Documente Academic
Documente Profesional
Documente Cultură
StStructural,
Plumbing disciplines:
Site and Landscape,
Architectural,
Structural,
and Landscape,
Architectural,
Structural
and Landscape,
Architectural,
Structural and Landscape,
Architectural,
Structural and Landscape,
Architectural,
Structur and Landscape,
Architectural,
Structural and Landscape,
Architectural,
Structural and Landscape,
Architectural,
Structural al and Landscape,
Architectural,
Structuralv
disciplines:
Site and Landscape,
1
June 2006
Architectural,
Structural,
ciplines:
Site and Landscape,
ArchitStStructural,
Plumbing disciplines:
Site and Landscape,
Architectural,
Structural,
ructural,
Plumbing disciplines:
Site and Landscape,
Architectural,
Structural,
ecStructural,
Plumbing disciplines:
Site and Landscape,
Architectural,
Structural,
tural,
Structural,
dStructural,
Plumbing disciplines:
Site and Landscape,
2
June 2006
Architectural,
Structural,
Structural,
PlumbiStructural,
Plumbing disciplines:
Site and Landscape,
Architectural,
Structural,
ng disciplines:
Site and Landscape,
Architectural,
Structural,
Landscape,
Architectural,
Structural,
nd Landscape,
Architectural,
Structural,
ural,
3
June 2006
Plumbing disciplines:
Site and Landscape,
Architectural,
Structural,
ands Structural,
Plumbing disciplines:
Site and Landscape,
Architectural,
Structural,
cape,
ArchitectuStructural,
Plumbing disciplines:
Site and Landscape,
Architectural,
Structural,
ral,
Structural,
Plumbing disciplines:
Site and Landscape,
Architectural,
4
June 2006
Structural,
, Fire Protection, and
Sanitary,
Heating, Ventilating, and
Air Conditioning (HVAC),
Steam Generation,
Steam Distribution,
Incineration/Solid Waste, and
Electrical.
5
June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO.________________
LOCATION___________________________________DATE________________
REVIEWED BY_____________________________________________________
ORGANIZATION___________________________________________________
DESIGN ALERTS (These alerts are issued on a regular basis for design and construction related
issues)
A/E QUALITY ALERTS (These alerts are issued to guard against common and repeat design errors)
TECHNICAL SUMMARIES (The summaries of HVAC design requirements for special and critical areas)
6
June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO.________________
LOCATION___________________________________DATE________________
REVIEWED BY_____________________________________________________
ORGANIZATION___________________________________________________
7
June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO.________________
LOCATION___________________________________DATE________________
REVIEWED BY_____________________________________________________
ORGANIZATION___________________________________________________
8
June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO.________________
LOCATION___________________________________DATE________________
REVIEWED BY_____________________________________________________
ORGANIZATION___________________________________________________
9
June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO.________________
LOCATION___________________________________DATE________________
REVIEWED BY_____________________________________________________
ORGANIZATION___________________________________________________
d. Base Plate
f. Foundation (coordinate with
Geotechnical Report)
g. Other Design Considerations (L.L.
Reduction, Continuity)
h. Deflection (Short & Long Term)
i. Drift
j. Non-structural Elements Anchorage
k. Lateral Load Analysis
10