Start - Civil works

NO - Transfer tower installation


Approval
- Trustle installation
sheet
- Frame gallery installation
- Kick of Meeting - Head pulley, tail pulley, bend pulley, take up
- SoW pulley.
YES - Mechanical works
Procurement
- Electrical works
- Collecting data - Instrument works
- Survey & measurement
- Propose general arrangement
- Fabrication
- Pre assambling YES
- Sand blasting & painting NO
Engineering process Alignmnet &
- Assembling Measurement

NO
NO YES
- Final GA drawing. QC & VAT
- Final coordinat
- Checking
Pre running
- Setting
YES test
- Tighting
YES
- Preperation NO
Engineering process Packing & Delivery - Permit YES

- Calculation sheet
- Basic drawings (ME&str) NO
NO - Dry test comm.
- Material specificaton. Checking - Wet test comm.
material - Approval

NO
YES
Approval YES YES
sheet

Finish
YES - Mob & demob
- Survey & Measurement

- Detail design engineering


- Final calculation reports
- Procedure installation reports