumbawa Juta Raya (SJR), Nusa Tenggara Barat, Indonesia.
Responsibility: Exploration Planning and Budgeting, Geological Mapping, Exploration
Supervision.

March 2016 PAMA Geologist Field Study Program Clay Mineral Ore Deposite Classification
PT. J-Resource – Jakarta, Indonesia.
Target Study : Define Ore Deposite System by Clay Mineral Characteristic.

September 2015 PAMA Geologist Field Study Program Copper Gold Porphyri Ore Deposite
PT. Bumi Suksesindo – Tumpang Pitu Banyuwangi, Jawa Timur, Indonesia.
Target Study : Ore Deposite Characteristic, Exploration, Geological Modelling, Grade
Estimation, Pit Optimization, Pit Design, Mine Schedule & Mining financial Modelling.

5|P age Riston Belman Sidabutar Resume


CURRICULUM VITAE
Riston Belman Sidabutar
January 2014 – December 2014 as Resource Geologist for PAMA Due Dilligence Program
PT. Sumbawa Juta Raya (SJR)– Sumbawa, Nusa Tenggara Barat, Indonesia.
Responsibility: Data Validation, Geological Modelling, Grade Estimation, Mine Schedule,
Mining financial Modelling & Confirmatory Drilling.

July 2013 PAMA Geologist Field Study Program High Sulfidation Ore Deposite
PT. G-Resources – Batangtoru, Sumatera Utara, Indonesia.
Target Study : Ore Deposite Characteristic, Exploration, Geological Modelling, Grade
Estimation, Pit Optimization, Pit Design, Mine Schedule & Mining financial Modelling.

6|P age Riston Belman Sidabutar Resume