Sl. No. Description of Work Qty. in Sf Design Cell Fialka Pronayon Ehsan Khan
Work Rate inTk. Amount in Tk. Work Rate inTk. Amount in Tk. Rate inTk. Amount in Tk. Work Rate inTk. Amount in Tk.
Architectural-
Architectural 20 1,955,100 G. Floor 27 2,639,385 CDA Format 12 1,173,060
Architectural Design and
Engineering Consultancy Architectural-
1 for Resident Complex for 97,755 Structural 8 782,040 Building 15 1,466,325 3D Format 22 2,150,610
1,500 Non-Management 42 4,105,710
Water & Sanitary 4 391,020 Structural 5 488,775
Staf
Electrical 3 293,265 Plumbing 3 293,265
Electrical 3 293,265
Grand Total 35 3,421,425 42 4,105,710 42 4,105,710 45 4,398,975
Name of Consultants
S.L Field of Compare Unit Remarks/
Design cell Fialka Pronayon Recommendation
No of Building / Block High rise building is
1 project Area prefered where the
Nos 12 3 3 land is limited &
Building Storey/Floor price is so high.
2 consider
Floor G+ 4 & G+ 5 G+ 10 G+ 5 Scattered building
service facility is low
3 No of Room 720 780 750 also cost is high also
covered more area
No of Dwellers/ Tenant with huge
4 in each floor each 30 28 100
construction
building Nos activities. As the G+5
Ground Floor Area uses is more efective
5 without lift which
in Sqm Sqm Nill 2912 3045
also leads good
building service with
Common Facilities cost economic
6 (Dining, Kitchen & Prayer In 4-nos block In single place In single place
design. So as above
etc.) Block perspective view &
7 Lift facilities Nos 0 6-nos 0 considering all other
aspects we can
8 Incorporation of water proceed for G+5
body Not incorporated Incorporated Incorporated building to make the
9 Pheripherial Road Used Used Not Used Dormitory more
efficient.
10 Ventilation Provided Provided Provided
11 Building service Medium Medium Good
Area= Area=
G+4=8X60X160=76800 Area= 7,340x3 = 22,020 Sft x10 = 1,015x3X6 =
12 Rough cost estimate idea G+5=4X60X160=38400 = 2,202,000 sft + Misc. = TK. 196,403 Sft X
316,800 Sft X 1,800 + 500,000,000 + Tk.30,000,000 for 1,800 +Misc. =
Miscellineous = TK. piling = Tk. 530,000,000 TK.
590,000,000 380,000,000
4 No of Dwellers/ Tenant in 30 1
each floor each building Nos
5 Ground Floor Area uses 1
in Sqm Sqm Nill
Common Facilities
6 (Dining, Kitchen & Prayer In 4-nos block 2
etc.) Block
7 Lift facilities Nos 0 5
8 Incorporation of water 1
body Not incorporated
9 Pheripherial Road Used 5
10 Ventilation Provided 5
11 Building service Medium 3
Total Weitage = 31
Name of Consultants Weitage (In
S.L Field of Compare Unit
Fialka 5 scale)
No of Building / Block
1 Nos 3 5
project Area
Building Storey/Floor
2 Floor G+ 10 1
consider
3 No of Room 780 2
No of Dwellers/ Tenant in
4 Nos 28 1
each floor each building
Total Weitage = 36
Name of Consultants Weitage (In
S.L Field of Compare Unit
Pronayon 5 scale)
No of Building / Block
1 Nos 3 5
project Area
Building Storey/Floor
2 Floor G+ 5 5
consider
3 No of Room 750 2
No of Dwellers/ Tenant in
4 Nos 100 4
each floor each building
Total Weitage = 44