Sunteți pe pagina 1din 7

RFI #1372.

Plant Construction Company, LP Project: 2017021 - City Center Bishop Ranch


300 Newhall Street 6000 Bollinger Canyon Road
San Francisco, California 94124 San Ramon, California 94583
Phone: (415) 285-0500

P3 Piazza Waterproofing at Slab Edge


TO: Dean Randle (BAR Architects) (Response FROM: Daniel Begaye (Plant Construction Company,
Required) L.P.)
Mark Kelly (BAR Architects)
Daniel Begaye (Plant Construction Company, L.P.) 300 Newhall Street
Kevin Blocksidge (BAR Architects) San Francisco , California 94124
Erik Moriel (BAR Architects)

DATE INITIATED: 10/23/2018 STATUS: Open

LOCATION: DUE DATE: 10/26/2018


PROJECT STAGE: COST CODE:
SUB JOB: SCHEDULE IMPACT: TBD

COST IMPACT: TBD SPEC SECTION: 07 14 13 - Hot Fluid-Applied Rubberized Asphalt


Waterproofing

DRAWING NUMBER: 3/A823.2; BE800/2 REFERENCE:

LINKED DRAWINGS:

RECEIVED FROM: Joe Lawson (The Lawson Roofing Company, Inc)

COPIES TO:
Phil Agar (Plant Construction Company, L.P.), Daniel Begaye (Plant Construction Company, L.P.), Danny Chen (Plant Construction Company,
L.P.), Mariella Cuaderno (Plant Construction Company, L.P.), Juan Cuellar (Plant Construction Company, L.P.), Mike Danska (Plant Construction
Company, L.P.), Adam Dillavou (Plant Construction Company, L.P.), Martin Donohue (Plant Construction Company, L.P.), Mick Doyle (Plant
Construction Company, L.P.), Mike Goszulak (Plant Construction Company, L.P.), Josh Hecock (Plant Construction Company, L.P.), Henry
Herrera (Plant Construction Company, L.P.), Susan Lam (Plant Construction Company, L.P.), Peter Lucchese (Plant Construction Company,
L.P.), James Martino (Plant Construction Company, L.P.), Marveliz Santos (Plant Construction Company, L.P.), Kelly Stockton (Plant Construction
Company, L.P.), Nicole Van Malder (Plant Construction Company, L.P.), Lisa Wright (Plant Construction Company, L.P.)

Question from Daniel Begaye (Plant Construction Company, L.P.) at 06:02 PM on 10/23/2018
Per RFI 1372 and 1372.1, the RFI's did not address the current conditions of the P3 Piazza slab edge.; please confirm the joint filler and zip strip in-
between the steel angle and topping slab concrete is acceptable.

Per RFI 1372.1, the waterproofing should extend into the joint filler space to allow proper overlapping of the different waterproofing, please advise.
Lastly, please find sketches by the waterproofing sub-contractor that shows a propose solution to waterproof the slab edge and framed substrate;
please advise if the waterproofing solution is acceptable.
Attachments:
RFI 1372.2 - P3 Slab Edge Proposed Solution.pdf

Awaiting an Official Response

All Replies:

MH Ewang review RFI 1372.2. - Refer to page 4 of PDF and attached email for your reference.

BAR Architects: No additional comments.

Dean Randle, AIA, BAR Architects 10/30/18


BY DATE COPIES TO

Plant Construction Company, LP Page 1 of 1 Printed On: 10/23/2018 06:02 PM


City Center Bishop Ranch
1
JFL

NTS

Detail 1
Existing Condition

Concrete Topping Slab by Others

Varies, 1/2" to 1"

Fiberboard by Others
Corrugated Metal
PMMA Flashing Resin by Others Wall Panel by Others

Drainage Composite
by Others
Angle by
Hot Rubberized others
Asphalt Waterproofing
by Others Concrete Slab
by others
Silicone Sealant

Framed Wall by Others Bracket by Others

Sheathing by Others

PermaBarrier VPS

Insulation
by Others
City Center Bishop Ranch
2
JFL

NTS

Detail 2
Proposed Solution

Bituthene Mastic

Permabarrier VPS

Sealant at Top and Sides

Sealant Bead Over Insulation


Fastener
City Center Bishop Ranch
2
JFL

NTS
Note: flashing will slope
Sheet Metal Cap by Others
Detail 2
Proposed Solution
Finish Condition Grace Ultra

Per email on
10/27/18, VPS
adhesion to PMMA
needs to be
confirmed.
Recommend
turning VPS onto
PMMA minimum 3" Framing by Others

- MH.

Stud will be sloped


per contract drawing

Per meeting on Refer to email Per discussion


site, Lawson correspondence on on site,
confirmed this 10/27/18 for recommend
sealant joint has comments to detail. turning Grace
been installed for VPS should fold Ultra down
air/weather barrier back up to form drip outer edge of
continuity -MH. edge. - MH stud frame. -MH
Emile Wang

From: Emile Wang


Sent: Saturday, October 27, 2018 1:04 PM
To: W Dean Randle
Cc: Danielb; Mark Kelly
Subject: Re: Fwd: CCBR - P3 Waterproofing at Piazza Slab Edge
Attachments: pds-cpd-SikaflexSelfLevelingSealant-us(1).pdf

Dean/Daniel,

The summary outlined below is in accordance with what was discussed on Thursday. I want to reiterate that this
detail for slab edge works assuming the facade VPS was sealed to the concrete slab, which Joe from Lawson
confirmed in the field. I also want to ensure that the VPS acheives greater than the 1" lap onto the pmma
(ideally 3"). As outlined below, an adhesion test needs to be performed for the VPS onto the PMMA.

Attached is product data for self leveling sealant. Joint depth is 1/4 to 1/2" max.

Thanks
Emile

On Oct 27, 2018 1:58 PM, W Dean Randle <drandle@bararch.com> wrote:


Emile,

Plant and their subcontractors are working this weekend. As soon as possible can you reply and confirm the
agreed upon decisions listed below and follow up with formal responses to the two RFIs

Thanks, Dean

Begin forwarded message:

From: Daniel Begaye <danielb@plantco.com>


Date: Oct 25, 2018 at 3:44 PM
To: W Dean Randle <drandle@bararch.com>, Emile Wang <ewang@morrisonhershfield.com>, Mike Danska
<miked@plantco.com>, Bata Zlatkovic <bzlatkovic@vanmulder.com>, Joe Lawson
<j_lawson@lawsonroofing.com>, Darrell Petray <darrellp@plantco.com>, Jeff VanDeWyngaerde
<jeffv@plantco.com>, Phil Agar <phila@plantco.com>, James Martino <jamesm@plantco.com>, Eric
Bastedo <ebastedo@vanmulder.com>, Mark Kelly <mkelly@bararch.com>
Subject: RE: CCBR - P3 Waterproofing at Piazza Slab Edge

All,

Meeting:
P3 Slab Edge Waterproofing and Flashing
Date:
10/25/2018

1
Attendees:
Dean Randle (BAR Architects)
Emile Wang (Morrison Hershfield)
Mike Danska (Plant Construction)
Darrell Petray (Plant Construction)
Daniel Begaye (Plant Construction)
Phil Agar (Plant Construction)
James Martino (Plant Construction)
Joe Lawson (Lawson Roofing)
Bata Zlatkovic (Van Mulder Sheet Metal)
Eric Bastedo (Van Mulder Sheet Metal)

Summary:

The group agreed on the following items at the P3 Piazza slab edge (Sector 4, 5, 6, 7, & 8).

Part 1: P3 Slab Edge – Waterproofing

1.
o Lawson’s proposed a solution, per RFI 1372.2, it showed the Permabarrier (Grace VPS) starting at the steel angle
along the slab edge and terminating at the insulation.
2. The group agreed the Permabarrier (Grace VPS) would not terminate at the insulation but overhang the slab edge and
Lawson would form a creased fold for a drip edge, see photo below.

Part 2: P3 Framing and Waterproofing

3.
4. Lawson proposed a solution, per RFI 1372.2, at the steel angle Lawson would install Permabarrier VPS and seal with a
bituthene mastic strip. The bituthebe mastic helps adhere the VPS to PMMA.

a.
b. Lawson needs to perform an adhesion test.

4.
o Additional waterproofing membrane (Grace Ultra) will be installed on the vertical sheathing and horizontal stud to
complete per detail BE800/2 and 3/A823.2.
5. Morrison Hershfield requested a compatible sealant with Grace Ultra be installed around the tube steel to help bridge gap
between Grace Ultra and tube steel.

Part 3: P3 Flashing at Piazza Perimeter

6.
7. Van Mulder fabricated a flashing sheet metal and soldered a pitch pocket around the electrical conduit, side note this was
option 1 from RFI 1477.1.

b.
c. Option 2 of RFI 1477.1 was not accepted.

7.
8. Morrison Hershfield needs to provide a waterproofing sealant product (e.g. Sika) to infill pitch pocket around conduit. Also,
Morrison Hershfield needs to determine the sealant depth required.

2
Part 4: Waterproofing the steel tube bracket connection

8.
9. Lawson sealed the embed plate and steel tube bracket connection with Grace S-100 (per approved submittal 072713-01-
R1); and Morrison Hershfield found it acceptable.

BAR will formalize the information above in the two pending RFI’s 1372.2 and 1477.1. Plant Construction is proceeding with
information and Plant understands this issue was resolved today.

Please let me know if you have any questions.

Part 1. Photo
The link ed
image can not
be d isplay ed.
The file may
hav e been
mov ed,
ren amed, or
deleted.
Verify that
the link
points to the
correct file
and location.

Part 3: photo
The link ed
image can not
be d isplay ed.
The file may
hav e been
mov ed,
ren amed, or
deleted.
Verify that
the link
points to the
correct file
and location.

Thank you,

Daniel Begaye
Project Manager

p 415.285.0500 d 925.266.5453 m 505.231.7689


daniel@plantco.com plantconstruction.com

-----Original Appointment-----
From: Begaye, Daniel
Sent: Wednesday, October 24, 2018 1:36 PM
To: Begaye, Daniel; Dean Randle; Emile Wang; Danska, Mike; Bata Zlatkovic; Joe Lawson; Petray, Darrell;
VanDeWyngaerde, Jeff; Agar, Phil; Martino, James; Eric Bastedo; Mark Kelly
Subject: CCBR - P3 Waterproofing at Piazza Slab Edge
When: Thursday, October 25, 2018 10:00 AM-11:00 AM (UTC-08:00) Pacific Time (US & Canada).
Where: Meet at Plant PM Trailer

All,

Following-up from our on-site meeting Monday, please confirm if you will attend on-site meeting Thursday at 10AM.

Emile (Morrision Hershfield) will be on-site to review P3 Piazza slab condition.

Please meet at the Plant PM Trailer.

Thank you,

DANIEL BEGAYE
Project Manager

Agent of
Plant Construction Company, L.P.
Error! Hyperlink reference not valid.
p 415.285.0500 m 505.231.7689
danielb@plantco.com plantconstruction.com

Field Office: City Center Error! Hyperlink reference not valid. | Error! Hyperlink reference not valid.

S-ar putea să vă placă și