paragraph 01 Which article describes Liquid penetrant examination? 02 Does it require a written procedure? T 621.1 03 Does a procedure qualification is required? No. only demonstration T 621.2 is required unless ASME Sec VIII specified by the code Div. 1 section. Mandatory appendix - 8 04 What do you mean by Penetrant test equipment? T 630 05 What is meant by control of contaminants? T 641 06 How surface preparation is done? T 642 07 How much area to be prepared? T 642 08 What do you mean by essential variables? Table T 621.1 09 What do you mean by non-essential variables? Table T 621.1 10 List out essential and non-essential variables: Table T 621.1 Surface preparation Essential Table T 621.1 Penetrant group/ family Essential Table T 621.1 Penetrant application method Essential Table T 621.1 Removal of excess penetrant Essential Table T 621.1 Application of developer Essential Table T 621.1 Maximum and minimum time periods between steps Essential Table T 621.1 and drying aids Decrease in penetrant dwell time Essential Table T 621.1 Increase in develop dwell time (interpretation time) Essential Table T 621.1 Minimum light intensity Essential Table T 621.1 Surface temperature outside of 50C to 500C or as Essential Table T 621.1 previously qualified Performance demonstration, when required Essential Table T 621.1 Personnel qualification requirements Non-essential Table T 621.1 Materials, shapes, or sizes to be examined and the Non-essential Table T 621.1 extent of examination Post examination cleaning technique Non-essential Table T 621.1 11 Minimum and maximum time limits for steps in Penetrant examination procedure: Drying after preparation T 643 Penetrant dwell time T 672 Penetrant removal for solvent removable penetrant T 673.3 Drying after penetrant removal (solvent removable) T 674 Developer application T 675 Developing and interpretation time T 675.3 & T676 12 Techniques for standard temperature T 652 13 Techniques for nonstandard temperature T 653 14 Technique restrictions T 654 15 Calibration of light meters T 660 16 Penetrant application T 671 17 Penetrant dwell time T 672 18 Excess penetrant removal T 673 19 Drying after excess penetrant removal T 674 20 Developing T 675 21 Wet developer application T 675.2 22 Developing time T 675.3 23 Interpretation T 676 24 Characterizing indications T 676.2 25 Lighting requirements T 676.3 26 Post examination cleaning T 677 27 Evaluation T 680 28 Documentation T 691 29 Records T 692 30 Which appendix of Sec VIII Div. 1 describes PT acceptance criteria 31 Eye test requirement as per Div. 1 8-2 32 Qualification requirement as per Div. 1 8-2 33 Relevant indications 8-3 34 Linear / rounded indications 8-3 35 Acceptance standard 8-4 36 Repair requirements 8-5