Sunteți pe pagina 1din 6

COMPANY: ZAMBIA

JOB NAME: Kasama Hospital Zambia TENDER


SUBCONTRACT PACKAGE: Earthworks
SUBMISSION DATE:
PAGE ITEM DESCRIPTION UNIT QUANTITY
1 Project: Specialist Hospital, Kasama - Zambia [LOT
01: Tender for Core and Shell]
1 Site: Specialist Hospital, Kasama
1 Version/Date: 1.0 / JULY2018
1 General Notes:
1 Descriptions of works in the Bill of Quantities must
be read in conjunction with descriptions,
information, requirements, and stipulations
contained in the General Technical Specifications
included in this tender

1 Definitions and abbreviations:


1 "general site" denotes area between building
footprint and construction site boundary
1 "under ground slabs" denotes areas beneath
building foundations and ground slab up to the top
of the slab
1 "CSA" denotes Civil, Structural, and Architectural
works
1 "MEP" denotes Mechanical, Electrical, and
Plumbing works, as well as other associated
technical systems and building systems
1 "DPM" denotes damp-proof membrane
1 "CMU" denotes concrete masonry unit
3 Section 2: Earthworks
3 2.A Section 2: Earthworks
3 2.A.02 Excavations Other Than Bulk
3 2.A.02.01 Excavations for foundations in compacted imported
backfill material under buildings
3 Excavation to a Depth of 1.050m from finished
platform level
3 2.A.02.01.01 Main Building (GF+2, GF+1) m3 835
3 2.A.02.01.02 Main Building (GF) m3 1,720
3 2.A.02.01.03 Vip Ward Building m3 0
3 2.A.02.01.04 Nuclear Medicine Building m3 0
3 2.A.02.01.05 Dialysis Building m3 0
3 2.A.02.01.06 Administration Building m3 0
3 2.A.02.01.07 Education Building m3 144
3 2.A.02.01.08 Relatives Shelter m3 109
3 2.A.02.01.09 Mortuary Building m3 230
3 2.A.02.01.10 Technical Building m3 0
3 2.A.02.01.11 Logistics Building m3 651
3 2.A.02.01.12 Guard Building m3 80
3 2.A.02.02 Excavation - Utilities Infrastructure
3 Excavations for utilities infrastructure in compacted
imported backfill material under elevated building
slabs and covered walkways according to utilities
drawings (incl. pipes up to 1,0m off perimeter)

3 2.A.02.02.01 Excavation of water supply line and fire hydrant m3 23


water supply line trenches - For average trench
cross-section of 50 cm (W) x 50 cm (H)
3 2.A.02.02.02 Excavation for construction of below-grade sewage m3 1,072
disposal system components - For average trench
cross-section of 55 cm (W) x 50 cm (H)

3 2.A.02.02.03 Excavation of electrical conduit trenches - For m3 83


average trench cross-section of 50 cm (W) x 50 cm
(H)
3 2.A.02.03 Excavation - Surface Water Drainage Channels
3 Bulk excavation in material as found for surface
water drainage channels within general site
3 2.A.02.03.02 Excavation for foundation drainage system m3 0
according to exterior wall details
3 2.A.02.04 Excavation - Covered Walkways
3 Excavations for foundations in compacted imported
backfill material
3 2.A.02.04.01 Covered walkways m3 34
3 2.A.03 Backfill and Compaction under Substructure Works

3 2.A.03.01 Backfilling to trenches, holes, etc. with materials


from excavations (G5) raised and compacted in
layers of 150mm thickness (according to Site
Investigation Report)

3 2.A.03.01.01 Main Building (GF+2, GF+1) m3 358


3 2.A.03.01.02 Main Building (GF) m3 1,065
3 2.A.03.01.03 Vip Ward Building m3 0
3 2.A.03.01.04 Nuclear Medicine Building m3 0
3 2.A.03.01.05 Dialysis Building m3 0
3 2.A.03.01.06 Administration Building m3 0
3 2.A.03.01.07 Education Building m3 89
3 2.A.03.01.08 Relatives Shelter m3 68
3 2.A.03.01.09 Mortuary Building m3 143
3 2.A.03.01.10 Technical Building m3 0
3 2.A.03.01.11 Logistics Building m3 403
3 2.A.03.01.12 Guard Building m3 48
3 2.A.03.02 Backfilling to covered walkways
3 Backfilling to trenches, holes, etc. with materials
from excavations (G5) raised and compacted in
layers of 150mm thickness
3 2.A.03.02.01 Covered walkways [backfill below on grade m3 15
walkway slabs]
3 2.A.05.02 Backfilling of Utilities Infrastructure
3 Backfilling with materials from excavations (G5)
raised and compacted in layers of 150mm thickness

3 2.A.05.02.01 Compacted backfill of water supply and sewage m3 1,094


trenches below building up to 1,0m off perimeter
[Compacted backfill depth of 20 cm, trench width
50 cm]

3 2.A.05.02.02 Compacted backfill of electrical conduit trenches m3 83


below building up to 1,0m off perimeter
[Compacted backfill depth of 20 cm, trench width
50 cm]

3 2.A.05.02.03 Compacted backfill of earthing trenches below m3 0


building up to 1,0m off perimeter [Compacted
backfill depth of 50 cm, trench width 46 cm]
3 2.A.05.05 Gravel Layer in Rainwater and Surface Water
Drainage Channels
3 Backfill with suitable site excavation material
3 2.A.05.05.01 Gravel layer in rainwater and surface water m3 0
drainage channels [depth of 15 cm, trench width
100 cm]
3 2.A.06 Miscellaneous Earthworks
3 2.A.06.01 Removals
3 2.A.06.01.01 Extra over all excavations for loading and carting m3 1,624
away surplus excavated material
3 2.A.06.02 Termite Treatment
3 2.A.06.02.01 Use of approved Anti-termite Material on all m2 3,634
subbase layers in contact with the soil before
starting the blinding works.
6.00 5,010.00
6.00 10,320.00
6.00 -
6.00 -
6.00 -
6.00 -
6.00 864.00
6.00 654.00
6.00 1,380.00
6.00 -
6.00 3,906.00
6.00 480.00
-
-
6.00 138.00

6.00 6,432.00

6.00 498.00

-
-

6.00 -

-
-

6.00 204.00
-

6.50 2,327.00
6.50 6,922.50
6.50 -
6.50 -
6.50 -
6.50 -
6.50 578.50
6.50 442.00
6.50 929.50
6.50 -
6.50 2,619.50
6.50 312.00
-
-

6.50 97.50

-
-

6.50 7,111.00

6.50 539.50

6.50 -

-
6.50 -

-
-
4.50 7,308.00

-
1.00 3,634.00

62,707.00

S-ar putea să vă placă și