Sunteți pe pagina 1din 3

OEE

Machine(s): Date:

Product: Thanks to Stan Ritzert for providing this to NWLEAN.


Shift:
Please direct any questions about this spreadsheet to:
Availability:
Stan Ritzert, Stan.Ritzert@emersontool.com
A: Gross Available Time Min
B: Planned Downtime Min

C: Total Available Time


0 Min
(Gross Available Time - Planned Downtime) A-B

D: Downtime Losses

Taken From Downtime Log


# Breakdowns Min

# Setups & Adjustments Min Min

# Minor Stoppages Min

Total Downtime Losses 0 Min


E: Operating Time

(Total Available Time - Downtime Losses) C - D #DIV/0! %

F: Percent Equipment
Performance Rate: Availability
G: Total Parts Produced
(Operating Time/Total Available Time (E/C)
This Includes Both Good and Bad Parts Parts
H: Ideal Cycle Time Min/Part
I: Performance Rate
{(Ideal Cycle TimexProcessed Amount)/Operating Time}
{(H x G) / E} #DIV/0!

Quality Rate
J: Defected Parts Parts
K: Quality Rate
{(Processed Amount - Defect Amount) / Processed Amount}
{(G - J) / G} #DIV/0!
L: Overall Equipment (Machine) Effectiveness
(% Equipment Availability x Performance Rate x Quality Rate)
(F x I x K)
#DIV/0!

Page 1 of 1
EQUIPMENT # ___________________________ OVERALL EQUIPMENT EFFECTIVENESS

E
R

AG
CE

OR
VE
TIME WHEN TIME WHEN IT

RT
AN

AT
EO
MACHINE WAS

S
HO

ER
EN

ES
STOPPED. RESTARTED.

G
P

ER
OP
T. S
I NT

T-U

OC
AN
ENTERED BY ENTERED BY TOTAL TIME

H
MA

MA

NO
CH

PR

OT
SE
DATE OPERATOR MAINTENANCE IN MINUTES

MS 3035

S-ar putea să vă placă și