Documente Academic
Documente Profesional
Documente Cultură
Contact Coordinates
Landmark Pllatinum, 603, 6th Floor, S.V. Road, 34th Road, Bandra West, Mumbai 400050
Telephone
+91- 22- 26040647, 26489580
Contact Personnel: Mr. P.S. SHUKLA (V.P- Operation) Mob: +917666536105
Contact Personnel: Mr. Hatim Rampurawala (Company Secretary) Mob: +919768912017
Email
info@rotostat.in, prem.shukla@rotostat.in, hatim.r@rotostat.in
Page | 1
2|Page
FOREWORD
Since the time of inception in 2004, JAYPEE POWER SYSTEMS (JPS), marched forward in
providing quality, well-organized and Competent services for the last seven years in the field of
Erection, Testing, Commissioning OVERHAULING of Gas, Steam Turbines, Generators,
Pumps, Compressors, Pumps, Motors, Fans etc of various capacities and all Rotary
Equipments of Various capacities including all types of Mechanical, Electrical and
Instrumentation works in the POWER, PETROCHEMICALS, FERTILIZERS, REFINERIES
& other related INDUSTRIES in INDIA.
In the year of 2009 we have formed ROTOSTAT SERVICES PRIVATE LIMITED (RSPL)
for us to expand our spectrum of activities in the field of all critical Prime Movers
and Static Equipments taking active participations critical SHUT DOWNS and
Rotostat derives its strength from the wide range of committed people that it carries along with
it in its journey to foray in the construction space. Our mission statement is to be a “Specialized
People’s Company”, Customer depend on and call their OWN”.
The Company is led by Mr. Probal Mukherjee (Ex-CEO, Gammon India) and his team of
engineers who have a proven track record of delivering various construction projects over the
last 30 years.
3|Page
4|Page
EXPERIENCE
5|Page
OUR SPECIALISATION
Erection and Commissioning of all types of ROTARY & Static Equipments like
Gas, Steam Turbine, Diesel Generating Sets, Compressors (all types – Centrifugal
/ Reciprocating/ Screw), Pumps, Heat Exchangers, Pressure Vessels, and
Columns etc.
Highly Skilled Manpower supply to handle critical Prime Movers & Static
Equipments in ERECTION / SHUTDOWNS / PRECOMMISSIONING
ASSISTANCE.
6|Page
7|Page
Resources and Facilities
RSPL has highly skilled and experienced Mill Wright Manpower like
Engineers, Supervisors, Mill Wright Technicians, Sarang, Foreman,
Riggers, Electrician, C&I Engineers & Technicians familiar with all
types of Rotary machines manufactured by reputed organizations of the
world.
All types of tools & plants for the execution of various projects.
8|Page
9|Page
ANNUAL MAINTENANCE CONTRACT
1.1.1 Dahej Manufacturing Division (All plants), From: June 2012 and continuing.
1.1.2 Dahej Manufacturing Division (PTA 5), From: July 2015 and continuing.
1.1.3 Patalganga Manufacturing Division (All plants of Petro), From: August 2012
and continuing.
1.1.4 Patalganga Manufacturing Division (All plants of Fyber), From: August 2014
and continuing.
1.1.5 Hazira Manufacturing Division, From: May 2013 and continuing.
1.1.6 Silvassa Manufacturing Division; From: September 2013 and continuing.
1.1.7 Nagothane Manufacturing Division; From: October 2016 and continuing.
10 | P a g e
1.6. AHU Operation & Monitoring Jobs:
1.11.1. Reliance Infocomm Limited, Reliance Corporate Park, Navi Mumbai, From
January 2016 and continuing
11 | P a g e
2.1.1. Services for Mechanical Maintenance & Equipment Inspection Services
(Pre- Commissioning Health Check-up) in DFCU & AU Unit, From: April 2015 and
continuing.
7.1.1. AMC for Pump & Valve Maintenance at Torrent Power- Ahmadabad.
9.1.1 Carrying out Operation & Maintenance activity for Material Handling System for
CCPP plant at RIL Dahej Complex.
12 | P a g e
TURBINE & GENERATOR
Contract.
Commissioning.
Electrical
13 | P a g e
Rotostat Services Private Limited
Sole Service Provider for Annual Maintenance Contract of Plants CA, GCU/CKR,
CPP, EOEG, ETP, EVA, IOP, OSP, HDPE, PVC, VCM, PET3, PTA5, CPP3.
1) Rotary Equipment And Static Equipments.
2) Fabrication of Piping And structural.
3) Scaffolding.
4) Auto Warehouse.
Sole Service Provider for Annual Maintenance Contract of Plants PE1, PE2, PP1,
PBR3, SBR, ETH, PVC, PT1, PT2, PT3, EF2, TF1, ME1, ME2, ME3, VCM, CPP, BD1, ARO,
BT1, CRA.
1) Rotary Equipments.
Sole Service Provider for Annual Maintenance Contract for entire Fibre Complex
1) Rotary Equipments.
2) Static Equipments.
3) Fabrication of Piping And Structural.
4) Winders & Associated Spinning Equipments.
5) Automatic Product Handling System.
6) Air Handling Unit Operation & Monitoring.
Mar 2017 : Contract for providing Specialized Support Services for Rotating
Equipment’s for Turnaround 2016 for Oman Oil Refineries and
Petroleum Industries Company (ORPIC)
Dec 2016 : Overhauling of Jamnax 1-2 trains at RIL Jamnagar through Man
Diesel & Turbo India Ltd.
Dec 2016 : GA953 & GA929, cooling tower fan Overhauling for LAB plant at
RIL Patalganga.
Dec 2016 : Rotary Jobs During Shutdown for HDPE at RIL Dahej.
Dec 2016 : Misc. Rotary Jobs during PTA-1 Annual SD at RIL Hazira.
Nov 2016 : Expander Compressor O/H During S/D At GCU At RIL Dahej.
15 | P a g e
Nov 2016 : Overhauling Of Compressor K 301 of IOP plant at RIL Dahej.
Nov 2016 : CG Turbine & Compressor Overhauling (K45 & KT 45) of GCU at
RIL Dahej.
Nov 2016 : Replacement of dry seals Compressors (K101 & K301) of EPRU at
RIL Dahej.
Sept 2016 : Centrifuge Rotor Replacement for PVC plant at RIL Dahej.
Sept 2016 : Rotary Equipment and Fin-fan PM Jobs & Vacuum Pump
Overhauling PTA1 SD At RIL Hazira.
Aug 2016 : Rotary job during PBR AUG16 Shutdown at RIL Hazira.
June 2016 : Inspection & Overhauling of Lean Gas Compressor at GPU, GAIL
India Ltd at Gandhar Complex.
June 2016 : MTR O/H Job during PTA2 Plant at RIL Hazira.
April 2016 : Contract for providing Specialized Support Services for Rotating
Equipment’s for Turnaround 2016 for Oman Oil Refineries and
Petroleum Industries Company (ORPIC)
April 2014 : Major inspection and overhauling of MHI turbine - 1-KT-1 and 1-
KT-2 at Port-hartcourt, Nigeria
Aug 2013 : Overhauling of Steam Turbine 18MW & Gear Box at Dalmia Cement
Plant, Trichy Tamil Nadu
May 2013 : Supervisory and execution services for Standard HGPI HCPP-1 at
ESSAR Steel, HAZIRA
May 2013 :Alignment Work of Fr. IX GT -3, At Essar Power Limited, Hazira.
19 | P a g e
Feb 2013 : Major Inspection of Gas Turbine # 2 along with up – rate at
ONGC – Uran – reg
Feb 2013 : Overhauling of Franco Tosi Steam Turbine 205MW at RLPC, Qatar.
July 2012 : Hot Gas Path Inspection of Frame 3 Gas Turbine at IOCL, Digboi
June 2012 : Hot Gas Inspection of Frame 3 GT#2 along with replacement
of Stg#2 Bucket at IOC-Digboi
June 2012 : Hot Gas Path Inspection of Fr. IX Gas Turbine (GT 2) at Essar
Power Limited, Hazira.
June 2012 : Major Inspection of Fr. VI Gas Turbine with Generator at IOCL,
Haldia.
June 2012 : Hot Gas Path Inspection of Fr. Ix (GT 2) At Essar Power Limited,
Hazira.
May 2012 : Hot Gas Path Inspection Fr#6 at GT#3 at M/s. IPGCL,
New Delhi.
April 2012 : Service for Gas Turbine – 1 Alignment work at Essar Power
Limited, Hazira
April 2012 : Services for Fr. Ix GT -1, Alignment Work At Essar Power Ltd,
Hazira
April 2012 : Overhauling of Franco Tosi Steam Turbine 205MW at RLPC Qatar.
Feb 2012 : Bearing No.2 & 3 Inspection of Fr. IX Gas Turbine At Essar
Power Limited, Hazira
Feb 2012 : Bearing no.2 & 3 Inspection of Frame IX Gas Turbine at ESSAR
POWER LIMITED (Hazira).
Jan 2012 : Gas Turbine Uprate (Major Inspection) of Fr#6 at RIL Dahej
21 | P a g e
March 2011 : Extended HGPI along with bearing No 2,3,4,5 Inspection,
Generator Rotor replacement and Load coupling
replacement of GTG 1 at Essar Power Limited Hazira, Surat,
Gujarat.
Dec 2011 : Services for Gt-3 HGPI Fr. Ix At Bhander Power Limited,
Hazira
Dec 2011 : Services for GT-3 HGPI (Frame 9) at Bhander Power Limited
Hazira
22 | P a g e
Jan 2011 : Major Overhauling of Frame 6 Gas Turbine at Port Harcourt,
Nigeria
Oct 2010 :Major Inspection & Generator Inspection of Frame 5 Gas Turbine
4 at IOCL Digboi
Oct 2010 : Major Inspection & Generator Inspection of Frame 6 Gas Turbine
at RIL Patalganga
Oct 2010 : Extended Hot Gas Path Inspection of Frame 6 Gas Turbine
(Unit 1 & 3) at GACL Dahej
23 | P a g e
Sept 2010 : Bearing Inspection of Frame 6 Gas Turbine at IOCL Mathura
Sept 2010 : Hot Gas Path Inspection of Frame 6 Gas Turbine at RRVUNL
Ramgarh
Aug 2010 : Hot Gas Path Inspection of Frame 6 Gas Turbine at RIL
Jamnagar
Aug 2010 : Hot Gas path Inspection load Gear Box of Frame 6 FA Gas
Turbine at Dubaran
July 2010 : Hot Gas Path Inspection of Frame 6 Gas Turbine at Dholpur
July 2010 : Hot Gas Path Inspection of Frame 9 Gas Turbine at Essar
Power Limited Hazira
Mar 2010 : Major Inspection of Frame -VI Gas Turbine at RIL – Hazira
Jan 2010 : HGPI of Frame – IX Gas Turbine at Essar Power Ltd, Hazira
25 | P a g e
Dec 2009 : Combustion & Baroscopic Inspection of GT-2 Frame-V at
Haldia Refinery
Nov 2009 : LGB replacement, alignment, coupling, and bearing inspection Jobs
on GT # 2 at IOCL- Haldia
Oct 2009 : STG Inspection with train alignment at BPOL, Hazira, Surat.
Aug 2009 : Hot Gas Path Inspection of Frame IX GTG at Bhander Power
Limited, Hazira.
July 2009 : Major Inspection of Mitsui makes GTG at HPCL, Mumbai Refinery.
26 | P a g e
July 2009 : Major Inspection of GT # 2 at PPCL New Delhi
June 2009 : Extended Hot Gas Path Inspection at Maruti Udyog Ltd
Gurgaon
27 | P a g e
March 2009 : Hot Gas Path Inspection of BHEL Supplied Frame 6581 Gas
Turbine Unit no. 9 at RIL Hazira.
Feb 2009 : Hot Gas Path Inspection of THOMESSEN supplied Frame 6541
Gas Turbine Unit no. 2 at RIL Hazira.
Feb 2009 : Hot Gas Path Inspection of GT# 2 at Maruti Suzuki Limited,
Gurgaon, Haryana.
January 2009 : Hot Gas Path Inspection of BHEL Supplied Frame 6581 Gas
Turbine Unit no. 8 at RIL Hazira.
January 2009 : Train alignment of Frame IX Gas Turbine (unit no. 1&2) at
Essar Power, Surat
Dec 2008 : Hot Gas Path Inspection FR-6 Gas Turbine at RIL Hazira.
Nov 2008 : Load Gear Box Inspection and Additional Jobs for Load
Coupling on Fr-6 GT # at 1 at RIL – Baroda.
Oct 2008 : Hot Gas Inspection and Replacement of 3rd Stage. Bucket of
Fr-6 GT # 2 & 5 at RIL Jamnagar
Oct 2008 : HGPI & Bearing Inspection & 3rd stage bucket replacement
of Frame 6 GT# 2 & 5 at RIL Jamnagar.
Oct 2008 : Major Inspection & Gear Box Inspection of Frame 6 GT#1 at
NRL, Numaligarh, Assam.
Oct 2008 : Erection Testing & Commissioning of Fr-6 Gas Turbine – for
Generator Sets & their Aux. BOP, with Related Piping etc
2 X 30 MW, EPCC Package – 7 (GTG & HRSG), at IOCL –
Gujarat Refinery , Jawahar Nagar Baroda
Oct 2008 : Hot Gas Path Inspection of GT# 2 at Evonik Industries, Haldia.
Sept 2008 : Hot Gas Path Inspection and Replacement of # 3rd Stage,
Bucket of Fr-6 GT # 3 at RIL – Jamnagar
Sept 2008 : Hot Gas Path Inspection and Bearing Inspection GE Frame 6
GT maintenance
Sept 2008 : HGPI & Bearing Inspection & 3rd stage bucket replacement
of GE Frame 6.
Sept 2008 : HGPI & 3rd stage bucket replacement of Frame 6 GT# 3 at
RIL Jamnagar.
29 | P a g e
Aug 2008 : Inspection of LGB along with vibration analysis on Frame 6 of
GT # 2 at RIL, Vadodara.
Aug 2008 : Additional Jobs on Load Gear Box Inspection along with
vibration analysis on Fr-6, GT # 2 at RIL – Baroda
July 2008 : Man power services of various categories for Gas Turbine #
11 Damage Rectification work at GSEG – Hazira
June 2008 : Hot Gas Path Inspection, Inspection of BRG 1 & 2, Alignments
and AGB Inspection of Frame VI GT # 1 at RRVUNL –
Ramgarh
30 | P a g e
June 2008 : Erection & Commissioning of 15 MW STG API Ispat Raipur
Feb 2008 : Hot Gas Path Inspection & Replacement of 3rd Stage Bucket
of Frame 6 GT # 4 in RIL, Jamnagar.
Feb 2008 : Hot Gas Path Inspection & Replacement of 3rd Stage Bucket
of Frame 6 GT # 1 in RIL Jamnagar.
Jan 2008 : Hot Gas Path Inspection for Frame VI Gas Turbine # 9 at RIL –
Jamnagar
Jan 2008 : Hot Gas Path Inspection And Replacement of 3rd Stage
Bucket And Shroud For Frame VI Gas Turbine # 1 at RIL
Jamnagar
Jan 2008 : Hot Gas Path Inspection And Replacement of 3rd Stage
Bucket And Shroud For Frame VI Gas Turbine # 4 at RIL
Jamnagar
Jan 2008 : Bearing & Mechanical Seal Replacement Job (STG) in RIL
Vadodara.
Jan 2008 : Bottom Shaft & Bearing Replacement Job (STG) in RIL
Vadodara.
Jan 2008 : Steam Turbine (Scoda) Alignment Job in Essar Steel Hazira,
Surat.
Dec 2007 : Hot Gas Path Inspection of Frame VI Gas Turbine # 8 at RIL –
Jamnagar
Aug 2007 : Hot Gas Path Inspection of Frame IX Gas Turbine # 1 Essar
Power Corporation Limited, Hazira, Surat, Gujarat.
33 | P a g e
April 2007 : Hot Gas Path Inspection of Frame V of Gas Turbine No. 1 at
ONGC – URAN
March 2007 : Hot Gas Path Inspection Frame VI of Gas Turbine No. 1 at
IOCL – BARODA
Nov 2007 : Overhauling of Steam Turbine (TK – 1421) for Process Air
Compressor (PAC) in Amm - I Plant at IFFCO – Bareilly
34 | P a g e
April 2007 : Overhauling of Siemens Make Turbine Mode EHNK –
25/28/19 – 3A in Methanol Plant at Deepak Fertilizer, Taloja.
March 2007 : Swapping of GTG Generator Rotor with STG Generator Rotor
at IPCL, Nagothane.
Feb 2007 : Overhauling of Steam Turbine and Alignment with Gear Box
at Bhander Power Surat.
35 | P a g e
Sept 2006 : Hot Gas Path Inspection of Gas Turbine No. 2 at HPCL –
HALDIA.
Sept 2006 : Hot Gas Path Inspection of Gas Turbine No. 2 at ESSAR
POWER HAZIRA.
Aug 2006 :Gas Turbine Major Inspection, Accessory & Load Gear Box
Overhauling GT C & I Miscellaneous Activities at RIL – GOA.
May 2006 : Hot Gas Path Inspection of Frame VI of Gas Turbine, at IPCL
GANDHAR.
April 2006 : Hot Gas Path Inspection of Frame VI Gas Turbine No. 1 at
IOC – BARODA.
March 2006 : Major Inspection of Gas Turbine, LGB, AGB & Generator of
Frame V of Gas Turbine No. 1 (033) at CFCL – KOTA.
Feb 2006 : Hot Gas Path Inspection Old Frame VI of Gas Turbine No. 1
at GIPCL – BARODA (BHEL MAKE).
Feb 2006 : Hot Gas Path Inspection of Frame VI of Gas Turbine No. at
GIPCL BARODA.
Jan 2006 : Major Inspection of Gas Turbine, LGB, AGB, & Generator of
Frame V OF Gas Turbine No. 1 at PONDICHERRY POWER
(BHEL MAKE).
Nov 2005 : Hot Gas Path Inspection of Frame VI OF Gas Turbine No.2 at
RIL – PATALGANGA (BHEL – MAKE).
Nov 2005 : Major Inspection of Gas Turbine, LGB, AGB & Generator
Frame III Gas Turbine No. 2 IOC – DIGBIO.
Nov 2005 :Hot Gas Path Inspection of Frame IX DLN Gas Turbine No. 2 at
PPCL – DELHI (GE MAKE).
Sept 2005 : Major Inspection of Gas Turbine No. 1 at HPL – HALDIA (EGT
MAKE).
Aug 2005 : Hot Gas Path Inspection of Frame 6 Gas Turbine at Gujarat State
Electric Company Limited (previously known as Gujarat State
Electricity Board), UTRAN.
Aug 2005 : Hot Gas Path Inspection of Frame VI Gas Turbine at L & T
AMERILE (EGT – MAKE).
Aug 2005 : Hot Gas Path Inspection of GT Frame V 702 at IMDO GULF –
JADISHPUR, TURBO – TECHNICA (GENP MAKE).
July 2005 : Hot Gas path Inspection of 145 MW Gas Turbine Generator
OF ABB make and its auxiliaries (GT #3).
July 2005 : Major Inspection of Frame V Gas Turbine at Oil and Natural
Gas Company Limited, Hazira, Gujarat.
July 2005 : Hot Gas Path Inspection of Frame IX at Essar Power Limited,
Hazira, Surat, Gujarat.
38 | P a g e
July 2005 :Major Inspection of ALSTHOM makes 106 MW Gas turbine of
Frame 9 E (unit # 2) for National Thermal Power Corporation
Limited, Kawas, and Gujarat.
June 2005 : Hot Gas Path Inspection of Gas No. 3 at NTPC – AURIYA
(BHEL MAKE).
May 2005 : Major Overhauling of Gas Turbine No. 2 & its Auxiliaries And
Major Inspection of Gas Turbine No. 2 at NTPC – AURAIYA
(MHI – MAKE).
May 2005 : Hot Gas Path Inspection of Frame VI OF Gas Turbine No. 2 at
GSEL – UTRAN.
March 2005 : Major Inspection of Frame V Gas Turbine at Oil & Natural
Gas Corporation Limited, Hazira.
March 2005 : Hot Gas Path Inspection of Frame VI Gas Turbine No. 2 at
NUMALI GARH REFINERY LTD. (GNP – MAKE)
Feb 2005 : Hot Gas Path Inspection of Frame VI Gas Turbine at Bharat
Petroleum Corporation Limited, Mumbai.
Fabrication
Dec 2016 : Contract for laying of Cooling water supply line from CT5 to
HDPE at RIL Dahej.
Dec 2016 : Service PR- E1-151 Retubing Job during PTA-1 Annual SD at RIL
Hazira.
Nov 2016 : Contract for various Fabrication jobs for GCU SD at RIL Dahej.
Nov 2016 : Contract for Non IBR Fabrication jobs for GCU SD at RIL Dahej.
Oct 2016 : Miscellaneous maintenance, fabrication, PHE drop box up & PHE
maintenance jobs.
41 | P a g e
Sept 2016 : PTA Dryer overhauling, CTA Drier Inner Row Tubes Replacement,
PTA Drier Tubes Replacement job at RIL Hazira
Aug 2016 : PTA & CTA drier tube doubling job at RIL Hazira.
June 2016 : PTA Dryer inner row tubes Replacement at RIL Hazira.
June 2016 : Contract for Exchanger replacement jobs during VCM SD at RIL
Dahej.
April 2016 : Laying RO water line from EOEG tank Farm to CPP1culvert at
RIL Dahej
May 2016 : Scaffolding preparation for EOT crane service at RIL Dahej.
May 2016 : Laying RO water line from PTA 36” header to New ETP OSBL at
RIL Dahej
March 2016 : ASP compressor diffuser inspection & cleaning at RIL Dahej.
March 2016 : Occasional Fabrication & Static Maintenance job at RIL Dahej.
Feb 2016 : Supply, Fabrication & Erection of Natural Gas Pipeline at ONGC
Petro Additions Limited- Dahej
Jan 2016 : Static Job for Pre-commissioning at Reliance Utilities and Power
Pvt. Limited
Dec 2015 : Removal & re-fixing of MBR Membrane cassette for cleaning at
RIL Dahej
42 | P a g e
Nov 2015 : Major Overhauling of C2R, C3R (Elliot Make) Compressor &
Turbine at ONGC Petro Additions Limited- Dahej.
Nov 2015 : Aluminum Oxide 16 Mesh Grid Blasting of C2R, C3R casing &
diaphragm
Sept 2015 : K401 Res Comp O/H, Residual Gas Compressor Overhauling,
Oxygen Comp O/H During Meg1 SD
Aug 2015 : Major Overhauling of CGC (Elliot Make) Compressor & Turbine at
ONGC Petro Additions Limited- Dahej.
May 2015 : Internal cleaning of vessels & media filling in side-stream filter.
43 | P a g e
April 2015 : M473X Dryer Flue Head Bolts Replacement at PMD.
Nagothane.
Jan 2015 : Major Overhauling work for Dresser-Rand make turbo compressors
Dec 2014 : Overhauling of MAAG pump & Gear Box at Ril Dahej.
Oct 2014 : Pump Loading, Shifting, O/H & Alignment At Ril Hazira.
July 2014 : Motor Removal & Installation & Alignment in MEG SD At RIL
Dahej.
July 2014 : CCT Pump Loading, Unloading & Alignment at RIL Hazira.
June 2014 : MAAG Pump & Gear Box Maintenance Job at RIL Dahej.
May 2014 : MISC. Static Maintance JOBS OF PVC Shutdown At Ril Dahej.
April 2014 : PTA Dryer Air Seal Drum Overhauling @ RIL, Patalganga
at GCU, RIL-Dahej.
March 2014 : Dryer Overhauling jobs during PTA 3 ASD @ RIL, Hazira
March 2014 : Rotary Equipment Insp OH Job at VCM plnat @ RIL, Hazira
45 | P a g e
March 2014 : Rotary Equipments OH jobs during PTA 3 ASD @ RIL, Hazira
Nov 2013 : ASU cold box air exp. Turbine overhauling @ RIL- Hazira
46 | P a g e
June 2013 : Overhauling of Various Equipments during Shutdown of PTA
June 2013 : Overhauling of C133- Suzler PAC & GHH machine in PTA plant,
Patalganga
May 2012 : Overhauling of Cycle Gas Compressor & Gear Box Train
at Reliance Nagothane.
March 2012 : Export Oil Pumps Revamping job at Cairn Energy India Pty
Limited, Barmer
Feb 2012 : Major SHUT DOWN at Reliance Industries Limited, Patalganga for
RIL Baroda
47 | P a g e
Feb, 2012 : Repair & Overhauling of Centrifugal pumps including
Jan 2012 : Overhauling of Main Air Blower and Flue Gas Expander
Oct 2011 : Overhauling of Main Air Blower and Flue Gas Expander
Jan 2009 : AGB Replacement & machine alignment at AES, Sri Lanka.
48 | P a g e
Jan 2009 : Combustion and Baroscopic Inspection at Torrent Power
Ahmedabad
June 2005 : Rotor swapping job of Turbo Generator at Indian oil Corporation
Limited, Baroda.
49 | P a g e
SAFETY FIRST
BUT
PRODUCTION MUST
SINCE – 2004
SAFETY AWARENESS
Rotostat Services Private Limited
50 | P a g e
51 | P a g e
52 | P a g e
53 | P a g e
54 | P a g e