Sunteți pe pagina 1din 2

SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff -June 2014) Rev 8 30-Jun-14

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
Electric Drinking Water Coolers SATIP-S-060-02 31-Dec-14 PLUMBING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

1.1 Not Applicable

2.0 MATERIAL RECEIVING

Drinking Fountain SAIC SAIC Saudi Aramco to be notified on initial delivery of DF by


2.1
Receiving Inspection S-4030 S-4030 H W type or manufacturer

Drinking Fountain SAIC SAIC


2.2
Handling, Storage and Preservation S-4030 S-4030 W S Contractor QA/QC to perform Weekly Inspection

3.0 INSTALLATION

Drinking Fountain SAIC SAIC Saudi Aramco and Contractor QC to be notified on


3.1
Inspection S-4031 S-4031 H W start of installation for each location

See SATIP L-350-07 Cement lined Carbon steel


SATIP-L-350-01 Metallic On-Plot Piping
See See
3.2 Piping SATIP-S-060-08 Copper Piping and
Remarks Remarks
SATIP-S-070-03 Thermoplastic and RTR
as applicable

See SATIP-L-108-01 Valves


See See
3.3 Valves and SATIP-J-700-01 Motor Operated Valves and
Remarks Remarks
Control Valves as applicable

See See See SATIP-N-001-01 Cold Insulation


3.4 Pipe Insulation
Remarks Remarks and SATIP-N-001-02 Hot Insulation as applicable

4.0 PRE-COMMISSIONING

4.1 Not applicable

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standards Cutoff -June 2014) Rev 8 30-Jun-14
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Electric Drinking Water Coolers SATIP-S-060-02 31-Dec-14 PLUMBING
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1 adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Saudi Aramco: Company General Use

S-ar putea să vă placă și