Sunteți pe pagina 1din 54

ROTOSTAT SERVICES PRIVATE LIMITED

Excellent Service records

A RELIABLE “PEOPLE’S” COMPANY

Contact Coordinates

Landmark Pllatinum, 603, 6th Floor, S.V. Road, 34th Road, Bandra West, Mumbai 400050

Telephone
+91- 22- 26040647, 26489580
Contact Personnel: Mr. P.S. SHUKLA (V.P- Operation) Mob: +917666536105
Contact Personnel: Mr. Hatim Rampurawala (Company Secretary) Mob: +919768912017
Email
info@rotostat.in, prem.shukla@rotostat.in, hatim.r@rotostat.in

Page | 1
2|Page
FOREWORD

A Reliable People’s Company with an Eye to Grow

Since the time of inception in 2004, JAYPEE POWER SYSTEMS (JPS), marched forward in
providing quality, well-organized and Competent services for the last seven years in the field of
Erection, Testing, Commissioning OVERHAULING of Gas, Steam Turbines, Generators,
Pumps, Compressors, Pumps, Motors, Fans etc of various capacities and all Rotary
Equipments of Various capacities including all types of Mechanical, Electrical and
Instrumentation works in the POWER, PETROCHEMICALS, FERTILIZERS, REFINERIES
& other related INDUSTRIES in INDIA.

In the year of 2009 we have formed ROTOSTAT SERVICES PRIVATE LIMITED (RSPL)

for us to expand our spectrum of activities in the field of all critical Prime Movers

and Static Equipments taking active participations critical SHUT DOWNS and

Annual Rate Contracts.

Rotostat derives its strength from the wide range of committed people that it carries along with
it in its journey to foray in the construction space. Our mission statement is to be a “Specialized
People’s Company”, Customer depend on and call their OWN”.
The Company is led by Mr. Probal Mukherjee (Ex-CEO, Gammon India) and his team of
engineers who have a proven track record of delivering various construction projects over the
last 30 years.

3|Page
4|Page
EXPERIENCE

Erection / Testing / Commissioning of all types of mechanical


equipment.

Specialization in Rotary and Static Equipments.

Renovation, up-gradation, Modernization, Repair &


Overhauling.

Repair & Maintenance Services including annual Maintenance


Contracts.

Supply And Repair Of HDPE/FRP/PVC/PP Pipe/Section


/Equipment At RIL-DMD.

Inspection and Installation.

CAPEX investments in Plant and Machinery to suit customer


requirements.

Swift mobilization of Skilled Manpower.

5|Page
OUR SPECIALISATION

Erection and Commissioning of all types of ROTARY & Static Equipments like
Gas, Steam Turbine, Diesel Generating Sets, Compressors (all types – Centrifugal
/ Reciprocating/ Screw), Pumps, Heat Exchangers, Pressure Vessels, and
Columns etc.

Maintenance Services of ROTARY & STATIC Equipments including Annual


Maintenance Contract.

Support Service for Automatic Ware House Maintenance.

Overhauling and Re-Commissioning of Gas, Steam Turbine, Turbo Blowers, Fans,


Compressors etc. replacement and renewal of worn out parts.

Highly Skilled Manpower supply to handle critical Prime Movers & Static
Equipments in ERECTION / SHUTDOWNS / PRECOMMISSIONING
ASSISTANCE.

BEST MECHANICAL CONTRACTOR OF THE YEAR AWARD BY


RIL – DMD 2012-13 & 2015-16

6|Page
7|Page
Resources and Facilities

Wide range of satisfied customers attended by various service centers


spread all over the country for immediate personalized attention.

RSPL has highly skilled and experienced Mill Wright Manpower like
Engineers, Supervisors, Mill Wright Technicians, Sarang, Foreman,
Riggers, Electrician, C&I Engineers & Technicians familiar with all
types of Rotary machines manufactured by reputed organizations of the
world.

Strong Engineering capability of planning, Cost reduction and up-


Gradation of existing facilities to meets the future challenges.

Annual Maintenance of plants for optimum generation/ production.

All types of tools & plants for the execution of various projects.

8|Page
9|Page
ANNUAL MAINTENANCE CONTRACT

1.0 Reliance Industries Limited:

1.1. Occasional Rotary Equipment Jobs:

1.1.1 Dahej Manufacturing Division (All plants), From: June 2012 and continuing.
1.1.2 Dahej Manufacturing Division (PTA 5), From: July 2015 and continuing.
1.1.3 Patalganga Manufacturing Division (All plants of Petro), From: August 2012
and continuing.
1.1.4 Patalganga Manufacturing Division (All plants of Fyber), From: August 2014
and continuing.
1.1.5 Hazira Manufacturing Division, From: May 2013 and continuing.
1.1.6 Silvassa Manufacturing Division; From: September 2013 and continuing.
1.1.7 Nagothane Manufacturing Division; From: October 2016 and continuing.

1.2. Occasional Fabrication & Static Maintenance Job:

1.2.1 Dahej Manufacturing Division, From: August 2014 and continuing.


1.2.2 Silvassa Manufacturing Division; From: September 2013 and continuing.
1.2.3 Nagothane Manufacturing Division; From: October 2016 and continuing.

1.3. Occasional Scaffolding Jobs:

1.3.1. Dahej Manufacturing Division, From: August 2013 and continuing.


1.3.2. Silvassa Manufacturing Division; From: June 2015 and continuing.

1.4. Annual Maintenance Contract for Automatic Product Handling System:

1.4.1 Silvassa Manufacturing Division; From: October 2013 and continuing.

1.5. Annual Maintenance of TMT Winders and Associated Spinning


Equipments:

1.5.1 Silvassa Manufacturing Division; From: October 2013 and continuing.


1.5.2 Patalganga Manufacturing Division From: April 2015 and continuing.

10 | P a g e
1.6. AHU Operation & Monitoring Jobs:

1.6.1 Silvassa Manufacturing Division; From: October 2013 and continuing.

1.7. Support Service for Automatic Ware House Maintenance:

1.7.1. Dahej Manufacturing Division, From: November 2014 and continuing.

1.8. Supply and Repair OF HDPE/FRP/PVC/PP Pipe/Section


/Equipment:

1.8.1. Dahej Manufacturing Division, From: April 2015 and continuing.

1.9. Contract for operation support at PTA5 bagging area:

1.9.1. Dahej Manufacturing Division, From: April 2015 and continuing.

1.10. Contract for Pre-commissioning & Commissioning activities related to


field rotary Equipments at PTA-6 plant:

1.10.1. Dahej Manufacturing Division, From: June 2015 and continuing.

1.11. Contract for Installation & Commissioning of Sim Card Packaging


Machine:

1.11.1. Reliance Infocomm Limited, Reliance Corporate Park, Navi Mumbai, From
January 2016 and continuing

1.12. Occasional Rerolling & Retubing Of Heat Exchangers:

1.12.1. Dahej Manufacturing Division, From: May 2016 and continuing.

2.0 ONGC Petro Additions Limited:

11 | P a g e
2.1.1. Services for Mechanical Maintenance & Equipment Inspection Services
(Pre- Commissioning Health Check-up) in DFCU & AU Unit, From: April 2015 and
continuing.

2.1. Annual Maintenance Contract Mechanical Maintenance- Polymer Unit.

3.0 Indorama Eleme Fertilizers & Chemicals Limited:

3.1.1. Providing Mechanical, Instrument assistance for Commissing activities


for new Ammonia & Urea project.

4.0 Industries Chimiques du Senegal:

4.1.1. Rotating Machine Maintenance.

5.0 Hindustan Petroleum Corporation Limited:

5.1.1. AMC for services for maintenance of Rotary Equipments

6.0 HPCL- Mittal Energy Limited:

6.1.1. ARC of Rotary Equipments Maintenance at HMEL refinery- Bhatinda

7.0 Torrent Power Limited:

7.1.1. AMC for Pump & Valve Maintenance at Torrent Power- Ahmadabad.

8.0 Contract Resource Petrochem Services (I) Pvt. Ltd.:

8.1.1 Rotary Equipment Maintenance and Services at DTA Reliance, Jamnagar.

8.2.2 Re-tubing Services at DTA Reliance, Jamnagar.

9.0 ThyssenKrupp Industries India Pvt. Ltd:

9.1.1 Carrying out Operation & Maintenance activity for Material Handling System for
CCPP plant at RIL Dahej Complex.

12 | P a g e
TURBINE & GENERATOR

Erection & Commissioning of all types of Gas Turbine Generator, Steam

Turbine Generator, Hydel Turbine.

Erection and Commissioning of Auxiliaries like feed pumps, heaters,

Dearators, Cooling Pumps, Fans, and Oil Pumps etc.

Repair and Maintenance Services including Annual Maintenance

Contract.

Up gradation, Repair, Overhauling and Re – Commissioning of Gas,

Steam Turbines, Turbo Blowers, Fans, and Compressors etc.

Replacement and Renewal of worn out parts.

Repair, Reconditioning and Replacement of various valves.

Repairing of EOT and Gantry crane panels.

Skilled Manpower supply including manpower supply for testing and

Commissioning.

Maintenance Services including annual maintenance.

Inspection and Installation of all types of rotary equipments.

Control and Instrumentation

Electrical
13 | P a g e
Rotostat Services Private Limited

List of works in the field of Annual Maintenance

1. Reliance Industrial Limited – Dahej

Sole Service Provider for Annual Maintenance Contract of Plants CA, GCU/CKR,
CPP, EOEG, ETP, EVA, IOP, OSP, HDPE, PVC, VCM, PET3, PTA5, CPP3.
1) Rotary Equipment And Static Equipments.
2) Fabrication of Piping And structural.
3) Scaffolding.
4) Auto Warehouse.

2. Reliance Industrial Limited – Hazira

Sole Service Provider for Annual Maintenance Contract of Plants PE1, PE2, PP1,
PBR3, SBR, ETH, PVC, PT1, PT2, PT3, EF2, TF1, ME1, ME2, ME3, VCM, CPP, BD1, ARO,
BT1, CRA.
1) Rotary Equipments.

3. Reliance Industrial Limited – Silvassa

Sole Service Provider for Annual Maintenance Contract for entire Fibre Complex
1) Rotary Equipments.
2) Static Equipments.
3) Fabrication of Piping And Structural.
4) Winders & Associated Spinning Equipments.
5) Automatic Product Handling System.
6) Air Handling Unit Operation & Monitoring.

4. Reliance Industrial Limited – Patalganga

Sole Service Provider for Annual Maintenance Contract for Petrochemical


Complex of Plants PTA, PX, LAB, EC, Utility, PSF, PFY.
1) Rotary Equipments.
Annual Maintenance Contract for Fibre Complex
1) Rotary Equipments.
2) Static Equipments.
3) Fabrication of Piping And Structural.
14 | P a g e
Rotary Equipment’s

Gas Turbine Steam Compressors Turbo Pumps & Extruder


Turbine Compressors Motors, Fans
Blowers

Mar 2017 : Contract for providing Specialized Support Services for Rotating
Equipment’s for Turnaround 2016 for Oman Oil Refineries and
Petroleum Industries Company (ORPIC)

Dec 2016 : Commissioning of Howden Compressors TF14 at ONGC Petro


Additions Limited- Dahej

Dec 2016 : Major Inspection of GE make Frame 9E Gas Turbine at Essar


Hazira.

Dec 2016 : Overhauling of Jamnax 1-2 trains at RIL Jamnagar through Man
Diesel & Turbo India Ltd.

Dec 2016 : GA953 & GA929, cooling tower fan Overhauling for LAB plant at
RIL Patalganga.

Dec 2016 : Rotary Jobs During Shutdown for HDPE at RIL Dahej.

Dec 2016 : Motor overhauling for PE1, Service F/Motor Overhauling


for PVC plant, Motor Overhauling for VCM plant SD at RIL Hazira.

Dec 2016 : Misc. Rotary Jobs during PTA-1 Annual SD at RIL Hazira.

Nov 2016 : K320, K950 compressor and K115 gearbox Overhauling.

Nov 2016 : Expander Compressor O/H During S/D At GCU At RIL Dahej.

Nov 2016 : Miscellaneous Rotary Job GCU/EPRU at RIL Dahej.

15 | P a g e
Nov 2016 : Overhauling Of Compressor K 301 of IOP plant at RIL Dahej.

Nov 2016 : CG Turbine & Compressor Overhauling (K45 & KT 45) of GCU at
RIL Dahej.
Nov 2016 : Replacement of dry seals Compressors (K101 & K301) of EPRU at
RIL Dahej.

Nov 2016 : PTA2 Emergency FSD job at RIL Hazira.

Nov 2016 : Rotary Equipment Overhauling - PE1 SD at RIL Hazira.

Oct 2016 : Major Inspection of GT # 8 at RIL Hazira through Shakti Turbine


Engineering.

Sept 2016 : Combustion Inspection of Frame 5 for BGGTS at HPCL Mumbai.

Sept 2016 : Centrifuge Rotor Replacement for PVC plant at RIL Dahej.

Sept 2016 : Rotor preservation job for CES at RIL Hazira.

Sept 2016 : Rotary Equipment and Fin-fan PM Jobs & Vacuum Pump
Overhauling PTA1 SD At RIL Hazira.

Aug 2016 : Rotary job during PBR AUG16 Shutdown at RIL Hazira.

Aug 2016 : PTA Fin Fans Inspection Job at RIL Hazira.

Aug 2016 : Installation of Water Pump At Lodhivali Township.

Aug 2016 : Rotary Equipment and Finfan Pm Jobs at RIL Hazira.

Aug 2016 : Vacuum Pump Overhauling PTA1 SD 2016 at RIL Hazira.

Aug 2016 : Service For Motor Overhauling PTA 1 at RIL Hazira.

July 2016 : Overhauling of ID fan GB803 at RIL Patalganga.

July 2016 : Overhauling of pump GB801C at RIL Patalganga.


16 | P a g e
July 2016 : Rotary job for CCPP construction at RIL Hazira.

July 2016 : Oxygen Compressor Overhauling at RIL Hazira.

June 2016 : HGPI of 21-GTG- 4 at Eleme Petrochemicals, Nigeria

June 2016 : Inspection & Overhauling of Lean Gas Compressor at GPU, GAIL
India Ltd at Gandhar Complex.

June 2016 : Dismantling & Inspection of Frame 7 running gear, removal of


(4#) of piston assemblies and valves of Compressor at HPCL
Mumbai.

June 2016 : PTA Dryer inspection and ASD OH at RIL Hazira.

June 2016 : PTA2 Finfan Replacement & PM ASD-16 at RIL Hazira.

June 2016 : PTA-2 Rotary Equipment PM Jobs ASD-2016 at RIL Hazira.

June 2016 : MTR O/H Job during PTA2 Plant at RIL Hazira.

June 2016 : P-900 rotor Assembly & dismantling at RIL Hazira

May 2016 : Major OH of 25 MW AT ACC, Raipur.

May 2016 : CMI Modification &Upgradation Jobs at RIL Patalganga

April 2016 : Electric Motor Replacement at RIL Patalganga.

April 2016 : M302-Repair & O/H Centrifugal Pump at RIL Hazira.

April 2016 : Contract for providing Specialized Support Services for Rotating
Equipment’s for Turnaround 2016 for Oman Oil Refineries and
Petroleum Industries Company (ORPIC)

March 2016 : G1-301M Oxygen RX Main Motor Removal Sd2016

March 2016 : GB2601A/B/S Complete Refurbishment at RIL Hazira.


17 | P a g e
March 2016 : Major Inspection by dismantling & Assembling of Rotor at ONGC
Hazira.

Feb 2016 : PTA-2 VACUUM PUMP OVERHAULING at RIL Hazira.

Feb 2016 : HGPI of GT#2 Gas Turbine at IOCL Vadodara.

Feb 2016 : Major Overhaul 16MW at Jubilant life sciences limited

Feb 2016 : Major Inspection of GT#3 Gas Turbine at ONGC Hazira.

Jan 2016 : Major Inspection of Frame # 6 Gas Turbine at IOCL Vadodara.

Jan 2016 : Extended HGPI of Frame # 6 Gas Turbine at RRVUNL, Ramgarh.

Jan 2016 : Major Overhaul at of Steam Turbine at Kauntam Paper

Nov 2015 : Dismantling & Inspection of Frame 7 running gear, removal of


(4#) of piston assemblies and valves of Compressor at HPCL
Mumbai.

Dec 2015 : Rotor Replacement of GT-3 Generator at Eleme Petrochemicals,


Nigeria

Sept 2015 : GT2 Fuel Nozzle Replacement at RIL PMD.

Aug 2015 : GT2 Fuel Nozzle Replacement at EC plant, RIL PMD.


Aug 2015 : Overhauling of ESSAREC and ESSARAX machine at Essar
Jamnagar.

April 2015 : GT2 Fuel Nozzle Replacement.

Feb 2015 : GT2 Fuel Nozzle Replacement at RIL Patalganga.

Aug 2014 : Overhauling Of 23.6 Mw STG at Renuka Sugar Ltd, Maharashtra

Aug 2014 : Revival of Skoda Make 10.5 Mw Steam Turbines at Birla


Copper, Dahej
18 | P a g e
June 2014 : Dismantling of 25MW Gen at RIL – Nagothane

May 2014 : Major Inspection of GT -2 Fr # 5 Gas Turbine at Iffco – Aonla,


UP.

April 2014 : Major Overhauling of GT 2, Frame 6 Gas Turbine at Port Harcourt,


Nigeria

April 2014 : Major inspection and overhauling of MHI turbine - 1-KT-1 and 1-
KT-2 at Port-hartcourt, Nigeria

April 2014 :Overhauling of Steam Turbine at Tuticorin, Tamil Nadu

March 2014 :Minor Overhaul of 10MW Siemens Steam Turbine -


Near Chandigarh

March 2014 : Major Inspection of Frame #5 @ RIL, Nagothane

Aug 2013 : Overhauling of Steam Turbine 18MW & Gear Box at Dalmia Cement
Plant, Trichy Tamil Nadu

Dec 2013 : Major Inspection of GT#3 of Fr#6 at IOC, Baroda.

Nov 2013 :Major Overhauling of Steam Turbine @ RIL-Dahej

Sept 2013 : Major Inspection of GT#5 @ HPCL, Mumbai

May 2013 : Major Inspection Job GT-2, ESSAR HAZIRA

May 2013 : Alignment work for GT-3, ESSAR HAZIRA

May 2013 : Supervisory and execution services for Standard HGPI HCPP-1 at
ESSAR Steel, HAZIRA

May 2013 :Alignment Work of Fr. IX GT -3, At Essar Power Limited, Hazira.

19 | P a g e
Feb 2013 : Major Inspection of Gas Turbine # 2 along with up – rate at
ONGC – Uran – reg

Feb 2013 : Overhauling of Franco Tosi Steam Turbine 205MW at RLPC, Qatar.

Jan 2013 : Overhauling of Gas Turbine Generator & Load Gear at


Indorama, Port Harcourt, Nigeria.

Jan 2013 : Major Inspection of Fr 3 Gas Turbine at HPCL, Mumbai.

Dec 2012 : Erection & Commissioning of Siemens Steam Turbine at GFL


Dahej, Gujarat.

Sep 2012 : Major Inspection of GT 1 of Frame 6 Gas Turbine at RIL, Hazira.

Aug 2012 : Major Inspection of GT 4 of Frame 6 Gas Turbine at RIL, Hazira.

July 2012 : LGB Overhauling & Alignment of GT 4 at RIL, Hazira.

July 2012 : Major Inspection of GT 2 along with exhaust casing


replacement work and Gear Boxes at IOCL, Baroda.

July 2012 : Hot Gas Path Inspection of Frame 3 Gas Turbine at IOCL, Digboi

June 2012 : Hot Gas Inspection of Frame 3 GT#2 along with replacement
of Stg#2 Bucket at IOC-Digboi

June 2012 : Hot Gas Path Inspection of Fr. IX Gas Turbine (GT 2) at Essar
Power Limited, Hazira.

June 2012 : Major Inspection of Fr. VI Gas Turbine with Generator at IOCL,
Haldia.

June 2012 : Hot Gas Path Inspection of Fr. Ix (GT 2) At Essar Power Limited,
Hazira.

June 2012 : Major Inspection (Uprate) of Frame# 5 (2 Units) at RIL


Nagothane.
20 | P a g e
May 2012 : Hot Gas Path Inspection at M/S. NRL Numaligarh, Assam.

May 2012 : Hot Gas Path Inspection Fr#6 at GT#3 at M/s. IPGCL,
New Delhi.

April 2012 : Major Inspection of Frame 5 at IFFCO – Phulpur

April 2012 : Service for Gas Turbine – 1 Alignment work at Essar Power
Limited, Hazira

April 2012 : Services for Fr. Ix GT -1, Alignment Work At Essar Power Ltd,
Hazira

April 2012 : Overhauling of Franco Tosi Steam Turbine 205MW at RLPC Qatar.

March 2012 : Major Inspection (Uprate) of Frame# 5 (2 Units) at RIL


Nagothane - reg

Feb 2012 : Major Inspection of Gas Turbine # 5 at RIL Jamnagar – rag

Feb 2012 : Major Inspection of Frame VI Gas Turbine at Reliance


Industries Limited, Hazira

Feb 2012 : Bearing No.2 & 3 Inspection of Fr. IX Gas Turbine At Essar
Power Limited, Hazira

Feb 2012 : Bearing no.2 & 3 Inspection of Frame IX Gas Turbine at ESSAR
POWER LIMITED (Hazira).

Jan 2012 : Combustion Inspection of GT#6 at Reliance Utilities Pvt. Ltd.,


(SEZ) – Jamnagar of Frame-9E

Jan 2012 : Gas Turbine Uprate (Major Inspection) of Fr#6 at RIL Dahej

Jan 2012 : Combustion Inspection of Gt#6 At Reliance Utilities Pvt. Ltd.


(SEZ) – Jamnagar of Fr. Ix

21 | P a g e
March 2011 : Extended HGPI along with bearing No 2,3,4,5 Inspection,
Generator Rotor replacement and Load coupling
replacement of GTG 1 at Essar Power Limited Hazira, Surat,
Gujarat.

Dec 2011 : Services for Gt-3 HGPI Fr. Ix At Bhander Power Limited,
Hazira

Dec 2011 : Services for GT-3 HGPI (Frame 9) at Bhander Power Limited
Hazira

Dec 2011 : Overhauling of Frame 6 GT-2 at RIL Hazira

Dec 2011 : Services of STG#2 Minor Inspection at Bhander Power


Limited Hazira

Oct 2011 : Major Inspection of Frame 6 Gas Turbine at RIL Baroda

Aug 2011 : Overhauling work of Gas Turbine unit 6 (Frame 6) at RIL


Hazira

June 2011 : Bearing Inspection of Gas Turbine 3 at Essar Power Limited


Hazira

June 2011 : Major Inspection of Frame 6 Gas Turbine 7 at RIL Hazira

April 2011 : Major Inspection of Frame 5 Gas Turbine 2 at BVFCL Namrup


Assam

March 2011 : Hot Gas Inspection of Frame 5 Gas Turbine at IFFCO-ANOLA,


Bareilly

Feb 2011 : Major Inspection of Frame 6 Gas Turbine at RIL Hazira

Feb 2011 : Major Inspection of Gas Turbine 2 at TCL Babrala

Feb 2011 : Major Inspection of Gas Turbine 1 at IPGCL at New Delhi

22 | P a g e
Jan 2011 : Major Overhauling of Frame 6 Gas Turbine at Port Harcourt,
Nigeria

Jan 2011 : Major Inspection of Frame 5 Gas Turbine at KSFL


Shajahanpur

Jan 2011 : Overhauling of Mitsui GTG2 & GTG3 at HPCL Mumbai.

Jan 2011 : Hot Gas Path Inspection & Compressor Inspection, GT of


CCPP, unit no.2 at GSECL Dhuvaran

Jan 2011 : Gas Turbine Combustion Inspection at RIL Naroda.

Jan 2011 : Overhauling of MITSUI make STG # 2 at HPCL, Mumbai.

Nov 2010 : Bearing Inspection of 230MW capacity ALSTOM make GT26


gas turbine at GBPS Utran

Nov 2010 : Replacement of GT2 Exciter Bearing at RIL Patalganga

Oct 2010 : Major Inspection of Frame 3 at Gail User

Oct 2010 :Major Inspection & Generator Inspection of Gas Turbine 2 at


TPL Vatva

Oct 2010 :Major Inspection & Generator Inspection of Frame 5 Gas Turbine
4 at IOCL Digboi

Oct 2010 : Major Inspection & Generator Inspection of Frame 6 Gas Turbine
at RIL Patalganga

Oct 2010 : Major Inspection of Frame 6 Gas Turbine at RIL Hazira

Oct 2010 : Extended Hot Gas Path Inspection of Frame 6 Gas Turbine
(Unit 1 & 3) at GACL Dahej

Sept 2010 : Major Inspection of Frame 6 Gas Turbine at RIL Hazira

23 | P a g e
Sept 2010 : Bearing Inspection of Frame 6 Gas Turbine at IOCL Mathura

Sept 2010 : Hot Gas Path Inspection of Frame 6 Gas Turbine at RRVUNL
Ramgarh

Aug 2010 : Major Inspection of Frame 5 Gas Turbine at RIL Nagothane

Aug 2010 : Major Inspection of Frame 6 Gas Turbine at Utran

Aug 2010 : Major Inspection with modification of Frame 6 Gas Turbine at


HPCL, Haldia

Aug 2010 : Hot Gas Path Inspection of Frame 6 Gas Turbine at RIL
Jamnagar

Aug 2010 : Hot Gas path Inspection load Gear Box of Frame 6 FA Gas
Turbine at Dubaran

July 2010 : Combustion Inspection of Frame 6 Gas Turbine at IPCL


Baroda

July 2010 : Hot Gas Path Inspection of Frame 6 Gas Turbine at Dholpur

July 2010 : Hot Gas Path Inspection of Frame 6 at IPCL Baroda

July 2010 : Hot Gas Path Inspection of Frame 9 at GIPCL Baroda

July 2010 : Hot Gas Path Inspection of Frame 9 Gas Turbine at Essar
Power Limited Hazira

June 2010 : Combustion Inspection of Frame 6 Gas Turbine at Ril Dahej

June 2010 : Train Alignment of Frame IX GTG 1 at Essar Jamnagar.

June 2010 : Alignment of Steam Turbine to compressor and


Compressor to expander at Deepak Fertilizer Taloja.

June 2010 : Overhauling of Cracked Gas compressor Turbine at


RIL, Dahej.
24 | P a g e
June 2010 : Alignment of Steam Turbine to compressor and
Compressor to expander at Deepak Fertilizer Taloja.

June 2010 : Overhauling of Cracked Gas compressor Turbine at


RIL Dahej.

May 2010 : Major Inspection of GTG at GSEC Utran.

April 2010 : Major Inspection of GT # 2 at NRL, Numaligarh

April 2010 : Overhauling of 7.2 MW Mitsui make at HPCL, Mumbai.

Mar 2010 : Major Inspection of Frame -VI Gas Turbine at RIL – Hazira

Mar 2010 : Major Inspection of Frame -V Gas Turbine at ESSAR STEEL


LTD - Hazira

Feb 2010 : Hot Gas Path Inspection of GT #2 at Torrent Power, Vatwa,


Ahmedabad

Jan 2010 : Combustion Inspection of Fr#6 at GAFC Baroda

Jan 2010 : Major Inspection of GT#1 at RIL-Jamnagar

Jan 2010 : Major Inspection of Frame – VI Gas Turbine at RIL-Hazira

Jan 2010 : HGPI of Frame – VI Gas Turbine at Sai Regency Power


Corpn Ltd, Ramnathpuram

Jan 2010 : HGPI of Frame – VI Gas Turbine at RIL-Naroda,

Jan 2010 : HGPI of Frame – IX Gas Turbine at Essar Power Ltd, Hazira

Dec 2010 : Overhauling of MITSUI make STG # 3 at HPCL, Mumbai.

Dec 2009 : Combustion Inspection of Fr# 6 at GSFC –Baroda

25 | P a g e
Dec 2009 : Combustion & Baroscopic Inspection of GT-2 Frame-V at
Haldia Refinery

Nov 2009 : Major Inspection & Generator Inspection of Fr#6 GT # 1 at


IOCL –Baroda.

Nov 2009 : LGB replacement, alignment, coupling, and bearing inspection Jobs
on GT # 2 at IOCL- Haldia

Nov 2009 : Combustion Inspection of GT # 2 at HPL Power Plant Haldia

Nov 2009 : Major Inspection of Frame – VI Gas Turbine at RIL-Hazira

Oct 2009 : Major Inspection & Generator Inspection of GT # 1 at


TPL Vatwa

Oct 2009 : Combustion Inspection of Fr # IV, GT # 1 at RRVUNL-Dholpur

Oct 2009 : Combustion Inspection of Frame –VI Gas Turbine at REL –


Goa.

Oct 2009 : Hot Gas Path Inspection of GT # 7 at RIL-Jamnagar

Oct 2009 : STG Inspection with train alignment at BPOL, Hazira, Surat.

Sept 2009 : Combustion Inspection & full GTG alignment of Frame V


at RIL, Nagothane, Maharashtra.

Aug 2009 : Hot Gas Path Inspection of Frame IX GTG at Bhander Power
Limited, Hazira.

July 2009 : Hot Gas Path inspection of GTG # 7 at RIL, Hazira.

July 2009 : Major Inspection of Mitsui makes GTG at HPCL, Mumbai Refinery.

July 2009 : Overhauling of GTG #2 at IOCL Baroda

July 2009 : Extended Hot Gas Path Inspection at IOCL Haldia

26 | P a g e
July 2009 : Major Inspection of GT # 2 at PPCL New Delhi

June 2009 : Overhauling of GTG #3 at IOCL Baroda

June 2009 : Additional Mechanical & Instrumentation job during CI


at IOCL Mathura

June 2009 : Major Inspection of Frame VI GT #1 at GIPCL Baroda

June 2009 : Hot Gas Path Inspection of GT #3 at IOCL Baroda

June 2009 : Replacement of LGB gear set of GT #2 at IOCL Baroda

June 2009 : Hot Gas Path Inspection of GT VII at RIL Hazira

June 2009 : Combustion Inspection of GTG in CPP at RIL Dahej

June 2009 : Extended Hot Gas Path Inspection at Maruti Udyog Ltd
Gurgaon

June 2009 : Combustion Inspection of Frame VI Gas Turbine Unit #2 at


IOCL Baroda.

June 2009 : Hot Gas Path Inspection of Frame IX GT #4 at GIPCL Baroda

July 2009 : Overhauling of 57 MW Steam Turbine Siemens-5569 (STG1) at


Bhander Power Limited.

April 2009 : Overhauling of Mitsui Gas Turbine No. 1 at HPCL MUMBAI

April 2009 : Major Inspection, LGB, AGB & Generator Inspection on


Frame 5 at CPCL, Chennai.

April 2009 : Combustion Inspection of Frame 6 of GT# 3 at IOCL,


Vadodara.

March 2009 : Overhauling of Steam Turbine, 2MCL527 & 2BCL306a of Co2


Compressor Train of Urea-II, Iffco, Anola

27 | P a g e
March 2009 : Hot Gas Path Inspection of BHEL Supplied Frame 6581 Gas
Turbine Unit no. 9 at RIL Hazira.

March 2009 : Major Inspection of Thomassen make GT at IFFCO, Aonla.

Feb 2009 : Hot Gas Path Inspection of THOMESSEN supplied Frame 6541
Gas Turbine Unit no. 2 at RIL Hazira.

Feb 2009 : Hot Gas Path Inspection of GT# 2 at Maruti Suzuki Limited,
Gurgaon, Haryana.

Feb 2009 : LGB Vibrations checking & rectification of Frame 6 at


RRVUNL, Ramgarh.

Feb 2009 : Major Inspection & Generator Inspection on Frame 3


at IOCL, Digboi, Assam.

January 2009 : Hot Gas Path Inspection of BHEL Supplied Frame 6581 Gas
Turbine Unit no. 8 at RIL Hazira.

January 2009 : Train alignment of Frame IX Gas Turbine (unit no. 1&2) at
Essar Power, Surat

Dec 2008 : Hot Gas Path Inspection FR-6 Gas Turbine at RIL Hazira.

Dec 2008 : CI/BI of Fr-5 GT # 1, 2, 3 at IOC – Mathura.

Nov 2008 : Combustion Inspection of Fr-6, GT # 3 at IOC Baroda.

Nov 2008 : Load Gear Box Inspection and Additional Jobs for Load
Coupling on Fr-6 GT # at 1 at RIL – Baroda.

Oct 2008 : Major Inspection of Fr-6 GT # 2 at GSEC – Utran

Oct 2008 : Hot Gas Inspection and Replacement of 3rd Stage. Bucket of
Fr-6 GT # 2 & 5 at RIL Jamnagar

Oct 2008 : Major Inspection and Gear Box of GT # 1 at NRL Numaligarh,


Assam
28 | P a g e
Oct 2008 : Hot Gas Path Inspection of GT # 2 Evonik Industries, Haldia

Oct 2008 : Dismantling and box up of diff. parts/accessories during


various type of maintenance of GT Barauni Refinery

Oct 2008 : Major Inspection of Frame-6 Gas Turbine at RIL Baroda

Oct 2008 : Major Inspection of Frame 6 GT# 2 at GSEC URAN.

Oct 2008 : HGPI & Bearing Inspection & 3rd stage bucket replacement
of Frame 6 GT# 2 & 5 at RIL Jamnagar.

Oct 2008 : Major Inspection & Gear Box Inspection of Frame 6 GT#1 at
NRL, Numaligarh, Assam.

Oct 2008 : Erection Testing & Commissioning of Fr-6 Gas Turbine – for
Generator Sets & their Aux. BOP, with Related Piping etc
2 X 30 MW, EPCC Package – 7 (GTG & HRSG), at IOCL –
Gujarat Refinery , Jawahar Nagar Baroda

Oct 2008 : Hot Gas Path Inspection of GT# 2 at Evonik Industries, Haldia.

Oct 2008 : Damages assessment & rebuild of Frame 9E GT# 2A at NTPC


Kawas, Surat.

Sept 2008 : Hot Gas Path Inspection and Replacement of # 3rd Stage,
Bucket of Fr-6 GT # 3 at RIL – Jamnagar

Sept 2008 : Hot Gas Path Inspection and Bearing Inspection GE Frame 6
GT maintenance

Sept 2008 : HGPI & Bearing Inspection & 3rd stage bucket replacement
of GE Frame 6.

Sept 2008 : HGPI & 3rd stage bucket replacement of Frame 6 GT# 3 at
RIL Jamnagar.

29 | P a g e
Aug 2008 : Inspection of LGB along with vibration analysis on Frame 6 of
GT # 2 at RIL, Vadodara.

Aug 2008 : Major Inspection of Frame 6 at IOCL, Vadodara.

Aug 2008 : Major Inspection & Generator Inspection on Fr 6, GT at IOCL


Baroda.

Aug 2008 : Additional Jobs on Load Gear Box Inspection along with
vibration analysis on Fr-6, GT # 2 at RIL – Baroda

Aug 2008 : Erection & Commissioning of on – line water wash system of


Fr-9 GT # 1 at NTPC – Kayamkulam.

July 2008 : Hot Gas path inspection of Frame-9 GT # 2 at NTPC –


Kayamkulam

July 2008 : Up-gradation of Fr-5 Gas Turbine and Generator at ONGC


Hazira

July 2008 : Man power services of various categories for Gas Turbine #
11 Damage Rectification work at GSEG – Hazira

June 2008 : Up – Gradation of Frame V Gas Turbine and generator at


ONGC – Hazira

June 2008 : Hot Gas Path Inspection, Inspection of BRG 1 & 2, Alignments
and AGB Inspection of Frame VI GT # 1 at RRVUNL –
Ramgarh

June 2008 : Combustion Inspection of Frame VI GT # 1 & 3 at GSECL –


Utran

June 2008 : Additional Job of Replacement of Stage 3 Buckets of Frame


VI GT # 1 at GSFC – Vadodara

June 2008 : Attending High Vibration Problem on Frame VI GT # 1 at


RRVUNL – Ramgarh

30 | P a g e
June 2008 : Erection & Commissioning of 15 MW STG API Ispat Raipur

June 2008 : Erection, Testing, Pre – Commissioning and Commissioning of


1 X 33 MW STG Sets at M/S HEG, Mandideep.

May 2008 : Major Inspection AGB, LGB, Inspection & Generator


Inspection On Frame VI GT # 2 M/S IOCL – Baroda

May 2008 : LGB Inspection Frame GT RIL – Vadodara

May 2008 : Combustion Inspection of GT # 1 at Stage Encotee Haldia

April 2008 : Major Inspection & Generator Inspection on Frame – VI GT #


3 at M/S BPCL Mumbai.

April 2008 : Erection Testing & Commissioning Together With Material


Handling of 1 X 21 MW GTG (frame – V GT) with Auxiliaries &
Piping ETC for 1X 21 MW GTG Based Cogeneration Captive
Power Plant of BRPL DHDT Project At Bongaigaon Refinery &
Petrochemicals Ltd, ASAM

April 2008 : Erection Testing & Commissioning Together with Material


Handling of 1 X 21 MW STG (Frame – V GT) with Auxiliaries &
piping ETC for 1 X 31 MW GTG based Cogeneration Captive
power plant of BRPL DHDT Project at Bongaigaon Refinery &
Petrochemicals Ltd. Assam

March 2008 : “C” Inspection of Gas Turbine # 12 Major Overhauling GT


makes Alstom Type GT#8 at GSEG Hazira

March 2008 : Additional Stay during Revamping Jobs of Frame V GT # 3 at


ONGC – Hazira

March 2008 : Gas Turbine Combustion Inspection at Sri Lanka

March 2008 : Major Inspection of Frame 6 GTG # 8 in RIL, Jamnagar.

March 2008 : Additional Problem Shooting of Frame 6 GTG # 4 in RIL,


Jamnagar.
31 | P a g e
March 2008 : Overhauling & Preventive Maintenance of GTG, STG,
Compressor, Pumps & Other Rotary Equipments in RIL, Dahej,
Bharuch.

Feb 2008 : Hot Gas Path Inspection & Replacement of 3rd Stage Bucket
of Frame 6 GT # 4 in RIL, Jamnagar.

Feb 2008 : Hot Gas Path Inspection & Replacement of 3rd Stage Bucket
of Frame 6 GT # 1 in RIL Jamnagar.

Feb 2008 : Hot Gas Path Inspection Frame 6 GT # 9 In RIL Jamnagar.

Feb 2008 : Major Inspection of Frame 3 GTG # 1 in IOC, Digboi.

Feb 2008 : Load Gear Set Replacement of GTG # 2 in RIL, Patalganga,


Maharashtra.

Feb 2008 : Major Inspection of GTG # 1 Frame 6 in IOCL, Panipat.

Jan 2008 : Major Inspection of Frame – 3 Gas Turbine # 1 at IOC –


Digboi, Assam

Jan 2008 : Hot Gas Path Inspection for Frame VI Gas Turbine # 9 at RIL –
Jamnagar

Jan 2008 : Hot Gas Path Inspection And Replacement of 3rd Stage
Bucket And Shroud For Frame VI Gas Turbine # 1 at RIL
Jamnagar

Jan 2008 : Hot Gas Path Inspection And Replacement of 3rd Stage
Bucket And Shroud For Frame VI Gas Turbine # 4 at RIL
Jamnagar

Jan 2008 : Rectification of Lube Oil Leak from Bearing No. 2 of GT in


IOCL Mathura.

Jan 2008 : Maintenance & Overhauling of Various Rotary Equipments


(GT, ST & compressors) in CFCL, KOTA.
32 | P a g e
Jan 2008 : Major Inspection of GTG # 12 in GSEG, Hazira.

Jan 2008 : Bearing & Mechanical Seal Replacement Job (STG) in RIL
Vadodara.

Jan 2008 : Bottom Shaft & Bearing Replacement Job (STG) in RIL
Vadodara.

Jan 2008 : Steam Turbine (Scoda) Alignment Job in Essar Steel Hazira,
Surat.

Jan 2008 : Overhauling & Commissioning of Various Steam Turbine,


Reciprocating & Centrifugal Compressors in IFFCO, Phulpur.

Jan 2008 : Bearing Inspection Job of Steam Turbine in United


Phosphorous.

Jan 2008 : Steam Turbine (HP) Overhauling in IOCL, Mathura.

Dec 2007 : Overhauling of Mitsui Gas Turbine No. 2 at HPCL MUMBAI

Dec 2007 : Hot Gas Path Inspection of Frame V Gas Turbine # 2 at


ONGC – Uran

Dec 2007 : Hot Gas Path Inspection of Frame VI Gas Turbine # 8 at RIL –
Jamnagar

Dec 2007 : Hot Gas Path Inspection of Frame VI Gas Turbine # 2 at


GIPCL Baroda.

Dec 2007 : Major Overhauling of Frame 9E Gas Turbine & Generator at


Essar Power Hazira.

Aug 2007 : Hot Gas Path Inspection of Frame IX Gas Turbine # 1 Essar
Power Corporation Limited, Hazira, Surat, Gujarat.

33 | P a g e
April 2007 : Hot Gas Path Inspection of Frame V of Gas Turbine No. 1 at
ONGC – URAN

March 2007 : Combustion Inspection of Frame VI of GTG at RIL Jamnagar.

March 2007 : Combustion Inspection of Frame V Gas Turbine No.3 at IOCL


– MATHURA

March 2007 : Major Inspection of Frame VI Gas Turbine No. 1 at GSECL –


UTRAN

March 2007 : Hot Gas Path Inspection Frame VI of Gas Turbine No. 1 at
IOCL – BARODA

Feb 2007 : Gas Turbine Major Overhauling of Gas Turbine No. 11 at


GSEG – HAZIRA.

Feb 2007 :Combustion Inspection of Frame IX of Gas Turbine No. 1 at


Pragati Power (PRAGATI – NEW DELHI).

Dec 2007 : Overhauling of 30 MW Turbine & Generator (Two Units) At


Torrent Power - Ahmedabad

Dec 2007 : Overhauling of Mitsui GTG 7 MW at HPCL Mumbai

Nov 2007 : Overhauling of Steam Turbine (TK – 1421) for Process Air
Compressor (PAC) in Amm - I Plant at IFFCO – Bareilly

Sept 2007 : Overhauling of 15 MW back pressure type Nippon make STG


(including replacement of rotor & diaphragms) at Birla
Cellulosic, Kosamba, Kharach, Surat, Gujarat.

July 2007 : Overhauling of Gear Box of 55 MW Steam Turbine with


Bearing Inspection of Generator and Alignment of Entire
Train for Axial Condenser in BHANDER POWER HAZIRA
(SURAT)

June 2007 : Erection & commissioning of 15 MW STG at API Ispat, Raipur

34 | P a g e
April 2007 : Overhauling of Siemens Make Turbine Mode EHNK –
25/28/19 – 3A in Methanol Plant at Deepak Fertilizer, Taloja.

March 2007 : Overhauling of 55 MW BHEL Make Steam Turbine at GIPCL,


Baroda.

March 2007 : Swapping of GTG Generator Rotor with STG Generator Rotor
at IPCL, Nagothane.

Feb 2007 : Erection & Commissioning of 16 MW STG at Century Mills at


Lalkuan, Uttaranchal.

Feb 2007 : Overhauling of Steam Turbine and Alignment with Gear Box
at Bhander Power Surat.

Feb 2007 : Overhauling of Steam Turbine and Generator at IPCL,


Nagothane

Jan 2007 : Overhauling of Siemens Make Steam Turbine with Charge


Gas Compressor, Propylene Gas Compressor and Ethylene
Gas Compressor in GOP Plant at IPCL Baroda.

Jan 2007 : Overhauling of STG at GIPCL, Vadodara.

Oct 2006 : Generator Works of Frame V Gas Turbine No. 1 at ONGC –


HAZIRA.

Oct 2006 : Revamping of Frame V Gas Turbine No. 2 at ONGC –


HAZIRA.

Oct 2006 : Combustion Inspection of Frame VI Turbine No. 2 at RIL –


PATALGANGA.

Oct 2006 : Revamping of Frame V of Gas Turbine No. 1 at OCGC –


HAZIRA.

Sept 2006 : Combustion Inspection of Frame VI Gas Turbine No. 2 at IOC


– BARODA.

35 | P a g e
Sept 2006 : Hot Gas Path Inspection of Gas Turbine No. 2 at HPCL –
HALDIA.

Sept 2006 : Hot Gas Path Inspection of Gas Turbine No. 2 at ESSAR
POWER HAZIRA.

Aug 2006 :Gas Turbine Major Inspection, Accessory & Load Gear Box
Overhauling GT C & I Miscellaneous Activities at RIL – GOA.

Aug 2006 : Major Inspection of Frame V of Gas Turbine at BPCL –


MUMBAI.

July 2006 : Major Inspection of Frame V of Gas Turbine No. 1 at IOC –


HALDIA.

May 2006 : Hot Gas Path Inspection of Frame VI of Gas Turbine, at IPCL
GANDHAR.

May 2006 : Major Inspection of Frame VI of Gas Turbine No. 3 at IOC –


BARODA.

May 2006 : Turbine Bearing No. 2 Inspection of Frame VI of Gas Turbine


No. 3 at BPCL – MUMBAI.

May 2006 : Combustion Inspection of Gas Turbine No. 1 AT HPL –


HALDIA.

April 2006 : Hot Gas Path Inspection of Frame VI Gas Turbine No. 1 at
IOC – BARODA.

April 2006 : Major Inspection of Frame V, 20 MW Gas Turbine No. 1 at


MUL – GURGAON.

March 2006 : Major Inspection of Gas Turbine, LGB, AGB & Generator of
Frame V of Gas Turbine No. 1 (033) at CFCL – KOTA.

March 2006 : Major Inspection (Mechanical, Electrical & Instrumentation


Job) of Gas Turbine No. 1 of Barauni Refinery, at IOC –
BARAUNI.
36 | P a g e
March 2006 : Hot Gas Path Inspection of Frame VI of Gas Turbine No. 1, 2,
3 & 5 at RIL – JAMNAGAR.

Feb 2006 : Hot Gas Path Inspection Old Frame VI of Gas Turbine No. 1
at GIPCL – BARODA (BHEL MAKE).

Feb 2006 : Hot Gas Path Inspection of Frame VI of Gas Turbine No. at
GIPCL BARODA.

Jan 2006 : Major Inspection of Gas Turbine, LGB, AGB, & Generator of
Frame V OF Gas Turbine No. 1 at PONDICHERRY POWER
(BHEL MAKE).

Nov 2005 : Hot Gas Path Inspection of Frame VI OF Gas Turbine No.2 at
RIL – PATALGANGA (BHEL – MAKE).

Nov 2005 : Major Inspection of Gas Turbine, LGB, AGB & Generator
Frame III Gas Turbine No. 2 IOC – DIGBIO.

Nov 2005 :Combustion Inspection of Frame IX of Gas Turbine No. 1 & 2. At


NTPC – KAYAMKULAM (GE MAKE).

Nov 2005 :Hot Gas Path Inspection of Frame IX DLN Gas Turbine No. 2 at
PPCL – DELHI (GE MAKE).

Oct 2005 : Combustion Inspection of Gas Turbine OF Frame VI gas


turbine no.2, 8, 3, & 5 at RIL – JAMNAGAR (BEHL MAKE).

Sept 2005 : Major Inspection of Gas Turbine No. 1 at HPL – HALDIA (EGT
MAKE).

Aug 2005 : Hot Gas Path Inspection of Frame 6 Gas Turbine at Gujarat State
Electric Company Limited (previously known as Gujarat State
Electricity Board), UTRAN.

Aug 2005 : Combustion Inspection OF Frame 6 Gas Turbine at Indian


Petrochemical Corporation Limited, Dahej, GUJARAT.
37 | P a g e
Aug 2005 : Hot Gas Path Inspection and bearing inspection of Frame VI
Gas Turbine at Reliance Energy Limited, GOA, INDIA.

Aug 2005 : Hot Gas Path Inspection of Frame VI Gas Turbine at L & T
AMERILE (EGT – MAKE).

Aug 2005 : Major Inspection of GT & Generator Inspection of Frame VI


Gas Turbine No. 3 at RIL – JAMNAGAR.

Aug 2005 : Major Inspection of Generator including Electrical Diagnostic


Test of Stator, Rotor & Exciter Type TARI – 800 – 26
(GT- Frame VI).

Aug 2005 : Hot Gas Path Inspection of GT Frame V 702 at IMDO GULF –
JADISHPUR, TURBO – TECHNICA (GENP MAKE).

Aug 2005 : Overhauling of 210 MW of Steam Turbine of LP Turbine


overhauling, HPE Inspection, FS Inspection and Auxiliary
systems overhauling at Nuclear Power Corporation of India
Limited, TARAPUR, and MAHARASHTRA.

July 2005 : Major Overhauling of 50 MW BHEL make Steam Turbine


Generator at Gujarat Industries Power Corporation Limited,
Gujarat.

July 2005 : Hot Gas path Inspection of 145 MW Gas Turbine Generator
OF ABB make and its auxiliaries (GT #3).

July 2005 : Major Inspection of Frame 6 Gas Turbine Generator at


Gujarat Industries Power Corporation Limited, Gujarat.

July 2005 : Major Inspection of Frame V Gas Turbine at Oil and Natural
Gas Company Limited, Hazira, Gujarat.

July 2005 : Hot Gas Path Inspection of Frame IX at Essar Power Limited,
Hazira, Surat, Gujarat.

38 | P a g e
July 2005 :Major Inspection of ALSTHOM makes 106 MW Gas turbine of
Frame 9 E (unit # 2) for National Thermal Power Corporation
Limited, Kawas, and Gujarat.

June 2005 : Hot Gas Path Inspection of Gas No. 3 at NTPC – AURIYA
(BHEL MAKE).

June 2005 : Combustion Inspection of Frame VI Gas Turbine at Reliance


Industries Limited, Jamnagar, Gujarat.

June 2005 : Major Inspection of 145 MW Gas Turbine Generator OF ABB


make and its auxiliaries (GT #2) and extended combustion
inspection OF (GT # 4) at AURIYA, Uttar Pradesh.

June 2005 : Major Inspection OF Frame IX Gas Turbine OF EGT make at


National Thermal Power Corporation Limited, Kawas.

May 2005 : Major Overhauling of Gas Turbine No. 2 & its Auxiliaries And
Major Inspection of Gas Turbine No. 2 at NTPC – AURAIYA
(MHI – MAKE).

May 2005 : Combustion Inspection of Gas Turbine No. 4 at NTPC –


AURAIYA (MHI – MAKE).

May 2005 : Hot Gas Path Inspection of Frame VI OF Gas Turbine No. 2 at
GSEL – UTRAN.

May 2005 : Combustion Inspection of Frame VI at IPCL – GANDHAR


(BHEL – MAKE).

May 2005 : Combustion Inspection of Gas Turbine & Generator Frame VI


OF Gas Turbine No. 3. At GIPCL – BARODA (BHEL – MAKE).

May 2005 : Combustion Inspection of Frame VI OF Gas Turbine No. 1 & 3


at GSEL – UTRAN.

May 2005 : Major Inspection of Gas Turbine, LGB, AGB Generator 7


Auxiliaries OF Frame VI OF Gas Turbine No. 1 at HPL-
HALDIA(EGT- MAKE).
39 | P a g e
May 2005 : Combustion Inspection of Frame VI Gas Turbine at Indian
Petrochemicals Corporation Limited, Dahej.

May 2005 : Major Inspection OF Frame VI Gas Turbine at Gujarat


Industries Power Corporation Limited, Baroda, Gujarat.

April 2005 : Major Inspection of Gas Turbine at RIL - JAMNAGAR

April 2005 : Combustion Inspection of Frame VI GT No. 1, 2, & 3 at IOC –


BARODA (BHEL – MAKE).

March 2005 : Hot Gas Path Inspection of Frame V Gas Turbine OF


Thomassen make at IFFCO, Phulpur.

March 2005 : Major Inspection of Frame V Gas Turbine at Oil & Natural
Gas Corporation Limited, Hazira.

March 2005 : Hot Gas Path Inspection of Frame VI Gas Turbine at


Numaligarh Refinery, Assam.

March 2005 : Hot Gas Path Inspection of Frame VI Gas Turbine No. 2 at
NUMALI GARH REFINERY LTD. (GNP – MAKE)

Feb 2005 : Major Inspection of Frame VI Gas Turbine at Gujarat State


Fertilizer Corporation, Baroda, Gujarat.

Feb 2005 : Hot Gas Path Inspection of Frame VI Gas Turbine at Bharat
Petroleum Corporation Limited, Mumbai.

Feb 2005 : Major Inspection of ABB makes 160 MW Gas Turbine at


National Thermal Power Corporation Limited (NTPC), Jhanor,
Gujarat.

Jan 2005 : Major Inspection of Frame V Gas Turbine Generator at


Indian Petrochemicals Corporation Limited, Gujarat.

Jan 2005 : Major Inspection of Frame V Gas Turbine Generator at


Reliance Industries Limited, Patalganga.
40 | P a g e
Static Equipment’s

Fabrication

Heat Exchangers Pressure Vessels Columns Agitator Scaffolding

Dec 2016 : Contract for laying of Cooling water supply line from CT5 to
HDPE at RIL Dahej.

Dec 2016 : Re-tubing Services of Heat Exchangers at BORL Bina through


CRAsia.

Dec 2016 : Service PR- E1-151 Retubing Job during PTA-1 Annual SD at RIL
Hazira.

Nov 2016 : Contract for various Fabrication jobs for GCU SD at RIL Dahej.

Nov 2016 : Contract for Non IBR Fabrication jobs for GCU SD at RIL Dahej.

Nov 2016 : Mechanical Work For MEG line at RIL Dahej.

Oct 2016 : Pneumatic test of HE & Line flushing at RIL Dahej.

Oct 2016 : Miscellaneous maintenance, fabrication, PHE drop box up & PHE
maintenance jobs.

41 | P a g e
Sept 2016 : PTA Dryer overhauling, CTA Drier Inner Row Tubes Replacement,
PTA Drier Tubes Replacement job at RIL Hazira

Aug 2016 : PTA & CTA drier tube doubling job at RIL Hazira.

June 2016 : PTA Dryer inner row tubes Replacement at RIL Hazira.

June 2016 : Scaffolding erection for bhukhikhadi at RIL Dahej.

June 2016 : Contract for Exchanger replacement jobs during VCM SD at RIL
Dahej.

April 2016 : Laying RO water line from EOEG tank Farm to CPP1culvert at
RIL Dahej

May 2016 : Scaffolding preparation for EOT crane service at RIL Dahej.

May 2016 : Laying RO water line from PTA 36” header to New ETP OSBL at
RIL Dahej

March 2016 : ASP compressor diffuser inspection & cleaning at RIL Dahej.

March 2016 : Occasional Fabrication & Static Maintenance job at RIL Dahej.

Feb 2016 : Supply, Fabrication & Erection of Natural Gas Pipeline at ONGC
Petro Additions Limited- Dahej

Feb 2016 : Motor Removal & Re-installation of HT motors at RIL Dahej

Jan 2016 : Static Job for Pre-commissioning at Reliance Utilities and Power
Pvt. Limited

Jan 2016 : K320, K950 Compressor Overhauling & Overhauling of K115


gearbox at RIL Dahej

Jan 2016 : Hydro-testing of Heat exchanger in CCPP

Dec 2015 : Removal & re-fixing of MBR Membrane cassette for cleaning at
RIL Dahej
42 | P a g e
Nov 2015 : Major Overhauling of C2R, C3R (Elliot Make) Compressor &
Turbine at ONGC Petro Additions Limited- Dahej.

Nov 2015 : Aluminum Oxide 16 Mesh Grid Blasting of C2R, C3R casing &
diaphragm

Oct 2015 : H801-Repair & Maintenance Jobs (YORK compressor 1 &


compressor 2)

Sept 2015 : Extruder Die Plate Replacement, LDPE

Sept 2015 : K401 Res Comp O/H, Residual Gas Compressor Overhauling,
Oxygen Comp O/H During Meg1 SD

Aug 2015 : Major Overhauling of CGC (Elliot Make) Compressor & Turbine at
ONGC Petro Additions Limited- Dahej.

Aug 2015 : BOG Compressor Motor Swap 7A to 7C at Gujarat Chemical Port


Terminal Co. Ltd.

Aug 2015 : Overhauling of ESSAREC and ESSARAX machine at Essar


Jamnagar.

July 2015 : CT-2 Cooling Water Pump Loading, Unloading.

June 2015 : Fuel Gas Line Replacement/Fabrication.

June 2015 : Fabrication & Fixing Of New Bobbin Stand.

June 2015 : Replacement of Gland Seal Of Extruder at RIL NMD

May 2015 : Alignment of compressor motor at Gujarat Chemical Port Terminal


Co. Ltd.

May 2015 : Fire Water Pump Erection & Alignment Job.

May 2015 : Internal cleaning of vessels & media filling in side-stream filter.

43 | P a g e
April 2015 : M473X Dryer Flue Head Bolts Replacement at PMD.

April 2015 : Preservation of Rotary equipments at PTA-6.

April 2015 : Divertor Damper Bearing Replacement

Feb 2015 : K301 Overhauling IMPL CLEANING MEG3 SD at RIL Hazira.

Feb 2015 : OXY COMP O/H DURING MEG3 SD at RIL Hazira.

Jan 2015 : Overhauling of LDPE extruder (30-X -01)at RIL Nagothane.

Jan 2015 : Replacement of Extrusion Hopper (30V15) in LDPE plant at RIL

Nagothane.

Jan 2015 : Major Overhauling work for Dresser-Rand make turbo compressors

(CGC, C2R, C3R) at RIL Nagothane.

Jan 2015 : Overhauling of Gear Box C3071 at RIL Patalganga.

Jan 2015 : Motor Replacement Job at RIL Patalganga.

Dec 2014 : Providing Services for G1401 Agitator at RIL Patalganga.

Dec 2014 : Hydrotest of Heat Exchangers in PTA6 at RIL Dahej.

Dec 2014 : Overhauling of MAAG pump & Gear Box at Ril Dahej.

Oct 2014 : Pump Loading, Shifting, O/H & Alignment At Ril Hazira.

Sept 2014 : Overhauling of Main Air Compressor At Ril Hazira.

Sept 2014 : Pumps Overhauling in CKR at Ril Hazira.

Sept 2014 : Blinding/Deblinding For Isbl Piping At Ril Hazira.

Sept 2014 : Misc Cold Work At Ril Hazira.


44 | P a g e
Sept 2014 : Overhauling of C2R, FGC And Expander At Ril Hazira.

Aug 2014 : Overhauling Of Oxygen Compressor At Ril Hazira.

Aug 2014 : Hydrotest of Heat Exchangers in PTA5 at DMD, Dahej.

July 2014 : Motor Removal & Installation & Alignment in MEG SD At RIL

Dahej.

July 2014 : Oxygen Compressor Overhauling at RIL Hazira.

July 2014 : CCT Pump Loading, Unloading & Alignment at RIL Hazira.

July 2014 : Overhauling Of York Compressor at RIL Dahej.

June 2014 : MAAG Pump & Gear Box Maintenance Job at RIL Dahej.

May 2014 : MISC. Static Maintance JOBS OF PVC Shutdown At Ril Dahej.

May 2014 : Assistance for GFD Gearboxes Overhauling @ RIL, Patalganga

May 2014 : Compressor overhauling jobs @ RIL- Hazira

April 2014 : Misc Static job of PVC Shutdown @ RIL, Dahej

April 2014 : Misc Rotary jobs in PVC plant @ RIL, Dahej

April 2014 : PTA Dryer Air Seal Drum Overhauling @ RIL, Patalganga

April 2014 : CG Compressor LP and MP Seals inspection and replacement jobs

at GCU, RIL-Dahej.

March 2014 : Compressor Overhauling services in ETH plant @ RIL, Hazira

March 2014 : Dryer Overhauling jobs during PTA 3 ASD @ RIL, Hazira

March 2014 : Rotary Equipment Insp OH Job at VCM plnat @ RIL, Hazira
45 | P a g e
March 2014 : Rotary Equipments OH jobs during PTA 3 ASD @ RIL, Hazira

March 2014 : PTA 1 Centrifuge job in FSD @RIL- Hazira

Feb 2014 : PTA-2 Centrifuge Job in FSD @ RIL- Hazira

Feb 2014 : Motor Replacement job @ RIL- Patalganga

Feb 2014 : Multistage job of pumps @ RIL- Patalganga

Jan 2014 : Rotary Pre-Commissioning & Commissioning At RIL Dahej.

Dec 2013 : KOBE compressor overhauling job @ RIL- Dahej

Dec 2013 : Centrifuge Overhauling services in PTA-1 & 2 @ RIL- Hazira

Nov 2013 : Screw Conveyor job in FSD @ RIL- Hazira

Nov 2013 : ASU cold box air exp. Turbine overhauling @ RIL- Hazira

Nov2013 : PM & Maintenance jobs in FSD @ RIL_ Hazira

Nov2013 : Reactor Feed pump overhauling job @ RIL- Hazira

Nov2013 : Overhauling of K202 compressor @ RIL- Dahej

Nov 2013 : Preservation of equipment for PET-3 project @ RIL-Dahej

Nov 2013 : Upgradation of Extruder ZSK 300 to 320 @ RIL- Dahej

Oct 2013 : Compressor overhauling jobs @ RIL- Hazira

Oct 2013 : Rotary valve seal replacement job @ RIL- Patalganga

Sept 2013 :Overhauling of Chlorine Compressor at CA plant, RIL, Dahej

Aug 2013 : Replacement of motor at CPP-I, RIL Dahej

46 | P a g e
June 2013 : Overhauling of Various Equipments during Shutdown of PTA

Plant at Reliance Industries Ltd, Patalganga

June 2013 : Overhauling of C133- Suzler PAC & GHH machine in PTA plant,

Overhauling of C3071 machine in PX plant, MANTURBO,

Patalganga

May 2012 : Overhauling of Cycle Gas Compressor & Gear Box Train

configuration (Mitsui engg. Company and Ship Building Co.)

at Reliance Nagothane.

May 2012 : Overhauling of EO Compressor & Gear box Train

Configuration(IHI Japan Make) at Reliance, Nagothane.

April 2012 : Overhauling jobs of rotary equipments in Deepak Fertilizers

and Petrochemicals Corp. Ltd.

March 2012 : Export Oil Pumps Revamping job at Cairn Energy India Pty

Limited, Barmer

Feb 2012 : Major SHUT DOWN at Reliance Industries Limited, Patalganga for

Overhauling of compressor, pumps, agitator, seal artridge

replacement, maintenance of critical valves, sleeve replacement’s and

all other critical ROTARY equipments.

Feb, 2012 : Overhauling of reciprocating hyper & primary compressor at

RIL Baroda
47 | P a g e
Feb, 2012 : Repair & Overhauling of Centrifugal pumps including

removal & reinstallation at RIL Patalganga

Jan 2012 : Overhauling of Main Air Blower and Flue Gas Expander

(JAMNAX 4) at Reliance Jamnagar

Jan 2012 : Overhauling of Extruder and Agitator at RIL Baroda

Dec 2011 : Overhauling of Reclaim Compressor K-320 at RIL Dahej

Nov 2011 : Overhauling of MAN Turbo make Centrifugal Compressor

(JAMISO) at RIL Jamnagar

Nov 2011 : Overhauling of MAN Turbo make Centrifugal Compressor

(JAMPFUEL) at RIL Jamnagar

Nov 2011 : Overhauling of MAN Turbo make Centrifugal Compressor

(JAMPLAT 2) at RIL Jamnagar

Nov 2011 : Overhauling of MAN Turbo make Centrifugal Compressor

(JAMPLAT 1) at RIL Jamnagar

Oct 2011 : Overhauling of Main Air Blower and Flue Gas Expander

(JAMNAX – 3) at RIL Jamnagar

Oct 2010 : Bearing Inspection 1 & 2 at IOCL Baroda

Dec 2009 : Inspection of bearing No.1 & 2 at IOC-Baroda

April 2009 : Replacement of LGB Gears & Bearing at RIL Baroda.

Jan 2009 : AGB Replacement & machine alignment at AES, Sri Lanka.
48 | P a g e
Jan 2009 : Combustion and Baroscopic Inspection at Torrent Power

Ahmedabad

Jan 2008 : Overhauling of Rotary Machines in IFFCO, Aonla.

June 2005 : Rotor swapping job of Turbo Generator at Indian oil Corporation

Limited, Baroda.

49 | P a g e
SAFETY FIRST

BUT

PRODUCTION MUST

SINCE – 2004

SAFETY AWARENESS
Rotostat Services Private Limited

50 | P a g e
51 | P a g e
52 | P a g e
53 | P a g e
54 | P a g e

S-ar putea să vă placă și