METRO EXPRESS PROJECT


J

ENGINEERING, PROCUREMENT AND CONSTRUCTION WORKS


q a I!!!I—Ile

Environmental Management and Sustainability

MEL-LNT-SBM-PMP—PCD-OOZ Rev-4

Date: 03'd September 2018


I—L—L—I—n
1:1!

@LARSEN & TOUBRO


'Ii;
ÎPROJECT
TITLE METRO EXPRESS PROJECT

DOCUMENT TITLE ENVIRONMENTAL MANAGEMENT AND SUSTAINABILITY

Rev Date Prepared by Reviewed by Approved by i

0 v0.00 I
n 03/00/2010 W
. ‘L “'-
Palanikumar Raja
3 M Ï.
Î

*
s

n 28mm m Pa'amkumamaja {I
n 28/11/17 Shailendra Yadav TSRM Subhendu Ghosh

I
I
I
l

I
I
\1
\

W.

Environmental Management and Sustainability PageI


.
I ï


@ LANSEN 8r TOUBRO

EXECUTIVE SUMMARY

Submittal: ENVIRONMENTAL MANAGEMENT & SUSTAINABILITY SYSTEM / PLAN

In responding to Submittal: ENVIRONMENTAL MANAGEMENT AND SUSTAINABILITY


REQUIREMENTS, Larsen & Toubro (L&T) has provided a Design & Construction Environment
Management Plan (DCEMP) which has been developed by L&T and describes how Health, Safety
& Environment (EHS) issues will be addressed and managed during the Project based on L&T's
EHS and Sustainability Policy as well as the Programme requirements. The DCEMP forms
therefore part of the project-specific Environmental Management System (EMS) developed by
L&T for Mauritius Metro Express Project.
L L L L L' È
I
I—J
ELL
I

L—J

‘7’

Environmental Management andSustainability Page |iii


Q" (ANSE?! 6 'ÏJUI ~";

TABLE OF CONTENTS

PAG E

ABBREVIATIONS

01
1 INTRODUCTION
1.1 Project Description
1.2 L&T Environmental Management System (EMS)
1.3 L&T Corporate EHS Policy

A0030)
ENVIRONMENTAL MANAGEMENT SYSTEM FOR THE PROJECT
2.1 Management System approach and implementation 14
2.2 Organizational Structure, Roles and Responsibilities 16
2.2.1 Roles and Responsibilities 17
2.2.2 EHS Organization Chart for the Project 30
2.2.3 Documentation 31
2.2.4 Document Review and Updates 32
2.2.5 Communication 33

DESIGN & CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (DCEMP) 37


3.1 Introduction 37
3.2 Project Environmental Objectives & Targets 37
3.3 Legal and Other Requirements 38
3.4 Environmental Impacts Management 40
3.4.1 Air Quality Management 40
3.4.2 Water and Wastewater Management 42
3.4.3 Use of Natural Resource and Materials 48
3.4.4 Solid Waste Management 50
3.4.5 Traffic Impacts 59
3.4.6 Ecology Impacts 59
3.4.7 Other Environmental Condition(s) or System(s) Impacts 60
3.4.8 Evaluation of significance of Environmental Impacts 62
3.4.9 General Conduct of Work 70
3.4.10 Labour provision 71
3.4.11 Transport management 72
3.4.12 Removal and Trimming of Trees in Public Right -of —way 72
3.4.13 Terrestrial and aquatic ecology protection 72
3.4.14 Tree Plantation 75
3.4.15 Contaminated land management 77
3.4.16 Acid sulfate soil management 78
3.4.17 Noise and vibration attenuation management plan 79
3.4.18 Cultural Heritage Management 83
3.4.19 Ozone Depletion 84
3.4.20 Avoidance of Nuisance 85

Environmental Management and Sustainability Paa j 1


(U
9 LARSEN d TOUBRO

3.4.21 Public Consultation and Grievance Redress Mechanism 85


3.4.22 Protection of Community Values 85
3.5 Environment Quality Monitoring 86
3.5.1 Ambient Air Quality 86
3.5.2 Water Quality Monitoring 90
3.5.3 Noise level Monitoring, locations and frequency 93
3.6.1 Performance Measurement and Monitoring Controls 94

4 0&M ENVIRONMENTAL MANAGEMENT PLAN 98

5 ENVIRONMENTAL INCIDENT MANAGEMENT PROCEDURES 101

6 SUSTAINABILITY MANAGEMENT PLAN 103


6.1 Purpose & Scope of the Sustainability Management Plan 103
6.2 Sustainability policy Statement 103
6.3 Focus area for Sustainable Development 106
6.4 Carbon Footprint 114
6.5 Performance Evaluation and Review 115
6.6 L&T’s Corporate Sustainability inrt'iative 116

7 INDUCTION, TRAINING & AWARENESS 116


7.1 EHS notice board & feedback method 116
7.1.1 EHS Notice Board 116
7.1.2 Feedback Form 117
7.1.3 Suggestion Box 117
7.2 EHS Commrtt'ee Meeting 117
7.3 EHS walk down 117
7.4 EHS Communication 117
7.5 Helmet Magazine 117

Environmental Management and Sustainability Page |2


9 IARSEN I YOUBRO

TABLE OF FIGURES

PAGE

Figure 1: Project Alignment Location 6


Figure 2: Distribution of Temporary establishment to support construction activities on multiple
fronts 8
Figure 3: LARSEN & TOUBRO LIMITED ISO 14001:2015 certificate 10
Figure 4: Corporate EHS Policy 12
Figure 5: Project Specific EHS Policy 13
Figure 6: PDCA Methodology for Environment Management System 14
Figure 7: Environment Management System implementation 15
Figure 8: L&T Organizational Chart of key personnel for Mauritius Metro Express Project 16
Figure 9: Organization Chart for Environmental Management of Project 31
Figure 10: Lines of Communication 36
Figure 11: MSW Composition in Mauritius 53
Figure 12: LARSEN & TOUBRO LIMITED Corporate Sustainability Policy 104
Figure 13: Project Specific Sustainability Policy 105
Figure 14: Sector Wise Energy Consumption Pattern in Mauritius 106

IJ' J'ÆÆIIJ-J
Figure 15: Sector wise energy consumption Pattern in world 107
Figure 16: Percentage Share of Energy Sources in the Electricity Production in 2016,

F
Mauritius 107
Figure 17: Percentage Share of Energy Sources in the Electricity Production (Globally) 108

_I
æfl=g:%==a
7: I

Environmental Management and Sustainability


w
‘U
m

Ç]
.J
n
I

N
T —
@ LARSEN & TOUBRO

TABLE OF TABLES

PAG E

Table 1: Project Salient Features 7


Table 2: Typical Complaint Record 35
Table 3: Details of Regulatory Framework for Environmental Management of the Project 38
Table 4: Format for Maintaining Legal Register 39
Table 5: Format for Maintaining Approvals taken under laws 40
Table 6: Water Quality of rivers in vicinity of project 46
Table 7: Permissible limits for the effluent discharge in oceans 46
Table 8: Key Construction material requirement 49
Table 9: Use of Resources during Construction 49
Table 10: Applicable Acts/Rules for SWM 50
Table 11: Waste Transfer locations in Mauritius 53
Table 12: List of Authorised Recylcers 57
Table 13: Criteria for Description of Probability 62
Table 14: Criteria for Description of Severity 63
Table 15: Criteria for calulating Significance of Environmental impact 63
Table 16: Environmental Impact Significance 64
Table 17: Terrestrial and Aquatic Ecology Control Methodology and Mitigations 73
Table 18: Noise and vibration sensitive buildings along the corridor. 80
Table 19: Noise Construction Noise Criteria 82
Table 20: Vibration performance criteria (Table A2.3 of Annexure 2, Part 1) 82
Table 21: Ambient Air Quality from Environment Protection (Standards for Air) Regulations 1998
GN No. 105 of 1998 88
Table 22: Ambient Air Quality Standards and Measurement Methods from Environment
Protection (Standards for Air) Regulations 1998 GN No. 105 of 1998 89
CE E E E EZ Z

Table 23: Members of the meetings of EHS committee. 96

Environmental Management and Sustainability Page|4


(9' .' Mu“! 5 mus‘ro

ABBREVIATIONS

CEB Central Electricity Board


CEMP Construction Environmental Management Plan
CFCs Chlorofluorocarbons
Ch Chainage
CWA Central Water Authority
dB Decibel
DC Direct Current
DG Diesel Generator
DCEMP Design and Construction Environmental Management
Plan
EHS Environmental, Health & Safety
EHSMS Environmental, Health & Safety Management System
EIA Environmental Impact Assessment
EMP Environmental Management Plan
EMS Environmental Management System
EPA Environment Protection Act
GHG Greenhouse Gas
GRC Grievance Redress Committee
HFL High Flood Level
ISO International Organization for Standardization
LRT Light Rail Transit
MSDS Material Safety Data Sheet
MSW Municipal Solid Waste
NCR Non Compliance Report
NO Nitrous Oxide
NOC No Objection Certificate
PDCA Plan—Do—Study—Act
PM Particulate Matter
PPE Personnel Protective Equipment
OHSAS Occupational Health and Safety Assessment Series
O&M Operation and Maintenance
TKm Track Kilometer
SOx Sulfur oxide
SPM Suspended Particulate Matter
SMP Sustainability Management Plan
SWQ Surface Water Quality
VOC Volatile Organic Compounds
WHO World Health Organization

Environmental Management and Sustainability Page |5


© une»: a roucno

1 INTRODUCTION

1.1 Project Description

The 26-km route will connect Curepipe to Immigration Square in Port Louis and will feature 19
stations, two of which will be state-of—the—art elevated stations. The alignment will connect four
major bus interchanges enabling a multimodal urban transit solution. Apart from stations, the
scope of the project will include the construction of viaducts & bridges. track works (with
substantial ballast-less tracks including plinth, embedded and grass tracks), DC electric traction
systems, ticketing & passenger information systems and integration with road traffic through
advanced signaling systems, procurement of rolling stock from world majors in LRT (Light Rail
Transit) and construction of depots along with maintenance equipment.
A layout of project alignment and location is given below:
Figure 1: Project Alignment Location

Key project details are as listed below:


L Lb L L L L L

Environmental Management and Sustainability Page \6


\
H\—
Q LARSEN I rouno

Table 1: Project Salient Features

1
project
Works

Contract Value 18.8 Billion MUR (Bid Currency USD, MUR, EUR) —

Duration
n 19 Numbers (2 Elevated, 17 at grade) _
26 kms total length

n
Phase-1 : 12.4 km, Phase 2: 13.6 km

Railway Systems

Non-Traction Power System


1 Deot
Control & Monitoring Systems ( Electronic Ticketing 19 Stations /
system, PIS, PAS, Telephone system, CCTV, 1 OCC
Traffic Si ' '
10 Track Works Ballasted Track 37.8 TKm

Embedded Track 12.6 TKm

Civil Structures — Viaducts and Brides 2.4 RKm


Roadworks 12.96 Km

Bu'ldmgs _ and Bus interchange facilities 4 stations


Urban Desrgn
Depot and Operational Control Centre Building 1 Nos

A layout plan showing details of temporary facilities is below:

Environmental Management and Sustainability Page |7


9 LARSEN G YOUDRO

Figure 2: Distribution of Temporary establishment to support construction activities on multiple fronts

Construction Site 2 - Phoenix Constmction' Site 3 Mandela

- Site office
' Selwo'suore,065nedue - Casting Yard
- Setup for road work - Batching plant
' Seam of Other General Plant ' Electrical 8. Signal": Stale:
[Equipment - 00. Function snap Construction Construction
- Mneml Sucking van! - Setup for road work Site 7

1
- Equipment nee: Vera ' Setup ofOrherGenerIl Plant


/Equnpmem

i“
- Mneru‘i Sucking van!

' Equipment fleet Yard

mam Borne Rose Hill


Interchange

Main Prayect‘
Office
Construction Site 4 Construction Site 6
Construction Site 1 Vacos Depol St. LOUIS

' Slalom
- Temponry Site Office for
5

' Cumin!“
H11 - Mancunian:

- Site office
- Sterne of hit / Sleeper ' SnunofStDrl,DG
' Track store
Met;
- Rollin; Stout ' Semahrmwm
Storage facility ' Setupthhv
- Setup al Other Gena-Imam
General Plum [SW
C CECECE E

[Equipment ° Wlsnou‘n'
VIM
' Equpmmflefi‘rm
- Priority Section
l 1L.

Environmental Management and Sustainability Page I8


t...i
—!—_

CL î
@ (f) LARSEN a. rouano

1.2 L&T Environmental Management System (EMS)

L&T has as a corporate has established and implemented the globally approved and well proven
Management Standards ISO 14001 :2015 which covers all its business functions and project sites.
The scope covers identification of all environmental aSpects related to project activities executed
at sites, associated Environmental Impacts with it and control measures to be in place to minimise
the impacts. This is achieved by a team of dedicated professional who focus on addressing the
issues right from the stage of design, planning followed by execution. A copy of the L&T ISO
14001 :2015 certificate is provided in Figure 3.

The EMS is supported by the highest level of management and structured according to the
following methodology — known as "PDCA" - to ensure continual improvement:

0 Planning ('Plan' - P);

o Implementation and Operation ('Do' - D);

0 Checking and Corrective Action ('Check' - C); and

0 Management Review ('Act' - A).

The elements of the EMS are consistent, thus ensuring that all parties involved in the Project have
a common, uniform understanding of the environmental management strategy.

All documents relevant to the Construction Environmental Management Plan (CEMP) shall be
controlled. The controlled documents include CEMP, procedures, audit reports, incident reports
and community complaints. The EHS Manager will be responsible for the periodical review of the
DCEMP and associated documents.

If any non-compliance is observed onsite, the Environment Manager/ Engineer will prepare the
corrective action plan immediately. The corrective action plan also needs to include preventive
measures for avoiding similar incidents.

Environmental Management and Sustainability


LARSEN G TOUBRO

Figure 3: LARSEN & TOUBRO LIMITED ISO 14001:2015 certificate

(.auuzz-cuLu—rmwmn_ 4. raw-w. .--- .ua

I
J'
I . “0...”... -v- -- . 4 ..
,1
W3.
..-- 3:15:51 -‘_m~'n'.uam .‘n
DNV-GL
E
i
g
MANAGEMENT SYSTEM
E
“CERTIFICATE
w‘m. .x .59.“ —

M- A... “r- 'Dr' ,1

N‘uçm.œnw'fie,vw59cms.m,a

Larsen &Toubro Limited


(utcm-TWW
mmommumy
W)
um. A un; (MM Sun-ou (nom—mutant...
m1, W m”) MI...

MWMntm-NWMWW
unuoonzons

n. Lunhouacahd'o'mtwfl”
mdmwun—unm—n
IMG_“M

“.0
h—*—.--—
“flu”

En"
58.0"..-“

.-o~O--v, --’.p4—. no “-I”«0.-~'*h.

Environmental Management and Sustainability Page |1O


© Q LARSEN I TOUDRO

1.3 L&T Corporate EHS Policy

L&T is committed to conducting the Project construction activities in a safe and environmentally
responsible manner in line with L&T Environmental, Health & Safety (EHS) Policy as well as the
Project EHS Plan. L&T is therefore committed to:

o Comply with and maintain environmental. health and safety practices that meet applicable
legal and other requirements;
0 Continuously improve environmental, health and safety performance in all its functions;

FPPHFF
0 Prevent unacceptable risk during construction activities and implement measures to
ensure the protection of the environment and safety of staff;
o Reduce, reuse and recycle available materials and waste to minimise disposal to landfill

'
and incineration; and

I
o Foster a culture of EHS awareness and incident-free workplace among all personnel
within L&T, business partners, clients and the public.

n
I
The L&T Group EHS Policy will be displayed at L&T site offices and meeting rooms,
bulletin boards, stores, communal areas and any other noticeable locations on site. A copy

Ü
of the L&T Group EHS Policy is provided in Figure 4. In addition, the EHS Policies will be
communicated during Induction Training and Daily Toolbox Talks.

Managers, Line Managers and Supervisors, demonstrate their commitment and


leadership by ensuring that our policies & objectives reflect current corporate and

rug-ni-
legislative requirements and that effective environmental practices and behaviours are

.äa‘
encouraged throughout the workforce.

Fm
0 Managers, Line Managers and Supervisors, demonstrate commitment to improve
environmental performance through leadership and active, visible EHS participation.

o Environmental Policy and Objectives are regularly reviewed to ensure they reflect current

s
corporate and legislative requirements and are effectively communicated to the workforce.

o Mechanisms exist at all levels to encourage & promote the transfer and adoption of good

s
environmental practices and technologies—internally & externally.

o Responsibilities & delegation of authority are documented & clearly known to the
organization

0 Allocation of resources is made towards EHSMS to ensure good environmental standards


in place and to promote best practices in site.

LARSEN & TOUBRO LlMlTED’s environmental, health and safety policy is committed as below:

Environmental Management and Sustainability Page |11


ï-‘nu‘r‘p r.p..-r.au;‘e Environment,
Safety (EHS) Policy

a
As an integral part of our business philosophy, we are
committed to conserving the environment and
providing a safe and healthy workplace to our
employees and stakeholders. To achieve this, we shall:

Incorporate EHS considerations in all business processes


Ensure compliance with statutory and other applicable
requirements
Prevent adverse environ me ntal impacts and
occupational health and safety risks
Conserve natural resources, minimise waste generation
and environmental emissions
lmpart structured training and augment resources for
effective EHS performance

.
Encourage communication, consultation and
collaboration with all stakeholders

>a4t.;,iw‘.-’K.;-~.i'n
~
.'

AMN'AIK
- 41 1 "&!.Mi12v"'

a
.

J- Ilth June. 2013 Group hem!" e (hmrman


4.

G
b
l
« win!"

LARSEN & TDUBRO

' fixa-“vu. . '_,u._.ï{..uu-nk'Înuage)"-..\..""—-."..___*'Ïa>.'m‘..w.b-._ . v. “0,, äflùm,” hm“ . 'mV-mn:";m>\3r:—w.+\r'7‘ ‘5' '


Q LARSEN â TOUBRO

Figure 5: Project Specific EHS Policy

i.t‘é-.‘-r,.wl'3'."".,fix...»-:'~‘<
._. M” ‘
‘-. --“‘5...”
~ ."__-- ‘ .l“Huh,
a. _ _.
M, ...
t. p.“
as..,_ ...__.> . ._

.
r

Environment: .la-gz-zc-“tlath- t.*~".r".~.' 5a.”-væ:"y lielrl-llLDEl l?stillsy


L&T management is committed to {vs-onetie safe and nee-it! n: mu;arcirzrs: For at: emplici'mas and

ensure all operations of the Metro Express ijsct‘. Mauri-jus. are ssrn'eé out in a manner that

is safe. sustainable and protects the environment 8. wmmunity in general.

r‘ L&T believes all accidents, i'njun'es and adverse environmental impacts are preventaol’e.

r‘ Everyone is responsible and accountable for implementing and maintaining the Safety.
Health 8. Environment Management System.

r‘ No task is so important that n'sk to people in form of injun'es or damage to the environment
is justified.

The objectives of the policy shall be achieved by:

0 Promoting a positive Environment. Health & Safety culture;

0 Complying with all applicable Environment. Health & Safety legislation & other
requirements

0 Identifying hazards including specuf'nc hazards due to workan adjacent to running


traffic. public 8. Community places. utlllties in work area as well as environmental
aspects related to construction w0rk that could cause injury. illness or environmental
harm and implement necessary measures to mitigate the n'skl impact.

0 Ensuring the safety of entire project team and members of public affected by the project
by adhering to laid down norms for construction work of Metro Express Project.
Mauritius.

0 Prowding training, competence & awareness to all employees with the aim of making
them more aware of risks to Environment. Health & Safety.

0 Regularly moniton‘ng the EHS performance through inspections. audits and continually
improving Environment. Health & Safety performance to create a safe, healthy and
sustainable environment

0 Encourage communication. consultation and collaboration with all stakeholders.

Date: 08/01/2018

M LRT/LNT/POL/G H/Ol/Rev.00 G LARSEN & TDUBRO

so. -,...A..

Environmental Management and Sustainability


® Q LARSEN 8 TOUBRO

2 ENVIRONMENTAL MANAGEMENT SYSTEM FOR THE PROJECT

2.1 Management System approach and implementation

For the L&T Organizational development and implementation of Environmental Management


System for the project, a stage wise and systematic approach will be followed. The already
implemented and proven system of L&T EMS Management system shall be adopted and
necessary amendments shall be made to make it more realistic, project specific and achievable.

L&T will appoint a well experienced Environmental Manager who can understand the contractual
requirement, legal and other requirements related to Environmental attributes of the project,
develop a Design and Construction Environment Management Plan and drive its implementation
in an effective and sustainable way. The well—planned and universally proven methodology of
Plan, Do, Check and Act shall be used for implementation of Environment Management System:

Figure 6: PDCA Methodology for Environment Management System


{I}, si , ")4 Khnfl-x—rmzmg ,

‘\ \\
«v7; ira; .
X

Plan
A
A.
Do
Understanding the Development of D&C
_ lax—1‘

Contractual Requirement Environment Management


Understanding & Reviewing Plan & its implementation
Legal and other requirement Providing training and
EHS policy awareness
Management Commitment Procedures and Processes for
Objective and Targets Environmental assessment
Roles & Responsibility Prepare Budget and Schedule
Allocation of resources

Check
Act
Routine inspections & Checks
Reviewing the approach
Audits
and methodology
Corrective and Preventive
Re-plan the existing
Action
process for improvement of
Key Performance Indicators
system
and Performance evaluation
Management review
Stakeholder communications
W mu. un». >47
LLLLLLL

Environmental Management and Sustainability Page |14


L—J
\
Q une» a. rouano

I.’
Figure 7: Environment Management System implementation

'.R‘e¢ie"__wi‘qvmng

J’J'J'B
un‘d’e.r'stavl'ndingthe N A.
contractual requirement

V
Reviewing ISO
14001 :201 5
Standards & Other
Identifying legal requirement Provide Training on ISO
and Environmental 1400122015 to all staff
legislations as applicable to
oroiect

Develop EHS Policy

Develop & Maintain


Legal Register

Prepare D&C Procedures & Process for Activities


Assigning Roles and Environmental causing Environmental Impacts
Responsibilities Management Plan

I::Performance
Evaluation
(Environmental Inspections & Monitoring)

Audit & Review

Environmental Management and Sustainability


LL.

Q LAR‘EN a TOUE'O

2.2 Organizational Structure, Roles and Responsibilities

The L&T Organizational Chart of key personnel for the Maun'tius Metro Express Project is in Figure 8.
Figure 8: L&T Organizational Chart of key personnel for Mauritius Metro Express Project

Environmental Management and Sustainability Page I16


L. L L J LJ LJ L J L J
® @ LARSEN I TOUURO

2.2.1 Roles and Responsibilities

a) Contractor - L&T

L&T as Contractor has overall responsibility for implementation of Environmental


Management System across Mauritius Metro Express Project and will:

0 Obtain the relevant environmental permits, consents and authorization from


concerned authorities prior to start constructions works;
- Comply with all statutory requirements and conditions as mentioned in the clearances
and approvals.
o Comply with all rules, regulations, acts etc, as applicable to the project.
0 Ensure that all activities are conducted in a manner that minimises the impact on the
environment; and
0 Be fully responsible for ensuring the implementation of the requirements and mitigation
measures of DCEMP during construction activities.

L&T will ensure that any subcontractor engaged to carry out Project related tasks for this
Project complies with the provisions of DCEMP at all times, by reviewing their environmental
performance and carrying out environmental awareness sessions, audits and inspections
where appr0priate.

L&T will employ EHS professionals, who as a team will ensure that, the EHSMS is properly
implemented at all locations of construction activities and it’s performance is reviewed
periodically. The Management will provide adequate resources to the project team to in order
to achieve the objectives and targets.

L&T and its sub-contractors will observe all legal regulations and requirements. Additionally,
each sub-contractor is responsible for ensuring that all personnel under their control observe
the same. L&T and its employees retain the right to stop any operation, activity or erection of
plant equipment etc. if it is considered that there is a risk to the environment or health or safety
of any person.

Details of key personnel involved in the project are listed below and responsibilities are
detailed in subsequent sections.
# gn—Jfl “

Key roles and responsibilities for L&T staff under this DCEMP are provided below.

b) Project Director:

0 Overall responsibility for implementation of the D&C Environment Management Plan

0 Shall provide a strong and visible leadership to promote a culture in which all employees
share a commitment for environment protection.
l

Environmental Management and Sustainability Page |17


|
l
l
ap p -HHH'HI“
Q LARSEN G TOUBRO

Lead and fully support the overall EHS programme and procedures demonstrating EHS
ownership

Ensure overall compliance with all outcomes and obligations of this DCEMP and reviewing
environmental performance regularly.

Overall in-charge and accountable for the environmental & sustainability management and
performance at project level in ensuring work operations do not cause any severe impact
to the environment.

Placing Environmental & Sustainability matters high on the agenda of all meetings and
regularly participating in/ chairing relevant EHS meetings and take follow—up action on
environmental matters discussed.

Assess EHS capabilities of Sub-contractors prior to work commencement in addition to


the registration & approval process prior to issue of work order and ensure necessary
controls are in place and enforcement of compliance.

Responsible for ensuring that the Project EHS Policies are reviewed and updated as
required by the relevant authorities and client

Notify Mauritius Light Rapid Transit, Construction Management Agency (CMA) / Resident
Engineer and Third Party Environmental Agency - Environmental Consultant if any, in
writing of any environmental incident.

Allocate adequate resources for environment implementation as human resource, training


facilities, and machine/equipment/ tools and materials in order to fulfil the requirements.

Project EHS Head

Monitor implementation of Project EMP and compliance to all applicable legal and
contractual requirements.

Encourage line management to demonstrate commitment consistently by personal


participation in environment management initiatives.

Maintain integrity of incident investigation & review process to avoid recurrence.

Ensure availability of necessary records pertaining to the project to provide evidence of


conformance to the requirements and rendering reports to the concerned, as required.

Liaise with Project Director, PMC, Engineer's Representatives and other functions to
ensure adequacy of requirements.

Report status of compliance & performance to relevant authorities, as required.

Environmental Management and Sustainability Page [18


6.) anse» 1 rouuo

- Disseminate EHS Policies within the project and facilitate its implementation.

o Lead the project’s risk assessment team and provided expert advice for the team and
ensure availability of risk register; educate the team in its implementation.

- Authorized to act independently for taking decisions in compliance with law of the country
and customer requirements.

0 Educate the team on applicable legal & other requirements and monitor & report
compliance.

0 Ensure effective maintenance of arrangements for employee participation, consultation &


communication on all EHS issues.

0 Verify arrangements to handle emergencies; educate the team; observe mock drills for
adequacy of preparedness.

- Be a leader in incident investigations; disseminate learning through EHS meetings and


track actions.

0 Discuss audit findings with project team; follow-up Non Conformance Report (NCR)
closeout actions and preventive measures about ISO 14001 (EMS).

o Analyse & report project EHS performance and recommend areas of improvement.

0 Receives employer's, Engineer's latest EHS standards and procedures, and advises the
Project Director on the resources required for safe execution of the Project.

0 Chair Project EHS meetings and workers welfare meetings.

o Empowered to stop any activity that is not complying environment requirement.

d) Project Manager

0 The Project Manager is directly responsible for implementation of this plan in their
respective section/areas.

0 Assist in developing and monitoring the implementation of EHS control measures and
management systems to meet objectives.

- Ensure all the relevant approvals, No Objection Certificate (NOC), Permits, etc., from
concerned authorities are obtained prior to start of work.

0 Ensure that the Client's, Engineer's and statutory legal requirements are met.

Environmental Management and Sustainability Page [19


l
Q LARSEN a romano

0 Demonstrate commitment consistently by personal participation in EHS activities.

0 Chair environmental meetings, reviews and planning sessions.

o Empower staff / employees to work safely, without harming environment or health.

0 Shall provide vehicles, tools, equipment, facilities and other resources required for
implementing control measures.

0 Report all incidents and accidents to the Project Director and EHS manager and facilitate
in investigating incidents.

o Suspend any work or activity, which is likely to cause any significant impact on
environment and ecosystem of the area or is going to have long-term irreversible impacts
on environment. The circumstances should then be fully investigated and no work shall
be allowed to continue until appropriate remedial action has been taken.

0 Identify all foreseeable environmental risk where possible, which will assist contractors
when producing their job specific risk assessments and method statements.

- Co—ordinate with Project Director for selecting competent sub-contractors and their
performance is monitored.

0 Monitor activities during site visits for non-conformities; advise corrective & preventive
actions

0 Discuss audit findings with project team; implement corrective/ preventive actions and
initiate response for NCR closeouts.

0 Maintain necessary arrangements for employee participation, consultation &


Communication on all E & S issues.

e) Environmental Manager

0 Understand and ensure implementation of requirements and mitigation measures as per


the DCEMP at all times.

0 Ensure pollution control measures & sustainability management measures are practiced
LLLLLL

by the site personnel.

o Conduct E & 8 site inspection regularly and report non-conformances.


l
\—J

0 Implement E & S monitoring program in the DCEMP and report the results to the E & 8
Manager.

Environmental Management and Sustainability Page |20


l
à—â—n'
Q LARSEN G TOUBRO

L-

o E & 8 Recording and reporting as mentioned in the DCEMP.

0 Monitor and ensure personnel and subcontractors comply and adhere to environmental
regulations.

0 Coordinate the response to internal and external complaints relating to the environmental
performance of the site, along with the Environmental Manager.

rrrp
0 Investigate environmental incidents, communicate the investigation results, and proposed
corrective action to the EHS Manager.

0 Attend EHS meetings to contribute to a safe and healthy working environment.

0 Stop any activity that are not complying with environmental legislation or project
environmental requirements and rectify non-compliance environmental conditions
promptly on site.

0 Prepare EHS training material.

FM”—
f) Sustainability Manager

o Identification of sustainability risk associated with every project activity and incorporation
of the same in method statements.

- Liaison with concerned authorities, Consultant engineers and agencies for smooth

!
implementation of project sustainability requirements.

o Monitor performance (including sub-contractors), identify the focus areas & establish l ÿ
action plans / objectives for improvement. “

0 Proper guidance & support to team members and ensuring all the activities comply with
the Sustainability Plan and environmental regulations.

M
0 Identify the need, requirement, and influence the developments / changes to project
environmental & sustainability documentation.

0 Enforcing, Inspecting, monitoring all the environmental, sustainability control plans,


procedures in order to achieve environmental and sustainability targets.

0 Ensuring staff and workers are trained and are made aware of Environmental &
Sustainability requirements & mitigation measures.

- Conduct meeting with higher personnel, raise sustainability requirements, and discuss any
non-compliances to be closed out.

Environmental Management and Sustainability


w.) 9 LARSEN G TOUBRO

' Ensure there is periodic measures, records, reports on air emissions, marine. soil and
surface water quality, amount and types of hazardous and nonhazardous waste, toxic and
hazardous materials used and released, and make known the associated risks to human
health and the environment

Implement programs and practices for sustainable material, energy and environmental
resources to reduce the environmental burden resulting from the development activities.

Identify potential adverse impacts on ecosystem and biodiversity; and implement planning.
design and operating practices to eliminate or minimize them.

Ensure the organization participates in raising the environmental and social responsibility
awareness of those with which it has relationships.

incorporate the protection of natural habitat, wetlands, forest, wildlife corridors, protected
E E E EÎ

areas and agricultural lands into any land development projects if applicable.

Empowered to stop any activity that does not fulfill the project / Iegal environmental
requirement.

g) Construction Managers

Ensure relevant permits and authorizations from Mauritius Light Rapid Transit or other
relevant agencies are obtained prior to start construction work.

Responsible for ensuring that the DCEMP is implemented onsite and regularly review the
compliance status.

Responsible for carrying out construction activities as per method statement and risk
assessments.

Enforce subcontractors to comply all aspects of the DCEMP and other relevant
environmental laws.

Monitor the workplace to ensure contractor's EHS compliance (with the DCEMP, Project
EHS Plan and legislation)

Review and analyse environmental performance during the Project as reported by the
Environmental Manager.

Ensure environmental incidents and non-conformances are reported, investigated and


rectified at the earliest possible.

Environmental Management and Sustainability Pa'qv...re|22


LARSEN I TOUDRO k
‘———————\——-——————fi

0 Hold regular coordination meetings with Project Engineers and Supervisors to ensure that
all tasks and activities are planned, coordinated and carried out safely with adequate
labour and resources and without severe environmental impact.

0 Work Lead/ Participate in incident investigations; report within the timeframe; implement I1
actions to prevent recurrence.

'
- Liaise with local Government Authorities on environmental issues.

0 Stop any unsafe activity, which is not compliant with environmental legislation or project
environmental & sustainability requirements.

0 Set a personal example in day-to-day duties by following EHS rules and at the same time
consider EHS matters as equal to cost, quality and productivity.

- Attend EHS meetings, training as per the program set by EHS department.

h) Quality Assurance Manager

0 Provide necessary guidelines to EHS Manager with respect to system procedure


framework complying ISO 9001 and other relevant standards.

0 Highlight quality issues that can have a potential safety risk to employees and advise
corrective actions.

- Advise of change in management strategies or standards that may a potential impact or I


variability in EHS implementation.

0 To set a standardized document control and review procedure for the cluster.

0 Ensure Quality Team compliance with the requirements of this Project EHS Management
Plan & the objectives.

0 Review method statements with quality view point and ensure compliance in with the
Company and customer requirement.

0 Ensure implementation of contract quality requirements in design, procurement.


construction and commissioning activities in coordination with relevant functions to
minimize any adverse impact of non—conforming product/service on health, safety &
environment during construction /future users / maintenance workers during operations.

0 Ensure Quality Team compliance with the requirements of this Project EHS Plan & the
objectives.

Environmental Management and Sustainability Page |23


Q LARSEN 8' TOUBRO

i) Planning Manager

- Responsible to include E & 8 requirements during planning of each site activity schedules.

0 Ensure engineering controls are envisaged with respect to financial, resource allocation,
time allocation for various tasks during the planning stage.

0 Ensure critical E & S requirement as per the corporate objectives, project objectives and
standards are considered for deployment of plant / equipment, human resource allocation
or commencement of site activities.

0 Understand and include E & S training requirements, certification needs whilst formulating
planning schedule of each site task.

j) P & M Manager

0 Demonstrate commitment consistently by personal participation in EHS activities.

0 Responsible to ensure that all plant, machinery and equipment either hired or owned by
the company are performing legal standards including that of necessary inspection / test
certifications.

0 Ensure that no defective plant, equipment is deployed for use at any location under the
control of the Company.

0 Ensure all plants; equipment and machinery comply with emission standards of Mauritius
and provision of all the necessary pollution control measures.

0 Ensure Operators and drivers are aware of pollution control measures and sustainability
requirements.

0 Ensure plants, machinery and equipment deployed are properly maintained and is
environmentally fit to use.

0 Ensure quality of fuel used and minimize fuel consumption wherever possible.

0 Provide EHS Department with periodic Fuel Consumption details.

0 Coordinate with EHS department and arrange inspection of vehicles, plant, and
equipment, minor equipment as per Company EHSMS requirements.

0 Ensure that all drivers and operators having valid driving license and competency
certificate for operators on the class of vehicle is indented to drivel operate.

Environmental Management and Sustainability Page |24


Q LARSEN ü ÎÛUBRO

- Ensure all lifting equipment and accessories are certified and confirm renewal of
certification as per the regulatory timeframe.

0 Ensure that periodical preventive maintenance is carried out in all plant / equipment as
per set program or inspection protocol.

- Responsible to conduct drivers' forum at regular intervals.

0 Investigate and report all accidents / incidents related to plant / equipment and implement
preventive and corrective actions to avoid recurrence.

o Provide plant related statistics to EHS department for inclusion in periodic reports.

k) EHS Engineerlefficers

o The project EHS Engineers/Officers are responsible for promoting a positive EHS attitude
to achieve the goals of the EHS Policy and Procedures.

0 Are responsible for monitoring and checking the implementation of the plan.

0 Maintain all EHS documents related to the project, update, produce for any references or
audit. and coordinate with the client/ Engineer / authorities.

0 Maintain the EHS records to enable auditing to be carried out. In addition, he will offer
advice and assistance to the project management team for the implementation of the plan.

0 Ensure emergency evacuation routes are identified and maintained, emergency response
teams and equipment are up to date and are functional.

0 Consult with and advise the supervisors and work force on good EHS practices.

0 Advise the project team and assist them to achieve safe operations to approved plan and
procedures.

0 In addition, to ensure that L&T fulfil the requirements of Client/Engineer Safety


Management System.

0 Report incidents; assist in investigation; discuss learning with employees; monitor


implementation and effectiveness of actions to prevent recurrence.

0 Conduct induction / training to site staff / workers / Sub-contractors / visitors.

o Carry out various EHS inspections as quoted in this plan.

- Empowered to stop any activity that is unsafe.

Environmental Management and Sustainability


@ LARSEN G TOUBRO

0 Ensure implementation of requirements and monitoring programs of the DCEMP and


report to the EHS Manager/ Environmental Manager.

0 Check and ensure that the workforce is given adequate training, information and
instruction to competently perform work in a safe and controlled manner.

0 Investigate EHS incidents and communicate the investigation results and proposed
corrective action to the EHS Manager

0 Monitor all staff and subcontractors on site for compliance to EHS requirements and
Iegislation

0 Attend EHS meetings to contribute to a safe and healthy working environment

0 Stop any unsafe activity, which is not compliant with EHS Iegislation, or project EHS
requirements and rectify non-compliance EHS conditions promptly on site.

I) Site Engineers

The Site Engineers / Supervisors are responsible for direct implementation of the DCEMP and
shall be familiar with its requirements.

0 They shall be familiar with all E & S requirements relating to the work being carried out
under their supervision.

0 Make sure that their subordinates receive clear safety instructions relating to the work that
they are carrying out.

o Make sure the workplace is maintained in a safe and tidy condition.

o They shall assist in giving toolbox talks.

0 They shall take prompt action to rectify conditions causing environmental impacts.

0 They shall give full co—operation to the EHS Staff and comply with his recommendations.

o They shall ensure that all necessary control measures are implemented.

0 Make sure that all site personnel under his control are provided with and wear the
necessary Personnel Protective Equipment (PPE).

- Make sure that all method statement, risk assessments and environmental instructions for
the activities are received, communicated to workforce and complied at site.

Environmental Management and Sustainability Page |26


Q LARSEN a rouano

a They shall carry out regular inspections of the workplace.

- They shall be familiar with all Emergencies and report all EHS incidents to line Managers
and EHS team.

0 They shall promote E & S awareness through leading by example.

0 They shall ensure that all new operatives under their control have received induction
training before commencing work.

0 Make sure that all plant/ machinery have valid certificates and operators are competent
to do their job.

0 They will ensure all the activities, plant, machinery and equipment under their control will
not cause pollution to any environmental components beyond the Mauritius standards and
all the mitigation measures are well implemented at site

m) Store Manager] Store Keeper

0 Ensure that the stores layout provided, meets the needs of the project.

0 Monitoring receipt of materials, especially potentially dangerous ones. Ensure correct


storage is provided / utilized.

0 Ensure all Personnel Safety Equipment stocked l issued is within the safe working life
period.

0 Ensure that power tools and equipment's are in safe condition when issued to site.

0 Inspect and repair any suspect item prior to replacing in stock.

- Ensure applicable legal requirements are met within the stores management.

0 Ensure all hazardous materials and chemicals received in the project are accompanied by
material safety data sheet and stored, handled and disposed of accordingly.

- Ensure labours handling hazardous materials and chemicals are aware of safety
instructions and are wearing appropriate PPE.

0 Issue only good condition tools and tackles to the site.

0 Ensure valid certificate for the material issued wherever applicable.

o To maintain issue register for issue of Personnel safety equipment.

Environmental Management and Sustainability Page |27


I

G?
Q LARSEN G TOUDRO

n) Workmen- All category

0 Use all items and equipment provided by their employer correctly in accordance to
instructions received.

0 Not to act in a reckless and / or careless way.

0 Every person working in the project has a statutory duty to take reasonable care for
environment and safety and others are not affected by their actions or omissions' at work.

0 Empowered to intervene and stop unsafe works.

0 Ensure correct use and maintenance of personal protective equipment provided.

0 Report all near-miss cases, incidents, accident to EHS Officer, Supervisor and Foreman.

0 Understand safe use of hazardous chemicals and ensure that right PPE are worn during
chemical handling.

0 Maintain good housekeeping in the workplace and ensure access / egress are
unobstructed always.

0 Understand emergency response procedures and follow the same during emergencies.

- Safeguard safety protective equipment during any task and report deficiencies to the
supervisor / EHS staff.

0 Be away from unauthorized areas and refrain from using unauthorized plant / equipment.

0 Be in possession of valid driving license, certifications as applicable for the task to be


performed.

0 Ask questions when in doubt.


LLLLLLL

o All personnel are encouraged to make suggestions to improve health and safety to their
supervisor and the EHS staff.
\—J

o Empowered to stop working when not safe to do it.

o) Subcontractors

Any sub—contractors hired directly or indirectly by L&T to carry out project, related tasks will
be fully knowledgeable of the requirements of DCEMP.
LLL.‘

Environmental Management and Sustainability Page |28


l
I—J
L—J
i
l‘
_____\_____E
© <9 LARSEN G TOUBRO

Sub-contractors will report any environmental


non-conformance and incident to EHS
Manager. Subcontractors are expected to demonstrate a proactive behaviour towards

L“
environmental protection and compliance with the applicable environmental requirements.

For all Sub—Contractors, apart from the Contractual obligations, the following specific
responsibilities are to be complied on this Project.

Ensure that suitable, site specific EHS Plan is prepared and approved by the main
I;
contractor/ Engineer or to fully comply with L&T Project EHS Plan.
it
The plan and procedures shall be communicated to all relevant parties prior to start of
construction. Make sure the EHS Plan is implemented and kept update as the project
ü
progresses.

Sign the EHS agreement with L&T.


un“
Make sure competent supervisor/ safety staffs/ first aider/ male nurse/ tire warden/ fire
watch are present at site during operation at site. q;

Make sure that all activity will have an approved method statement and risk assessment
before starting the activity and it is communicated to all those involved in the activity and
risk mitigating measures are adopted on the job.

Respective EHS Staff shall coordinate with L&T EHS Department on day—to-day activities
at site. He shall attend the site weekly / monthly EHS meeting with L&T or the Engineer
as required.

Make sure all staff / operatives attend the general induction given by L&T. In addition, they
will receive information, instruction and training on EHS matters required for the task.

Provide adequate welfare facility to operatives such as rest areas, toilet, sufficient cool
drinking water, first aid facility ...etc.

Permit shall be obtained from L&T before closing / diverting any roads as a part of
construction and provide appropriate traffic signs / flag men as advised by L&T. I
Regular EHS Statistics report shall be submitted to L&T.
I
I
Follow L&T’s instruction for waste segregation, disposal of waste ...etc.

Make sure all plant and machinery, before brought to the site, will have valid registration

I
certificate, third party inspection certificate and the operator is competent with valid
License and third party competency certificate in hand.

I
Environmental Management and Sustainability ;’.i._e"t' [29 I
T]

f:
Q LARSEN a TOUBRO

0 Ensure the site rules are displayed at conspicuous locations in the work area and
effectively communicated to all personnel in the Project.

0 Ensure site operatives are given daily toolbox talk by supervisors prior to commencement
of shift.

0 Ensure that accidents, incidents near misses are immediately reported at earliest.

- Ensure hazardous substances are stored as per the MSDS.

0 Obtain permit to work from L&T for all high risk activities such as hot work, confined space
entry, excavation...etc. before starting the activity.

0 Responsible for submitting all the applicable EHS reports to Project Site office.

2.2.2 EHS Organization Chart for the Project

For better management and implementation of EMS, experienced EHS professionals will be
appointed. EHS Head will lead the team with handholding support from Environmental Manager,
Sustainability Manager and Safety Manager deployed at site.

All three managers will operationally directly report to the EHS head who then directly reports to
project director. The organizational chart for EHS management team is given below:
LLLLLLL

Environmental Management and Sustainability Page |30


\__.
Figure 9: Organization Chart for Environmental Management of Project

Project IManager

For Each Section


Environmental Sustainabilrty‘
Manager Manager

WHS/EHS Officer
Steward Day
Steward Night

First Aider Day


First Aider Night

2.2.3 Documentation

The DCEMP (Design & Construction Environmental Management Plan) will be documented as
follows:

0 DCEMP. monitoring data, training records, audit reports will be maintained at the site EHS
office so that they are identifiable and readily available for inspection at any time during
the project construction phase.

0 All records will be kept with the EHS Manager for a minimum period of project duration
from the monitoring date.

0 Copies of the DCEMP should be made available for reference at appropriate locations
within the construction site. All documents should be easily accessible for reference.

Environmental Management and Sustainability Page |31


Ç”
© Q LARSEN G YOUBRO

o The DCEMP has been based on project description available at the time it was prepared.
However, there may be changes after the award of the project. All changes! amendments
will be submitted for the Engineers review.

0 The current DCEMP will be the standalone document addressing the environmental
requirements of the project.

It is to be noted, it is the responsibility of L&T to ensure the proper implementation of the various
control measures outlined in the DCEMP for the duration of the construction activities associated
with the present project.

2.2.4 Document Review and Updates

Typically, it is required to review and update the DCEMP periodically throughout the construction
activities/ prior to undertaking any new construction activity to ensure all impacts to the
environment are minimized. The implementation of environmental compliance will be assessed
during formal audits conducted by the L&T site EHS Manager/ Environmental Manager to ensure
adherence to and the effectiveness of the DCEMP. In addition, through regular project meetings,
where environmental issues and environmental performance will be discussed, it will be
discussed whether there are effective tools to check that the control methods and other
procedures provided by the DCEMP are ample to control or mitigate the environmental impacts
related to the project.
The DCEMP will be a live document. Procedures will be in place for the periodic review of the
DCEMP to ensure that the plan's contents remain applicable and effective. These reviews will
ensure that if changes in Project activities occur and the plan's contents or requirements will need
to be altered, the DCEMP will remain updated to reflect these changes. In order to achieve this:

0 The EHS Manager/ Environmental Manager will review and update the DCEMP as
construction progresses;

o The DCEMP will be reviewed and revised as and when required basis;

0 Environmental Manager will carry out regular inspections and audits. Additionally,
Environmental Manager or competent / trained Environmental personnel will conduct
inspection as per the EHS Inspection Checklist or an applicable observation form where
specific environmental issue is monitored.

0 The Environmental Manager or trained Environmental officers will conduct the inspection
as per Sample Environmental Inspection Checklist or an applicable L&T EHS inspection
form. The results of the inspections should be recorded together with the relevant action
items possibly identified as necessary during the inspections. The close out of each action
item should also be recorded.

o A periodic environmental walkthrough will be conducted with the participation of


Construction manager/ EHS staff.

Environmental Management and Sustainability Page |32


® Qunstna mum L

0 Senior Management will review the DCEMP along with the associated plans during the
'Management review' meetings to ensure it is a 'live' document and that its contents are
correct and have been appropriately modified as circumstances dictate as and when
required.
la
Any changes or updates to the DCEMP will be notified to the Mauritius Light Rapid Transit of I "-3
Government of Mauritius / Construction Management Agency / Engineer. The revised DCEMP
will be submitted to the Engineer for review and approval. I ‘

2.2.5 Communication

L&T will encourage internal and external communication to ensure effective implementation of
the DCEMP. Records related to environmental internal and external communication will be
appropriately maintained by the EHS Manager and made available for inspection as required.
l
|
2.2.5.1 Internal Communication

For the implementation of DCEMP and to achieve the desired project environmental targets,

I
internal communication and regular meetings form the integral part of the DCEMP. Environmental I
management and performance will be a mandatory agenda item in the regular project
management meetings.

The L&T Group and project EHS Policy will be communicated to all employees and
subcontractors and will be prominently displayed at the work site and offices. Other relevant I
I
I
environmental documents and information will be communicated to the appropriate
departments/individuals through various modes of communication such as: l

a Environmental induction training and regular toolbox meetings at the site including
DCEMP implementation as an agenda item; I
0 Posting relevant environmental information on notice boards at the site office including:
|
> Environmental incident response procedures;

> Site environmental and safety best practices;


l
> Environmental information campaign posters i.e. waste management, reuse option.
effects of smoking, etc.;
I
0 Locations of all environmental procedures (i.e. DCEMP, environmental reports. minutes
of EHS meetings, etc.) so there could be easily obtained by all personnel and during
audits;

Environmental Management and Sustainability .‘3‘ag [33 I


a}
6 LARSEN a TOUBRO

{a
I

Weekly Project EHS meetings and regular EHS meetings on site for relevant staff
including representatives of the environmental monitoring teams; and

Employees and subcontractors will be encouraged to provide feedback on the DCEMP and report
any environmental non-conformance and incident to senior management through:

Direct communication with the EHS Manager (face-to-face, phone or email);

Regular Project EHS meetings;

Site briefings;

Employee suggestion; and

Incident / non-conformance form.

2.2.5.2 External Communication


‘ÎÉËE E EÎÆ

The project management team throughout the project implementation will maintain external
communications with the project proponent / competent authority.

All inquiries, complaints and other communications (received by mail, fax, telephone or in person)
from external parties (e.g. Regulatory Agencies, neighbors, clients, suppliers, subcontractors,
etc.) in relation with environmental issues will be directed to the EHS Manager for appropriate
response. The EHS Manager will decide, with the assistance of the Project Director, and / or if
required the Legal, Human Resources or any other involved Department, on the most appropriate
CE?

mode of external communication to address the inquiry, including but not limited to:

Regulatory filings (permit applications and reports);

Media;

Information discussions;

Written instructions;

Presentations;

Discussions during EHS committee meeting.

For pertinent environmental matters, such as introduction of new or increased environmental


impacts or new environmental regulation, L&T will proactively consult with the relevant external
parties such as Regulatory Agencies, Construction Management Agency / Resident Engineer,
Client and other affected L&T through arrangement of meetings, email exchange, and / or
telephone conversation in order to address the issues.

This will include:

Environmental Management and Sustainability Page |34


62-) LARSEN a rouano

o Submitting environmental audit reports prepared by external auditors to Mauritius Light


Rapid Transit of Government of Mauritius, including observations and recommendations
of the areas of improvement;

0 Regular liaison with Mauritius Light Rapid Transit on environmental issues and
performance;

o Communication with external auditors for results of monitoring Program;

- Communication with project engineers and consultant; and

o All communication to regulatory bodies should be through project proponent.

2.2.5.3 Addressing Complaints.

For the implementation of the DCEMP and to achieve the desired project environmental targets,
coordination with external entities and addressing complaints on the construction operations form
the integral part of the DCEMP.
Table 2: Typical Complaint Record

Number and Details of Details

Internal and external complaints relating to the environmental performance of the project will be
directed to the EHS Managers who will coordinate the response with the Project Manager. Actions
to address complaints will be initiated within 48 hours and a Complaints Register will be
maintained on site.

Liaison with Ministry of Social Security, National Solidarity, and Environment and
Sustainable Development

The following figure shows the lines of communication for the project concerning environmental
matters:

Environmental Management and Sustainability Page |35


Ê)
Q LARSEN 8: TOUBRO

Figure 10: Lines of Communication

Ministry of Social Security,


National Solidarity, and
Environment and
Sustainable Development

Mauritius Light
Rapid Transit of
Government of
Mauritius

L&T will notify Construction Management Agency / Engineer and Mauritius Light Rapid Transit of
Government of Mauritius, which in turn will notify Ministry of Social Security, National Solidarity,
and Environment and Sustainable Development, when DCEMP activities change or where
DCEMP controls need to be modified to become more effective or specific for the site.
Responsibility for acting on any complaints will ultimately be with L&T.
C C C C CE ËE Î

Environmental Management and Sustainability Page |36


@ G LARSEN & TOUDRO
""4
3 DESIGN & CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (DCEMP)

i-
3.1 Introduction

Ë.lu
Design & Construction Environmental Management Plan sets out in detail how L&T proposes to
manage and minimize the environmental and social impacts of its activities throughout the
construction period and comply with all Mauritius Environmental Laws & Codes as applicable for

t
construction activity.


A Design & Construction Environment Management Plan (DCEMP) incorporating the proposed
environment protection measures during Design & Construction stage will be submitted to the
project authorities and the same will be the part of the EHS requirements. The plan will be
reviewed at regular intervals.

The Design & Construction Environment Management Plan (DCEMP) is developed keeping in
view contract requirement, legal requirement and guidance from internationally adopted good
practices and guidelines.

During the execution of the project, the Project Manager, in conjunction with the Project Team,

=_=-_;-
including Project EHS-Head, shall continuously ensure the following are considered:

The project team identifies all environmental aspects affecting the environmental performance
jointly and control measures are suggested to minimize the adverse impacts.

The Project Manager ensures that adequate resources are allocated to the EHS team for effective
implementation of environment management system. Environmental Manager will ensure that all
activities related to environment and for monitoring the performance are documented and records
are maintained.

Environmental Aspect and impact register will be prepared and maintained for the project. If a
serious accident occurs and/or any significant changes occur that may cause a measurable
impact on environment, then a review of the assessment shall be undertaken.

3.2 Project Environmental Objectives & Targets

Environmental Management Plan enumerates the measures for achieving effective and efficient
compliance to the conditions of contract on environmental. The environmental Plan will include
an outline of the procedures and regulations to be followed for ensuring compliance as required.

Environment plan is about knowing the aspect and implementing measures to control it
beforehand. Impact Assessment Matrix will be prepared for the procedures for Works where in
Type of Impact, Impact Explanation, Mitigation Measures and Mitigation Measurement will be
identified.
H_ _ -_ —_—_

Environmental Management and Sustainability Page |37


@‘fi Q mass” as rouuo

Objectives for Mauritius Metro Express Project:

To eliminate or minimize the unwanted impacts of hazards and risks to the workforce,
members of the public, stakeholders & the environment who may be exposed to the
undertakings associated with the Mauritius Metro Express Project.

To establish and maintain an effective, robust OHS&E Management system that enables
registration to the international OHSAS 1800122007 & ISO 14001.2015.

To actively contribute to our employees and Sub-contractors development through


support, encouragement and transfer of knowledge and skills.

To simplify the Aspect-Impact concept, to ensure a sensible approach to environmental


management and simplify hazard awareness training through adoption of the ALARP (As
low as reasonably practicable) principles.

3.3 Legal and Other Requirements

All legal and other requirements as applicable for Environmental Management of the project has
been identified by the Environmental Manager. He will coordinate with respective Govt. authorities
as and when required for better understanding the requirements of law and obtain any other
F

information useful for improvement of Environmental Management System of the project. A list of
J

Environmental and other legislations as identified in the initial stage of the project is given below
in Table: 3. L&T will abide by these laws whenever any of the project activity as covered in the
F:

legal and regulatory framework falls in the project scope.


J

Environmental Manager shall review the legal requirements and update the legal register
F—
..

accordingly.
LLLL.

Table 3: Details of Regulatory Framework for Environmental Management of the Project

m Description or Title of Act


1 Environment Protection Act 2002
L—J
ti

2 Environment Protection (Declaration of Environmental Laws) Regulations 2005


The Environment Protection (Amendment of Schedule) Regulations 2006, 2008,
2009 3
Je

4 Environment Protection Plastic Car Bas Re ulations 2004


5 Environment Protection (Banning of Plastic Banners) Regulations 2008
Environment Protection (Standards for Effluent Discharge) (Amendment) Regulations
.5Ii

2004
Environment Protection (Effluent Discharge Permit) Regulations 2003 & subsequent
amendments 2004
Environment Protection (Collection, Storage, Treatment, Use and Disposal of Waste
g

Oil) Re ulations 2006


_{_Æ'

The Environment Protection (Control of Noise) Regulations 2008


ÜÎÈÜFËFËFË

Environment Protection (Standards for effluent discharge into the ocean) Regulations
ii

2003
_\
j

Environment Protection (Drinking Water Standards) Regulations 1996


\n—SHHHH
‘\
du

Environmental Management and Sustainability Page |38


\—‘

_

\—i
à

î.
LARSEN I TOUDRO M

Description or Title of Act


2 Environment Protection (Environmental Standards for Noise) Regulations 1997
__\

Environment Protection (Environmental Standards for Noise) (Amendment)


13
Re ulations 2003
Environment Protection (Standards for Air) 1998
A

Environment Protection (Standards for hazardous wastes) Regulations 2001


0'!
.44

6 Central Water Authori Act 1970


——L

Central Water Authori (Designation of Catchment Areas) Regulations 1986


\l

Central Water Authority (Water Supply for Domestic Purposes) Regulations 1992
oo

Central Water Authority (Water Supply for Non-Domestic Purposes) Regulations


(D

1992
_L._\_\

20 Ground Water Regulations 1973


21 Waste Water Manaement Authorit Act 2000
22 The Rivers and Canals Act 1863
23 Rivers and Canals Normal Flow of Rivers Regulations 1941
24 Public Health Act 1925
25 Planning and Development Act 2004
26 National Heritae Fund Act 2003
27 Aapravasi Ghat Heritage Trust Fund Act 2001
28 Wild life ad National Parks Act 1993
29 Animal Welfare Act 2013

30 National Parks and Reserves Regulations 1996

31 Forests and Reserves Act, No 41 Of 1983

32 Maritime Zones Act 2005

33 Fisheries And Marine Resources Act 2008

L&T will seek approvals from concern authority for its project activities as required under these
regulations.

For better management and compliance to these legal requirements, Environmental Manager will
maintain a legal register and review it on quarterly basis or as and when there is any change in
law, regulatory requirements or there is any amendments. The format for maintaining legal
register is mentioned below:

Table 4: Format for Maintaining Legal Register


of

(Yes
pliance

Remarks
Applicable

Frequency
Regulation

Method
Description

Evaluation
Compliance

Status
Com
Responsibil t

Environmental Management and Sustainability


,,,
rem“.
Fr ‘

fl TOUBRO

.
© LARSEN E TOUBRO
PM“
wt

fl's w“

If] Format for maintaining record of approvals and tracing their validity is mentioned below:

Table 5: Format for Maintaining Approvals taken under laws

Permission Validity
taken on Permission
E
it:

A copy of all required permissions as taken under the law or contract requirement shall be
maintained at site office also. The conditions mentioned in the approvals and procedure for
compliance shall be briefed to the staffs by the environmental manager for necessary and timely
compliance.
Æ

3.4 Environmental Impacts Management

Environmental aspects which can potentially be impacted by construction activities include air
quality, soil and groundwater contamination, biodiversity, noise, traffic and waste management
including wastewater treatment and discharge.

3.4.1 Air Quality Management


LLLL.

3.4.1.1 Approach & Methodology:


:hese
Air pollution is the major impact caused by construction activities at site. The principal concerns
relating to air quality are emissions from construction activities in the form of dust, fumes and
I

smoke. The most prominent cause for air pollution at construction site are:
er will
Exhaust emissions from operation of DG sets
0.0o

ge in
Vehicular emissions from operation of construction vehicles and machineries
0.0
o

legal
1

Tree cutting
0.0o

Volatile organic compounds (VOC) emissions from paints;


.9.0

Dust emissions from:


‘o.0
Ô
l
\

o Site clearing activities


- Earthwork & formation work
o Movement of transportation vehicles at site
4
t

o Handling (Loading and unloading, Storage) & Transportation of


construction material to site
o Crusher and batchmix operations
à

o Stockpiling and storage of construction material


. Wind blow
- Demolition of structures and building
ù,
l
H
.——.‘

V
E

Environmental Management and Sustainability


U

I“

\.—‘
i

@ Q LARSEN G TOUBRO

L&T through its subcontractors will plan, locate and control work-site activities that have the
potential to generate dust or smoke so that nearby sensitive receptors are not adversely affected.
Sensitive receptors include but not limited to:
f Hospitals, schools. daycare facilities, elderly housing etc. These are areas where the
occupants are more susceptible to the adverse effects of exposure to polluted
environment.
/ Ecologically sensitive receptors like Wildlife sanctuaries, National Park, biosphere
reserves, or any other sites of archaeological and ecological importance.

3.4.1.2 Likely Impacts:

Air quality at project site and surrounding area is likely to get affected by site activities and is the
major source of pollution. The major possible impacts are:

4- Increase in suspended particles including PMw concentration due to dust emissions


caused by vehicular movement, crusher and batching plant operations, demolition
activities. loading and unloading & other activities at site. This may create nuisance and
health issues to people in nearby habitation areas.
Increase in SOx, NOx and Carbon dioxide levels due to vehicular emissions, operation of
1‘-

DG sets and emission from operation of Batchmix plant and other machineries at site. This
may increase the gaseous concentration in atmosphere.
Dust deposition on plant leaves can cause problem in photosynthesis ad affect plant
4-

growth, this may also damage the crop production and final yield.
Habitation in nearby areas may get affected due to dust generated at site
Dust deposition on machineries can also affect the performance of the machine,
f-f—

equipment.
Tree cutting and other vegetation clearance activities shall take place, which will affect the
f-

ambient air quality in the surrounding areas.


Activities like welding. gas cutting, and use of VOC paints will generate fumes that if
f-

inhaled, can cause serious health issues and breathing system disorders.
Odour generated from chemicals, sewage from labor colony, wastewater collection tanks,
f—

solid waste etc. will create nuisance to workmen and may also affect the health of the
individual, if exposed for longer duration.

3.4.1.3 Mitigation Measures:

Air pollution at construction site cannot be controlled completely, however, control measures shall
be implemented which can reduce the emissions and minimise the impact on environment. L&T
shall identify the sources of air pollution and implement necessary control measures to minimise
the pollution at site. The suggested mitigation measures include:
/ Water sprinkling shall be done on the moving path of transport and construction
vehicles at site as and when required.
f Loose material shall be provided with cover while transportation in order to prevent
dust generation due to wind blow.
Vehicle speed shall be limited to 20 km/hr or less to minimize dust emissions
'\

x’ Burning of waste shall be prohibited; it will be disposed in proper way to the waste
management authority.

Environmental Management and Sustainability


V
Q LARSEN & TOUBRO

V Waste generated at site shall be temporarily stored at site and shall be handed
over to licensed vendors for further treatment & disposal or shall be disposed off
in govt. approved landfill or dumping site.
V Tree plantation shall be done at site and shall be maintained regularly
V Construction machinery and equipment shall be regularly maintained to achieve
higher fuel efficiency resulting in lower emissions.
V The DG sets provided at labour camps and site shall be modern 06s with in-built
acoustic enclosures.
V Low sulphur Diesel shall be used in DG sets and construction machinery.
V All such approvals/consents as applicable to project activities shall be obtained
and consent condition shall be complied.
V Crusher plants, if required, shall be installed at a minimum distance of 500 m from
inhabitations & other sensitive receptor.
V Sewage and other waste generated from site office, labour colony and other
activities shall be temporarily stored at site in proper way and later shall be
disposed off to a designated site or to an approved vendor.
V Paints containing low VOC shall be used.

Air pollution is subject to type and nature of construction activities, few activities do not cause any
air pollution whereas other causes less or high levels of air pollution. Therefore, all such activities
shall be identified with regular coordination with planning and execution team. The priority shall
be given to locations where construction activities are taking place nearby any habitation areas,
standing crops and places of public interest and socially sensitive areas like hospitals, schools
etc, as in these areas, the air pollution is likely to cause more impacts compared to others.

3.4.2 Water and Wastewater Management

3.4.2.1 Approach & Methodology:

Water is the key requirement for all construction projects. It is required in almost all activities at
site both in construction work as well as for human consumption. In addition, huge quantum of
water is required which can have an impact on the competitive users in nearby areas.

Proper planning is required for effective use and management of construction water in order to
prevent:
Wastage of water
LLLLLLL

Pollution of water sources, channels


Ground water contamination
Degradation of water quality of rivers and streams near construction of Cross Drainage
VVVV
H

Structures
I

> Impact on aquatic ecology if any discharge is done

Different activities at construction sites can result in water pollution, either directly or indirectly.
l

Sometimes the impact is visible but many times, it is not, but it can cause severe impact if exposed
for longer time. The magnitude of impact can be determined based on the extent of pollution a
l

particular activity can cause.


l.

Environmental Management and Sustainability Page [42


l
© Q LARSEN a rouano

Necessary consents/approvals, as applicable shall be taken from competent authorities for


abstraction of water required for the project. All such consents shall be submitted to the employer.

General awareness program shall be developed and delivered to all staff, workmen, subcontractor
and their workers at site. Training modules shall be developed which will cover:

General awareness on water environment


Water and waste water management
Water pollution prevention & control
Individuals role and responsibilities
Action plan in case of water pollution at site
VVVVV

L&T shall develop inspection checklist for routine inspection of water use and both water and
wastewater management at site. Environmental Manager at site shall be responsible for
implementing best management practices at each site to prevent or minimize any adverse
impacts on water environment in and around project site.

As a part of Environmental monitoring programme, Water quality monitoring shall be carried out.
The results of monitoring shall be analysed and action plan shall be developed accordingly to
prevent any degradation of water quality of nearby water bodies, streams, canals etc.

3.4.2.2 L_g_—eal
Framework:

L&T shall comply with the requirement of all applicable rules applicable for water use, wastewater
disposal, its quality etc as given below:

Central Water Authority (Designation of Catchment Areas) Regulations 1986


Central Water Authority (Water Supply for Domestic Purposes) Regulations 1992
Central Water Authority (Water Supply for Non-Domestic Purposes) Regulations 1992
Central Water Authority Act 1971 and subsequent amendments
Ground Water Act 1970
Ground Water Regulations 1973
Guidelines for lnland Surface Water Quality
Waste Water Management Authority Act 2000 & subsequent amendments
Wastewater Management Authority Act 2000 & subsequent amendments
Environment Protection (Standards for Effluent Discharge) Regulations 2003
Environment Protection (Standards for effluent discharge into the ocean) Regulations
\ \ \ \ '\ \

2003.

All permissions (if applicable) to projects shall be taken which in general includes:
0 Permission for abstraction of ground water from Central Water Authority
0 Permissions for disposal of waste water and effluent from Waste Water
Management Authority

3.4.2.3 _y_LLikellmacts

Following are the impacts on water quality likely to be caused during construction phase of the
project:

Environmental Management and Sustainability P a 51—: |43


Q LARSEN & TOUBRO

Water pollution if municipal sewage is discharged in open drain, channel water body
V Disposal of Municipal Solid Waste in water channels, drains (both Dry and Wet) etc
Contamination of soil and ground water due to:
VV

- Oil spillage during fuelling /refuelling and handling of chemicals/oils etc.


- Discharge of liquid effluent and waste water in open land/drain
> Water pollution due to siltation from:
- Abstracting construction material from beds of rivers, streams, lakes
o Due to construction of embankments near water bodies and cross drainage
structures
- Stockpile, construction material storage locations etc
- Run-off generated at site during rain
i—

> Degradation in water quality or contamination of water due to erosion generated from:
- Uneven slopes and undulations at site
o Cut n fill activities at site
- Stockpiles and construction material storage yard
o Run-off during rain
> Water pollution due to Oil spillage from:
- Leakage of oil from construction machineries
o Oil spillage at equipment yard and diesel and spent oil storage yard
- Handling of diesel, oil and waste oil
. I

- Parking areas
- Fuelling of machineries and vehicles
LLLLL

- Equipment washing

3.4.2.4 M_g_______—itiation
and Pollution Prevention & Control Measures

L&T shall identify all such activities that can lead to water pollution and degradation of water
quality. Both preventive & mitigation measures shall be adopted at each construction site to
prevent the water pollution and reduce the impacts on water quality. These include:
1i

a) Siltation Control

/ Identification of all such water bodies, channels, streams which are likely to get impacted
due to proposed construction

f Silt generated from construction site shall not be allowed to enter any drains, channels or
any water body present near the project site.
ll
t

‘/ During the construction period, deposited silt in drainage channels and outlet points within
the project influence area shall be removed and cleared.
—u —qfi—IF-lr= !i=-P?‘5F—|

\\

f The storing of construction material and stockpiling shall be done away from any water
body, which is likely to get impacted.

\/ Flow level assessment including High Flood Level (HFL) and other information shall be
l
l.

obtained and analysed before starting any construction of Cross Drainage Structures.
/ Sand bags and other silt & sediment control measures shall be provided during
"A

construction of Cross drainage structures or while working across water channels.


y
I

AA;
_
——i

Environmental Management and Sustainability Page |44


._.__..
—-—
_—
@ LAISEN J TOUDRO

Æ.
b) Sediment & Erosion Control

Erosion is a common problem at construction site. Erosion is caused by both human


activities and natural. However, implementing good practices at site shall control the
erosion problem at site. L&T at every stage of construction shall ensure that no such
erosion problems arise at any construction site. L&T shall ensure that:
J Natural slope of the site shall be maintained and if altered, temporary drains shall be
created to carry the run-off.
J The run-off generated shall be collected and sediments shall be allowed to settle
before discharging into natural drains.

J Site fencing and other erosion control measures shall be provided at site to prevent
soil erosion.

J All slopes shall be fully stabilized before leaving the construction site

J After dumping of soil for formation work, compaction shall be done at the earliest to
prevent erosion due to air.

J Material shall be stockpiled at a minimum distance of 50 m from the edge of the


streams/ water body.

J if required, temporary trenches shall be constructed around material stacking areas


to prevent runoff during heavy rain.

J All nearby natural drainage system shall be kept clean in order to prevent any water
stagnation of flooding which will minimise the possibility of surface run—off to enter the

S";-
water channel.

0) W____Lastewater
Disosal

Wastewater is generated from many activities at construction site. The most common of
which is municipal waste water from site offices, staff colony, labor camps as well as from
canteen. Any discharge of wastewater in natural drains, water channels or any other water
body may lead to pollution of surface water and lead to contamination of ground water, in
long term. L&T shall prepare the management plan and implement it at site for effective
management of wastewater and municipal sewage generated at site. The measures
adopted by L&T to prevent any water pollution include:

J No wastewater shall be discharged in any water channel, streams, drains and any
other water courses & Ocean,

J The wastewater generated from staff colony, labor camp, canteen shall be collected
in soak pits provided at site and stored temporarily.

J The wastewater collected in soak pits shall be disposed off through govt. approved
vendors at regular intervals or as required.

J Sufficient toilets and washroom facilities shall be provided to site staff, engineers and
construction workers at site and shall be regularly maintained.

If there is no other alternative available for discharge of liquid effluent then it will be discharged in
accordance with requirements of:

Environmental Management and Sustainability Page |45


m mn—m m nm _-—_Œ_
a?)
Q LARSEN I TOUIRO
j"îî

Environment Protection (Standards for effluent discharge into the ocean) Regulations
2003 & amendments
Environment Protection (Standards for Effluent Discharge) Regulations 2003 as
.—

amended
u

Environment Protection (Effluent Discharge Permit) Regulations 2003 as amended


V

Under any circumstances. if the effluent is to be discharged into river, following water quality shall
-

be maintained at all times:


l

Table 6: Water Quality of rivers in vicinity of project


r

Water Quality
'

Objectives River Seche Caudan Waterfront Grand R'Ver North


West

Turbidit NTU <20 <20

Dissolved Oxygen 6 _12


m o /l
Total
m o /l
Total Nitro en M II
Oils and rease
Litter/construction
debri's
Temperature - C Instream measure | nstream measure Instream measure
compared with compared with compared with
seasonal seasonal seasonal
preconstruction preconstruction preconstruction
results results results
Salinity Electrical Instream measure Instream measure Instream measure
conductivity us/cm compared with compared with compared with
o reconstruction 0 reconstruction reconstruction
LJ‘QL L L L L

If the effluent is to be discharged into ocean, following requirements shall be met:


At a distance less than 300 metres off the reef barrier and at a depth of less than 30 metres
where there is a lagoon
l

At a distance less than 500 metres from the HWM and at a depth of less than 25 metres
til

where there is no lagoon.


The effluent shall not be discharged at any point in the ocean where sea currents will
i

cause effluent to be taken back into the lagoon.


The effluent to be discharged in to ocean shall meet following requirements:

Table 7: Permissible limits for the effluent discharge in oceans


:53

Parameter

oc
-

Environmental Management and Sustainability Page |46


g

——_—

G LARSEN I TOUBRO

am Permissible limits
3 Floatables m
4
LOO Biochemical Ox en Demand 8005 m /l
Chemical Oxygen Demand (COD) mg/I

H
m

H
rm.

à
—(
(Q
—I
_:
mm.
mm.
mm.

01
O
O
O
_\
A

à
O
-(
'1

—l
Z
N

3
o

m
—l

=
.
(N

14
_\

‘âè
À

"C:

O
ugn zoo

.—\
16
_l_.\
CD

17
.3
\l
_\

d) ___g_____tyFuel
Storae Facili

L&T shall be responsible for the design, installation and operation of a dedicated fully
protected fuel storage area to be located in a secure part of the main site compound. Plant
and equipment not able to be refuelled at this facility will be refuelled by the use of a fleet
metal bowsers operated by site staff.

J During the process of refuelling a fuel spillage kit shall be made available in order to
contain any spillage and to prevent contamination of soil & water.

/ The fuel storage facility is to be constructed on an impervious concrete base, in closed


containers/drums. The fuel storage area will be surrounded by a secure impervious
bund providing a containment capacity to retain all stored oil in case of any leakage
or spillage. All associated valves and pipework are to be contained within the bund.

\/ The facility shall be inspected on routine basis. Records shall be maintained as to


fuel usage.

~/ It is recommended that the design of the fuel storage facility incorporate a roofing
structure to prevent rainwater accumulation.

f Dip tray shall be provided below the equipment whenever required in order to contain
any spillage or leakage.

e) R_g__efuellin
Protocol

The following Refuelling Protocol shall be applied to deliveries of fuel and all refuelling
operations.

f Areas used for waste or chemical storage shall be protected in a manner, which also
prevents the spread of contaminants and water pollution via the site drainage and
surface water systems.

Environmental Management and Sustainability Page |47


Q LARSEN G TOUBRO

Oil spill kit and other cleaning measures shall be provided at all fuel storage, refuelling
and vehicle maintenance area.
Training for effective use, safe handling of diesel and other explosives and other
hazardous material including waste/spent oil shall be provided to site staff responsible
for management of these at site.

Proper care shall be taken while transport of fuel and other material from source to
site.

All fuelling & refuelling operation shall be supervised by trained personnel.


L&T will abide by the Environment Protection (Collection, Storage, Treatment, Use
and Disposal of Waste Oil) Regulation 2006, as applicable to the project.

The waste oil and other hazardous waste (if any) shall be temporarily stored at site
as per the standard guidelines and later shall be disposed off through Iicensed
vendors or as per applicable rules.

L&T shall maintain a register of all discharge consents and must be consulted prior
to any activity resulting in discharges to the aquatic environment.

3.4.3 Use of Natural Resource and Materials

The Water, fuel oil, electrical power, sand, coarse and fine aggregates are some of the main
resources that will be used during construction and operational phases. The use of different
resources varies from one activity to another according to the machinery specifications and
LLLL

operational types.

The use, source and consumption rate of different resources during construction should be
"In—l
in;

controlled.

A typical list of the materials required for the construction activities associated with the overall
III-l
ü

duration of the project are presented in table 8. The uses of the resources during construction is
provided in table 9.
i

L&T develops, implements, maintains and update for the duration of the Contract, the
Sustainability Plan for reduction of:
.fl

a) energy consumption and greenhouse emissions, through the development of an energy


consumption and greenhouse emissions strategy,
ü

b) use of materials, through the development of a sustainable material use strategy,

c) water consumption, through the development of a water use strategy.


l\
t.
l
I

Environmental Management and Sustainability Page I48


_\
Q LARSEN G TOUBRO

Table 8: Key Construction material requirement

mum Quantity

00
Structural Steel
Stainless Steel
A

Filter Media 17,696

n Pipe Dia (600-1800 mm) 2,348

n Elastomeric Bearing 17,285

Table 9: Use of Resources during Construction

Preferred
Resources Purpose/Use Source/Su . pl
Potable Water Sanitary and subsistence use by Supply from Central
construction workers at construction camp Water Authority
Sanitary and subsistence use by
construction workers at construction site Water Authorit
Water
the Pro'ect Water Authorit

workin areas Water Authorit


ù Operation of vehicles, plant and Local Licensed Supplier
equipment (Engen)

Electrical Power Concrete Batching plant- Production of 0 Power Supply from


concrete CEB
0 DG set if CEB does not
su o |
Operation of power tools, lighting 0 Power Supply from
requirement CEB
0 DG set if CEB does not
su I |

Sand, coarse and fine Concrete production -over the duration of Locally identified areas
aggregates the Pro‘ect
Ballast for the track Locally identified areas

Environmental Management and Sustainability


Q LARSEN G TOUBRO

3.4.4 Solid Waste Management

3.4.4.1 Objective & Scope

Most of the solid waste quantities are attributed to the waste generated from the site offices and
construction debris. Construction camps shall be established, which also includes installation of
supporting infrastructure and other facilities for the staff as well as workmen camps.

The waste associated with the proposed project include Concrete, Asbestos, Wooden materials,
Waste asphalt, Metal substances, General household from buildings, Pipelines (metal and
plastic), Contaminated soil; and Vegetation from clearing activities, Excess backfill material,
Maintenance waste from equipment; Cardboard and paper waste; Building materials off cuts, etc.;
Packaging material; Hazardous waste like oil, paint cans, welding electrodes; Asphalt from road
laying activities; Asphalt storage empty drums, aggregates from batching plant; Water from
dewatering activities; Wastewater from vehicle washings; and Domestic sewage from site offices
and general rest areas. In general, the solid waste generated at construction site can be classified
into following categories:

1.0. Municipal Solid Waste

2.0. Construction Solid Waste

3.0. Hazardous Waste

4.0. Concrete Waste

5.0. Vegetation & Biomass Waste


6.0. E—Waste

3.4.4.2 Regulatory Framework

L&T shall comply with the requirement of all applicable rules and regulation for effective
management and handling of solid waste generated at site.

The current legal framework in Mauritius for the environmentally sound waste management
comprises the Environment Protection Act (EPA) of 2002, as amended in 2008, and the Local
Government Act (LGA) of 201 1. The following Regulations have been made under the EPA
and the LGA:

The legal framework for implementing the solid waste management plan is given below:
Table 10: Applicable Acts/Rules for SWM

Em Act/Re . ulations L&T Res onsibilities


Environment protection > Waste oil is segregated from, and not
contaminated by, other substances such
(Collection, Storage,
as solvents, pesticides, brake fluid,
Treatment, Use and Disposal
antifreeze, paint thinner, engine
0f WaSte 0|") ReQU'atlonS degreasers and cleaners, water or any
2006 liquid;
> the container used for storing waste oil is
easily accessible to the carrier for the
urose of collection;

Environmental Management and Sustainability Page |50


9 LARSEN a rouano

Act/Re o ulations L&T Res o onsibilities


- > sufficient absorbent materials are readily
available to absorb any waste oil, in case
of an accidental spill; and
>> any container used for storage of waste oil
or sludge is labeled in such manner and
form as may be approved by the enforcing
agency
> Waste oil is handed over to a licensee for
further treatment and disposal
Environment Protection Minimize the generation of a hazardous

'
waste by using the best practicable means
(Standards for hazardous
>> Safely and properly store the hazardous
wastes) Regulations 2001
waste temporarily for its further handover
to a contract carrier for treatment and
disposal.
> Container in which hazardous waste is
stored shall be properly labelled in
accordance with fifth schedule.
Keep a record of same and inventory on
uarterl basis.
Local Government Act Obtain license from the minister, i'f
(Dumping and Waste Carriers) transportation of waste in excess of 50 kg
. is required
Regwat'ons 2003 The transportation of waste shall be proper
v

such that no waste or leachate shall come


out of vehicle
> Affix a plate (60cmx15cm or more) bearing
the word “WASTE” followed by the number
of license. The words should be in red
colour and background should be white.
> Dispose of the waste at a transfer station
or waste disposal site or any other site
a roved b the Minister for that

3.4.4.3 Municipal Solid Waste Management

Municipal Solid waste includes waste generated from human activity and includes biodegradable,
non-biodegradable, inert and recyclable waste. Labor camp and guesthouses for staff are major
source of MSW generation at the construction site. Unplanned practices can lead to serious health
impacts on worker working at site and in the nearby area and can damage the environmental
quality.

MSW disposal and management causes all types of pollution: air, soil, and water. lndiscriminate
dumping of wastes contaminates surface and ground water. In unplanned areas, MSW clogs
drains, creating stagnant water for insect breeding and floods during heavy rain. Uncontrolled
burning of MSW and improper incineration contributes significantly to urban air pollution. Health
and safety issues also arise from improper MSWM. Insect and rodent vectors are attracted to the
waste and can spread diseases such as cholera and dengue fever. Using water polluted by MSW

Environmental Management and Sustainability Page |51


6 LARSEN 3 TOUBRO

for bathing, food, and drinking water can also expose individuals to disease organisms and other
contaminants.

Therefore, it becomes necessary to manage the MSW by adopting adequate practices so that it
can cause no adverse impact on human health and to the surrounding environment.

The major source of waste generation are:

Waste from construction/labor camp

Waste generated from staff colony

Canteen waste

Waste from site offices and site huts


Kitchen and canteen waste
Plastics and Packaging Waste (generated from store yards, workshops, etc.)
Any other activity at site

For proper management and handling of MSW, L&T shall undertake following practices:

J Dustbins shall be provided at labor colony and staff colony for collection of waste.

f Different coloured bins (2 nos.) shall be provided at canteen to carry kitchen waste
including vegetable/food waste and other waste

The waste collected shall be temporarily stored at site for not more than 3 days at site
and shall be disposed off through approved vendors or to a municipality bin or
approved disposal site

Training shall be provided to staff as well as construction workers on health and


hygiene and effective management & handling of solid waste at site.

Regular inspection shall be carried out and records shall be maintained and submitted
to Environmental Manager for review and further course of action.

The typical list of solid wastes generated during the project includes but not limited to the following
waste materials: food waste, steel / metal, general waste, plastic, cardboard / paper, concrete,
etc.

3.4.4.3.1 Solid waste categorization:


Primarily, the solid waste can be classified into two categories, i.e
1. Hazardous Waste: This type of waste are generally toxic, allergic and hazardous for
human health in many ways.
2. Non Hazardous waste: These wastes are generally non-toxic, non-hazardous,
biodegradable, and inert waste.

3.4.4.3.2 Municipal Solid waste composition in Mauritius:


Further, solid wastes can be sub- classified into municipal solid wastes (MSW), industrial non-
hazardous wastes, construction and demolition wastes, health care wastes, hazardous
wastes and sludge. In Mauritius, MSW represents the highest proportion of wastes going to
the landfill and it is in the order of 70%. MSW can be further classified into other fractions such

Environmental Management and Sustainability Page |52


\—
© Q [ARSEN l rot/no

as food wastes, yard wastes, textile, paper, metals, glass, plastics and others as illustrated
below:
L“
Figure 11: MSW Composition in Mauritius I C

I En: " . -‘ «Jans

'4 Yard '\'v'aslcs


l
u Tcm'lc

I Paper l
I Metal

l Class

I Plastics I
I Others

l
3.4.4.3.3 Waste Disposal Sites: l
l
Transfer Stations:
Following are the waste transfer stations as approved by the minster under “Local Government
(Dumping and Waste Carriers) Regulations 2003"

N Transfer
Table 11: Waste Transfer locations in Mauritius

Starting Year of Design capacity Average quantity


l
l
Station Oeration ltons/ da transferred/tons er month

l
2011 350 to 450 10,000
Chaumiere
l
Disosal Site
W—L_aste
1. Mare Chicose Landfill site
The Mare Chicose Landfill is in operation since 1997. Wi'th the construction of Cell 7, the l
total landfill area will be in the region of 48 Ha. An amount of approx. 420,000 tonnes are l
being landfilled annually and the amount of waste Iandfilled to date is about 6 million
tonnes.

The engineered landfill Works at Mare Chicose has been designed for the disposal of
waste in an environmentally safe manner. The essential elements providing these safety
are amongst others (a) suitable composite soil and plastic lining at the bottom of the landfill
and leachate collection and carting away to prevent contamination of the ground water (b)
abstraction of gas from the landfill for destruction of the methane, through flaring and
power generation.
[

Environmental Management and Sustainability Pagé |53 '


r!»-Î.“— Q LARSEN 8 TOUBRO

3.4.4.4 Construction waste

Construction waste is likely to get generated at each site due to construction activities. It
includes waste from excavation, site clearing, demolition, debris and surplus material left
after the construction is over. L&T shall identify the activities that have the potential to
generate waste and work out measures for reducing, reusing and proper disposing of the
generated waste during construction stage. Following Principles shall be adopted by L&T for
effective management of construction waste:

Waste Avoidance/Minimization
The approach to waste avoidance and reduction will aim to minimize the production of waste
materials. The Waste Avoidance (or Reduction) Principles to be adopted are:
When assessing construction options, consideration shall be given to options that
have higher waste reduction than the alternatives (if economical to do so).
When purchasing for the project, consideration shall be given to either reduce or
avoid the generation of waste.
Aim to accurately estimate and order quantities of materials required.

Reuse of Waste:
Every effort will be made to ensure that waste material is seen as a resource and is used,
either on-site within the project or off—site by other persons or vendors. The waste reuse
principles adopted by L&T are:
Identifying materials for a reuse purpose.
Segregated materials at the source of generation to facilitate reuse if economical
and feasible to do so.
Storing, or reusing those items, either on-site or off-site, during the process if
economical and feasible to do so.
Reuse of waste material shall be done only after carrying out specific tests, if found
necessary and ascertaining the quality of waste material used.

Recycling of Waste:
Recycling is a process involving the collection and separation of waste materials, which
are transformed into useable products, either directly or indirectly. L&T shall undertake
following practices:
Erect signage to encourage the reuse and recycling of recovered waste material.
Identify materials for a recycle purpose.
Sorting materials into components to facilitate recycling.
Processing the material components for recycling, either within the project or off-
site if economical to do so.

Removal of Waste:
Waste removal requires the transport and disposal of waste material that cannot be reused
or recycled, either on-site or off-site. The following waste removal principles have been
adopted:
Regular collection / removal of construction waste will be implemented
The finally left waste material either shall be dumped in approved landfill or shall
be sent to licensed vendors for final treatment and disposal.

Environmental Management and Sustainability Page [54


hi
\—
k
Q LARSEN l TOUBRO

j-_ g.
0 Either all waste to be removed for disposal or trucks will transport reuse/recycle
off-site.
0 Local truck routes (preferably passing through less populated areas) will be chosen
for environmental acceptability and to minimize disruption to the residents along
the routes.
- Al trucks carrying loose waste materials shall be covered (if required) to ensure
that no waste is deposited on Public roads.

I'.
0 For disposal of excess cut and unsuitable (non-toxic) material left after
construction, L&T shall identify the location for disposal in consultation with the
community / concerned department or Shall get it disposed off through licenced
vendors
c Any toxic materials shall be disposed in existing landfill sites that comply with
legislative requirements.
0 Education shall be provided to both staff and construction labors on issues related
to management and handling of waste as well as the specific requirement for every
sites.

It shall be ensured that following practices shall be avoided:


o Tipping of waste into stream channels, water bodies, forests and vegetated slopes
0 Non cleaning of waste after day’s work
0 Leaching of waste
0 Littering in construction camps / sites
- Storing waste on private land without consent of the landowner.

3.4.4.5 E- Waste Management

Electronic wastes can cause widespread environmental damage due to the use of toxic
materials in the manufacture of electronic goods. Hazardous materials such as lead, mercury
and hexavalent chromium in one form or the other are present in such wastes. Landfilling of
e-wastes can lead to the leaching of lead into the ground water. These products contain
several rechargeable battery types, all of which contain toxic substances that can contaminate
the environment when burned in incinerators or disposed of in landfills.

The best option for dealing with E wastes is to reduce the volume. In order to manage E-waste
in project, L&T shall:

4—- Reduce: Only use electronic equipment, Computers, Printers etc, which are in good
working condition and the life cycle, is more. This will significantly reduce the generation
of e-waste.

~4- Repair: L&T shall repair provide regular maintenance to all electronic equipment being
used by staff at site.

al— Reuse: after the completion of work at a particular construction site, such equipments,
like Printers, Computers, Scanners etc. shall be shifted to other project site, as per the
requirement.

1L Storage: any such waste generated at site, shall be temporarily stored, either at site or
at TFL and shall be sold to govt. approved licensed e-Waste recyclers for further
management and Disposal.

No such waste shall be illegally dumped or incinerated.

Environmental Management and Sustainability Page |55


L,
G LARSEN & TOUBRO
@/

3.4.4.6 Liquid Waste (Effluent)

The sources of liquid waste for the Project have been identified which include but not limited to
waste water from concrete washout at the concrete batching plant, and sanitary wastewater from
construction workers.

The inappropriate, storage, handling and disposal of liquid waste could deteriorate soil and
groundwater quality. The wastewater from the batching plant could, if not handled properly,
increase soil and groundwater pH and turbidity.
Wastewater generated at site can be classified into following categories:
- Wastewater from washing activities within the concrete batching plant (mixer, truck
deliveries, etc.)
0 Hazardous waste (used oil and lubricants)
0 Sanitary waste — Black and Grey water from construction camps and site office
All liquid effluents generated during the project period shall be collected and stored temporarily in
underground collection tanks and later shall be disposed of in accordance with Environment
Protection (Standards for Effluent Discharge) Regulations 2003.

3.4.4.7 Hazardous Waste

Proper storage and disposal of construction materials and hazardous wastes from the
construction site prevents the discharge of pollutants to storm drains and watercourses. To reduce
potential risks to project personnel, site and the environment requires implementation of best
management practices (BMP) for management & handling of hazardous waste at site.

During construction, L&T shall identify the activity that may result in generation of hazardous
waste. Hazardous waste generated at site shall be handled as per hazardous waste management
and Handling Rules. All measures shall be adopted to prevent any adverse impact on
Environment and to the people at site. The typical hazardous waste likely to be generated at site
are:

4- Oil spills or leakage at site


4— Petroleum products and spent oil from equipment/machinery operation and
maintenance
~4- Hazardous Chemicals such as quick setter, etc

L&T shall undertake all adequate measures for management and handling of hazardous waste.
it includes:

4- All construction personnel must be properly trained regarding management of


hazardous wastes.

wi- Each individual at site shall be given the responsibility for managing hazardous waste,
from the Iabor's responsibility for cleaning up spilled material, to the safety officer at
site to prevent and report any incidents at site and to respond appropriately to ensure
safety and protect the environment.

1|- Spent oil and diesel shall be separately stored in closed container and on a paved
surface to prevent any spills and contamination of soil

Environmental Management and Sustainability Page |56


Q LARSEN J TOUDRO

#-
1'-
Proper sign board/warning board shall be placed at these areas
No person/worker shall be allowed to enter hazardous waste storage area without prior
I
1
I
a4
permission from safety in-charge at site

via Any spills or leaks that occur at site shall be reported and action shall be taken
accordingly.

4:- The contaminated soil shall be collected at site in cernent bags or any other leak proof
container and later shall be disposed off to recyclers. I
I
4- Dispenser shall be used for refuelling and transferring of hazardous chemicals, diesel
etc. Spill collection tray shall be provided below every container to collect any spills
and preventing soil contamination.

I
is Construction materials that are potentially hazardous should be stored under
watertight conditions, while still making them readily available for use.

1L The hazardous waste temporarily stored at site shall be disposed of through licensed

I
vendors as approved under Environment Protection (Standards for hazardous wastes)
Regulations 2001

3.4.4.7.1 List of authorised Recyclers I


I
All waste generated during the course of project shall be temporarily stored at sites in a safe and
easy to handle manner, which later shall be disposed of through authorised

w
Table 12: List of Authorised Recylcers

Person Ex o orter Number


I
I
Sooba a Beau-Bassin Exorter 57490284
2 BEM Enterprises Mr Berty 57,Colone|
Malabar Maingard Street,
Recycler &
Exporter
4664553
57107898
I
Beau- Bassin

Neel Trading & Mr Ramjaun 567A Bernandin St Exporter 2171991


I
facilities Ltd Pierre, Vallee des 57819377
Pretres
I
4 Atics Ltd Mr Raj Essoo Allee des Exporter 211 2280
Manuiers, Pailles
I
1 Mauritius Glass Mrs Anette Pont Fer, Phoenix Recycler 6963369
Galle
C. Paer
Tribohun
I
I
1 Atics Ltd Mr Raj Essoo Allee des Exporter 213 2280
Man uiers, Pailles

I
Environmental Management and Sustainability Sage I57 l
I.
Q LARSEN à TOUBRO

Ex - orter Number
Mr Philippe PO Box 722, Exporter 2120356
Saupin Plaine Lauzun, 5 729 9999
Port Louis
Mr Ludovic Motorway M2, Exporter 212 2047/
Henry Riche Terre 212 4822/
2124455
Neel Trading & Mr Ramjaun 567A Bernandin St Exporter 2171991
facilities Ltd Pierre, Vallee des
Pretres
D. Photorahic & rintin wastes
Berty 57,Colonel Recycler 4664553
Malabar Maingard Street, 57107898
Beau- Bassin

Cotta e 52501933

Manufacturer Ltd Riviere


F. Used Batteries
Steel Scrap Ltd Mr Philippe PO Box 722, Exporter 212 0356
Saupin Plaine Lauzun, 5 729 9999
Port Loui
BEM Enterprises Mr Berty 57,Colonel Exporter 466 4553
Ltd Malabar Maingard Street, 5710 7898
Beau- Bassin
Shiv Mr parteek Shankar House Exporter 234 4519
Mahashaktishali Dagar Plot No.30, Royal 5941 9698
Steels Ltd Road, Pointe aux

Vivas Tradelink Ltd Mrs Poonam 07th Floor, Exporter 212 9752
Daby Hennessy Court, 5779 0763

_
1 Virgin Oil Company Mrs. Priya Tancrel Road Recycler 437 5927
Mauritius Ltd Ja oau Montane Blanche 5790 2373
2 Bioil Ltd Mrs Arisa 432,Bounty Exporter 243 4191
Avenue, 5252 0609
Residence
Riverview,
Balaclava
3 Eco Fuel Ltd Mr Georgy Montagne Jacquot Recycler 234 1561
Thomas / Ms , Pointe aux 5254 0644
Sables

Environmental Management and Sustainability Page [58


© Q mum: rouuo t

w '—
I—---
Person Ex - orter Number

Boodhoo L
H. UsedT res
1 Surfrider Co. Ltd Mr Langlois Forbach Road, 266 8182
Cottae 5250 1933 «I

3.4.5 Traffic Impacts

The increase on traffic movements associated with construction activities to the Project site could
potentially have an impact on existing road traffic. The increase in road traffic movements will be
associated with following:

o The delivery of construction materials and equipment by heavy trucks to the site;
o The transportation of waste materials;
0 The removal of construction material and other waste from the Project site;
- The trips of construction workers as well as other Project personnel (including office—based
personnel); and
o The delivery of water and diesel tankers.

Numerous vehicles and mobile equipment will circulate across the Project site during construction
works such as heavy—duty dumpers and transit mixers.

Traffic will be one of the important impacts related to the proposed project. The project will involve I
detour of traffic along the roads, speed restrictions of roads, and installation of new structures
close to the roads, increase in travelling time due to construction activities, etc. Management of
traffic during project construction shall be addressed as per detailed in Annexure 11: Traffic I
Coordination and Management, Part 2 and will ensure compliance with applicable design
standards and facilitate approval of required permits. I

Considering the above points and the size and time of the project, the traffic impacts are moderate
adverse and reversible once the construction phase is completed.

3.4.6 Ecology Impacts

3.4.6.1 Terrestrial Ecology

Discharges to Land

The use of contaminated materials for fill activities, the inappropriate disposal of hazardous waste
and the discharge of wastewater from concrete batching plant (that does not meet the standards
for discharge) could cause potential negative impacts on the ecological conditions of the site and
surroundings.

Environmental Management and Sustainability Page |59


@ LARSEN G TOUBRO
in; “a. ‘
\4,-’-L-"'-
d—

Wildlife (Fauna)

The project area is eminently urban, although there are several areas with natural habitats such

as the crossed streams. The chances of wildlife-human conflict in this kind of urban setting is very
k

rare. If there is proximity of wildlife near project site, there will be impact due to construction
LL.

activities and there will be need for the relocation or preservation of wildlife.

h.

Vegetation (Flora)
h

Based on the vegetation present on the proposed project location, the main impact is the removal
of present landscaping. The vegetation will be cut or transplanted to the new location. The other
impacts to the flora and fauna in the nearby environment along the metro express are the
disturbances from the construction activities, removal of vegetation in the area where camps lay
down areas and project offices are established. Overall the impact on the flora and fauna will be
minor adverse and for a short term. The transplantation and plantation of new vegetation will lead
to reversibility and increase in vegetation. Earthworks and other dust generating activities can
however pose soiling impacts to vegetation in nearby areas.

3.4.6.2 Marine Ecology

Indirect impacts on water quality and marine ecology such as sedimentation are not envisaged
from the discharge of storm water. Considering the distance to sea. there is no expected
interference with the marine environment and therefore no envisioned impact on marine ecology.

3.4.6.3 Archaeology and Cultural Heritage


L_L L L.L.

Any development activity has to be initiated only after obtaining clearance from Ministry of Arts
and Culture. Sites of archaeological and paleontological interest if included in the project area,
the elements of conservation significance has to be removed prior to land clearing activities and
has to be handed over to archaeological department. Although archaeological sites far away from
project site, the possibility of finding any archaeological artefacts cannot be ruled out. There is
therefore the possibility of disturbance and/or loss of unknown archaeological resources.

3.4.7 Other Environmental Condition(s) or System(s) Impacts

3.4.7.1 Visual Impacts


LLLL

Visual impacts from the construction activities will be significant due to the presence of
construction machinery, cranes, lay down areas, etc. The visual impacts will be experienced from
personnel travelling in the roads and in nearby buildings, etc. However, the visual impacts will be
reversed upon completion of the project.
l.

3.4.7.2 Social Impacts


t

The social impact from the construction activities are given below:
l.

Environmental Management and Sustainability Page |60



.


WI. 0 Visual impacts to personnel in the area and using the Metro Express;
63 cause» a rouano

0 Increase of travel time due to detours and speed restrictions;


- Impacts on air quality, noise levels, traffic as indicated in the above sections;
0 Positive impact due to the increased job opportunities for qualified personnel in the nearby
areas.
- The social impacts are generally reversed upon completion of the expansion and will result
in positive impacts.

3.4.7.3 Land Use Impacts management

Land use impacts will be loss of land from the proposed expansion and the other associated
facilities such as camps, project offices, and concrete batching plants. The loss of land from the
Metro Express will be an irreversible impact while the area used for project offices, camps,
concrete batching plants will be reversible after completion of the project. The impact on the land
use is long term and is considered as minor.
Preparation, use and after-care of land shall include the following:

/ Conservation of topsoil during vegetation removal, and disposal of cut vegetation by


composting to the extent possible. and provision of wood/timber to local communities
free of charge;
J Disposal of any remaining vegetation at managed sites, without burning;
f Removal of topsoil before excavation; and storage for future use, with measures to
prevent erosion or dust production from stockpiles;
f Prior recording of the location of all walls, fences and other structures on temporarily
acquired land, so that they may be replaced at the end of construction;
/ Reinstatement of all temporarily acquired land after use to its pre-construction
condition or as othen/vise reasonably required by the owner;
\/ Detailed planning of cut and fill volumes to maximise the re-use of material in the
project and minimise the disposal of spoil, with excess spoil being deposited at
planned and government approved disposal sites only;

3.4.7.4 Handling of Top Soil

_g_g—gDurin
Clearin and Grubbin

The work shall consist of cutting, removing and disposing of all materials such as trees,
bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150 mm in
thickness, rubbish etc., which are unsuitable for incorporation in the works. Necessary
— _— ñi- = -rä_-—_-

excavation, backfilling of pits resulting from uprooting of trees and stumps to required
compaction, handling, salvaging, and disposal of cleared materials. Clearing and grubbing
shall be performed in advance of earthwork operations and in accordance with the
requirements and specifications.

Striin and Storin To Soil


____g__pLg_____Lp_Durin
#4..—

In localities, where most of the available embankment materials are not conductive to plant
growth. The top soil from all areas of cutting and from all areas to be covered by embankment
foundation shall be stripped to specified depths not exceeding 150 mm and stored in
. I I

Environmental Management and Sustainability Page |61


J: Q LARSEN l YOUDRO

stockpiles of adequate height for covering embankment slopes, cut slopes and other
disturbed areas where re-vegetation is desired. Top soil shall not be unnecessarily trafficked
either before stripping or when in a stockpile. Top soil temporarily stacked at site shall be
later used in turfing and landscape development.

3.4.8 Evaluation of significance of Environmental Impacts


iîΑˑL

Table 16 presents the significance of potential environmental impacts discussed in previous


sections before mitigation measures are implemented. A 4x4 matrix have been used for
F

calculating the impacts caused by different aspects of project and related activity.
L

Following areas shall be considered for the evaluation of impact:


F

The risks associated with the local environment


Legal requirements
F

Any license / permit requirements


r-

Financial implications
History of previous incidents
't'fi ‘L‘L
F

\\’\\\

Known area of concern for stakeholders

The evaluation of environmental impacts can be done by:


/ Identifying the existing control measures
!

f Determining the likelihood of occurrence (probability)


f Assessing the potential environmental aspects
r—

f Ascertaining the risk/impact level based on the likelihood of severity

__L_Existin
Risk Control
_

The presence of existing control measures shall be first identified for each of the
Environment aspect.
By considering the effectiveness of the existing controls and the consequences of their

failure, the risk / impact level can be assessed.


Any further mitigation measures that need to be implemented are identified depending
x._L—

on the severity of the impact


_

__—___(—y)_Likelihood
of occurrence Probabilit
LT:

Likelihood of occurrence of an incident is classified as per the table given below:


_

Table 13: Criteria for Description of Probability

Probability Description
‘~_i

The hihest cateo will alwa s be used


Value

1H

4 Very Likely The event is almost certain to occur and has occurred repeatedly in the
_

construction indust
l

HEB
\

Environmental Management and Sustainability Page I62


‘l

“H
A
@ Q LARSEN 8 TOUBRO

_vSeverit
Severity is the degree or extent of harm that can be caused by the environment aspect as a result
of an incident. Severity is classified as per the table given below:

Table 14: Criteria for Description of Severity

Severity Description
The hihest cateo shall alwa s be used

Insi o nificant

The two figures are then multiplied to give the significance rating. For example
Likelihood x Severity = Significance
2x2-—4

Determine Controls:

Based impact level determined, controls should be selected to reduce it to an acceptable level.
This can be done by reducing the Likelihood and/or Severity:

Table 15: Criteria for calulating Significance of Environmental impact

m. Recommended Actions

No additional risk control measures ma be needed.


I 12:: Work can be carried out with Risk controls in lace
Don’t start work. Risk level must be reduced to Medium / low before
commencin work.

Table 16 shows the detailed Environmental aspects, their impacts, severity, probability and impact
rating calculation.

Environmental Management and Sustainability Page [63


e LARSEN A TOUDIO

Table 16: Environmental Impact Significance

Evaluation of Impact
Activity Environmental Aspect Environmental Impacts

Probability Ralmflpnat

A. Water Quality
Sediment laden runoff Reduced water quality in local waterways due
from disturbed areas to increased turbidi and sediment loadin
Diesel/fuel spills Contamination of water quality during heavy
1 Earthwork Groundwater seepage in rain
excavations Blocking of existing drains and cross drainage
Dumping/deposition of structures due to deposition of soil & during
soil in existing drains. construction of new drains,
Construction near Reduced water quality in local waterways due
existing cross drainage to increased turbidi and sediment loadin
structures Contamination of surface water by petroleum
Bn'dge
Excavated earth h drocarbons
Construction &
Waste & surplus Contamination of surface water by concrete
Concrete
concrete slu
Batching
Sediment laden runoff
Blocking of Existing Drain resulting in
Diesel/fuel spills
contamination of water quality and flooding

Contamination of surface water by


unauthorised disposal of solid waste in water
courses and drains
Labor Colony & Solid Waste Generation Surface & ground water contamination due to
site Offiœ Waste Water Generation disposal of waste water from labor colonies and
Operations Water usage site offices in water courses and existin drains

Environmental Management and Sustainability


LLLLLL
\
H
EL.
t \—
@ LARSEN c rouno

Evaluation of Impact
Activity Environmental Aspect Environmental Impacts
Probability Severity Impact
Ratin
sites
2.0 Plant & Machinery Contamination of water due to contaminated 1 2
workshos run-offdurin hea rain
Ground Water Drawdown of local groundwater levels and
3 3
Water Abstraction reduced rechare rates
Req uirement Surface water Contamination of water bodies due to sediment
2
abstraction run-off & movement of - o uiment & machine
Reduced water quality in local waterways due
2
to increased turbidi and sediment loadin
Construction of Over clearing in riparian
temporary areas Adverse impact on aquatic ecosystems
access/approach Fines from rockfill Road users safety concerns and community
across waterway Mud tracking com n laints
crossings Diesel/fuel spills
Contamination of surface water by petroleum
2
h drocarbons

Contamination of surface water by tannins 3 3


Tanning Ieachate runoff Negative impact on aquatic ecosystems, i.e.
Materials Sediment laden runoff habitat degradation, fish kills and weed 3
stockpiling Acidic surface or invasion
groundwater Reduced water quality in local waterways due
to increased turbidity and sediment loading 3
from unstabilised stock o iles

B. Flora & Fauna

Construction of Loss of Vegetation


temporary
Site clearance Damage to existing trees at site
structures like
Removal of vegetation
labor colonies.
Removal of top soil loss of endangered species of flora & fauna
site offices.
stockpiling Disturbance to ecosystem

Environmental Management and Sustainability


Q LARSEN l YOUJRO

Evaluation of Impact
Environmental Aspect Environmental Impacts
Probability Severity
Rating
3 2

Site clearance 3
Stockpiling
Removal of vegetation 1

Oil Spills 3
Operation of plant
Deposition of Dust on Decrease rate of photosynthesis and affected
& machinery
plants and vegetation Iant rowth

2
Use of fuel for
2
cooking for cooking
1

. Air Quality
Earthwork Degradation in Air Quality
Dust Generation due to:
including Traffic
Vehicular movements
Movement & Public Issues
Loading 8. unloading of
maten'al
material Damage to existing vegetation
Transportation

Dust Generation due to: Degradation in Air Quality


Vehicular movements
Crusher. Batching Public Issues
Loading & unloading of
Plant & Pug mill
material
operations Loss/Damage to existing vegetation
Soil Erosion dun'ng
stockpiling Respiratory Problems to workmen

Environmental Management and Sustainability Page I66


LLLLLL
\
\
H
—_
..
/\
bfl AAISIN S YODRRO

Evaluation of Impact
Envlronmental Aspect Environmental Impacts
Probability Ra'mupn“
Plant & Machinery
Operations Dust Generation
Degradation in Air Quality
including DG sets Exhaust Emissions
Oerations

D. Solid & Hazardous Waste

Demolition waste lnappropn'ate disposal of waste


including pipe work, Disosal in drains, water courses. valle 5 etc.
Demolition bnc'ks, buildings,
corrugated iron, fibrous
cements and avements. Cross-contamination of waste
Inappropriate disposal of waste causing:
Clean'ng and Blocking of Natural Drains
Green waste
grubbing Odour Problem
Communi issues
in appropriate disposal of Municipal Solid
Waste Generated from Labor Colony :
1. Dumping in open land (soil contamination)
Labor Colony and 2. Dumping in natural drains (Blocking &
Municipal Solid Waste
Site Offices contamination of water)
3. Burnin in oen Air Pollution

Communi issues due to odour roblem


In appropn'ate Disposal of Hazardous waste
including Chemicals, Batteries etc. resulting in:
Hazardous Waste 1. Contamination of Land
Plant 8. Machinery
(Waste Oil. Chemicals. 2. Pollution of Water courses
Operations
Batteries etc.) 3. Fire and other hazards due to chemical &
Physical nature of waste.

Environmental Management and Sustainability


JFH- - n-~_- - _
L1 Q LANSEN 8 TGUIIO

1.1
Evaluation of Impact
Activity Environmental Aspect Environmental Impacts

E. Land Environment

Increased rate of soil erosion due to removal of

IJ
trees and vegetation cover.
Removal of tree & Loss of fertility of land due to removal of top
Construction of
soil
1

vegetation
Temporary
Clearing & Grubbing Generation of pests & mosquitos and other
structures (Site
1

Green Waste microbes due to improper disposal of green


offices. Labor
Oil Spills waste.
Colonies. Etc)
Overburden waste Contamination of land due to oil spills and
improper disposal of overburden/demolition of
waste on land
In appropriate disposal of Municipal Solid
Waste Generated from Labor Colony:
ii

1. Dumping in open land


Labor Colony and Municipal Solid Waste 2. Dumping in natural drains
Site Offices Waste water generation 3. Burnin ' -
Contamination of land due to in-appropn‘ate
disposal of waste water on open land, valleys
\_.

or drain sstems.
Construction or
Demolition improper disposal of demolition waste
demolition waste
Contamination of land due to Improper disposal
Solid & Hazardous
of Solid & Hazardous waste in oen land
Maten'al use Waste Generation
Unattended scrap steel & other waste left at
Scrap material
site

Brl'dge Waste & surplus Contamination of land by petroleum


Construction & concrete hydrocarbons
\_.\_.

Concrete Diesel/fuel spills


Batching Concrete slurry spills Contamination of land by concrete slurry

Contamination of land due to oil spills

Environmental Management and Sustainability


LLLÏ"
\__.
lf'
._.L
Q LARSEM I TOUBRO

Evaluation of Impact
Activity Environmental Aspect Environmental Impacts
Impact
Probability Rafi"
Plant & Machinery Oil Spills Improper disposal of hazardous waste on open
0 rations Waste oil eneration land.
F. Noise Levels
- - - Long terms exposure to high noise level may
Plant 8‘ machmery generated dun'ng Plant & cause heann loss
operations
Machinery Operations Public issues and community complaints
4

Long terms exposure to high noise level may


cause hearin loss
Noise from piling works causes disturbance
Noise and vibration from
Piling works and leads to communicoml-aints
piling activities
Vibration from impact piling works causes
disturbance or damage to structures and leads
to communi comolaints

. . . Public issues and communi com laints —


Traffic Nonse & Vibration from w p
Movements Traffic movement Long terms exposure to high noise level may 4
cause hean'n loss

Environmental Management and Sustainability Page |69


ê;
\
1
\
Q LARSEN a TOUBRO

3.4.9 General Conduct of Work

- L&T will be ensuring the measures to facilitate the achievement of the environmental
objectives and performance requirements of the Works, which include, as a minimum:
a. compliance with all environmental Law relevant to the Works and the Contract;
b addressing environment related community issues arising from the Works;
0. ensuring that no events of material or serious environmental harm occur;
d ensuring that Design & Construction methodologies and activities incorporating
environmental best practices are implemented; and
e. Compliance with all relevant environmental approvals.

o All construction machinery and vehicles shall be of proven efficiency and shall conform to
the relevant standards for emissions and noise levels.

0 L&T will obtain approval from land Owners for temporary use of land for ancillary sites
such as labour camps, storage sites and construction yards. Local authorities will be
consulted on locations, which will in no case be within 100 m of sensitive receptors such
as hospitals, schools and residential communities.

0 Temporary use of land is subject to approval by the Engineer.

0 After completion of occupancy, all affected areas within the general project boundary and
temporary sites will be graded to their final elevation, conforming to the drainage plan
specified in the design. Temporary sites will be graded to drain. Final surfaces along the
alignment shall be reinstated.

- Contaminated earth, plant matter and waste or unused materials will be removed and
disposed of at locations approved by the Engineer. Temporary pits and sumps will be
backfilled and compacted.

o L&T will avoid excavating and trenching near roads, buildings, walls, and existing buried
L‘HL ‘L L L‘ L'

utilities. If unavoidable, shall provide adequate shoring to prevent damage. Backfill and
sealing of construction trenches shall be done promptly.

o L&T will avoid blocking access to land, homes and businesses; where unavoidable, L&T
will provide temporary access to affected properties and reinstate permanent access on
completion of work; minimize the area under construction at any one time and the duration
l

of works at any one location & minimize impacts on infrastructure, access and services.

o L&T will install a gate, signs and lighting at the entrance to the construction site occupied
\

by him and at movable sites, and restrict access to sites along the alignment by erecting
temporary walls and barricades.
\

- L&T will promptly reinstate any services and reinstall any physical facilities that are cut,
disconnected or damaged during construction activities, and will maintain or provide
\

Environmental Management and Sustainability Page |70


it
hHHHHHH
t
@ Q LARSEN fi TOUDRO

temporary services that are interrupted by construction. The Engineer will inspect and
certify the adequacy of all reinstated services and facilities.

0 After completion of the work at a location, all construction-related machinery and


equipment, and waste or unused materials, will be removed, relocated, and disposed of
as necessary at locations subject to the approval of the Engineer.

0 L&T will stop construction on discovery of objects of archaeological origin and notify the
Employer, who will contact the Department of Archaeology, Ministry of Cultural Affairs to
investigate and, if desirable, undertake recovery. Work shall remain halted at the specific
location until investigation is complete.

3.4.10 Labour provision

o L&T will conform to National Law in relation to hiring and employment and will comply with
the principle of equal opportunity, fair treatment, and non-discrimination with respect to
the employment relationship.

0 L&T will implement a safety and accident prevention program involving provision, training
and use of safety equipment; minimum skills qualifications for operators and drivers; and
record keeping related to accidents.

0 L&T will provide Personal Protective Equipment (PPE) to workers that offer adequate
protection to the worker without incurring unnecessary inconvenience in its use. Proper
maintenance of PPE, including cleaning when dirty and replacement when damaged or
worn out; and proper use of PPE should be part of training programs, as appropriate.

- L&T will maintain first aid kits onsite along with instructions for use, and personnel trained
in basic first aid emergency response measures. In case of injury, L&T shall arrange
treatment of the injured worker(s) and bear the cost of treatment.

- Labourers and others that are resident at the site will be provided with lodging in a camp
setting, potable water supply, food service facilities and adequate means for maintaining
personal hygiene and solid/liquid waste disposal.

0 Safe drinking water to be provided at the worksite and worker camps with sufficient
numbers of access points to assure availability for workers. Water will be periodically
tested for and assured safe from bacteriological contamination.

o HIV/AIDS awareness should be incorporated into the L&T’s policy and outreach toward
workers. In this regard, please refer to Particular Conditions.

Environmental Management and Sustainability Page |71


:3? _ .
Q LARSEN a rouuo

ë
\‘l
I

3.4.11 Transport management

o L&T will plan and clearly mark routes through urban areas for movement of materials and
equipment.

0 Truck traffic to the extent reasonable and possible will be routed away from residential
streets to through routes with the least residential land use.

- Flagmen will be stationed at main intersections along haul routes during periods of intense
transport activity, at points of vehicle access into the worksite, at obstructions in the line
of traffic, and at the start and end of construction. Traffic detours will be set up if necessary
and clearly marked.

- L&T will provide front and rear escort vehicles, equipped with flashing light, for movement
of over-weight/over-length (OW/0L) vehicles, and auxiliary flagmen along the route and
on-board to assure clearance.

0 Movement of OW/OL loads preferably will be done at night.

3.4.12 Removal and Trimming of Trees in Public Right -of —way

L&T has submitted an application to, and obtain consent from Ministry of Agro Industry and Food
Security for the removal and trimming of trees in public right—of—way.
Phase I (Rose hill and Port Louis): Total 1026 nos of tree (tree diameter 218 cm) is coming along
the proposed alignment which need to be removed from existing locations. Out of this, 912 is
exotic species while 114 nos is endemic species. The endemic specie will be transplanted by the
L&T.
Phase II (Curepipe to Rose Hill): Total 1,138 tree coming within the project alignments, out of
which 830 tree will be felled while 308 Tree will be translocated. The Exotic tree species will be
removed if coming along the proposed alignment while endemic tress species will be translocated.
L&T will also do the compensatory plantation for the removed tree in the ratio of 1:3.

3.4.13 Terrestrial and aquatic ecology protection

48c0e

The scope of the terrestrial and aquatic ecology protection Plan is to provide the controls and
mitigation measures to prevent releases to terrestrial and aquatic ecological systems and
document the procedures to protect wildlife, including endangered species in accordance with
— — — — — V'fi

DCEMP and in compliance with applicable laws, regulations and guidance documents. It is to
ensure that all construction activities related to the Project are managed in a way that prevents or
minimizes impacts on flora, fauna and habitat; and minimizes the spreading or introduction of
weeds within the Project site and immediate surrounds. Key targets are:

Environmental Management and Sustainability Page |72


® 9 LÀRSEN & TOUBRO

o No removal of vegetation except as permitted by the Construction Management Agency


(CMA) / Resident Engineer.
- Translocation of the endemic species tree falling along the proposed metro alignment.
0 No damage to retained vegetation and any environmentally sensitive areas;
o No injury caused to fauna during vegetation removal/trimming; and,
o No increase in diversity or coverage of weed species within the Project area and
immediate area
0 Tree / environment protection zones established across the Project site for vegetation to
be protected
0 Designated access tracks, parking areas, material and equipment storage areas
established on the Project.

#Resonsibilities
The EHS Manager will define the roles and responsibilities for ensuring that the Terrestrial and
Aquatic Ecology mitigation measures are implemented and maintained during construction
activities. Helshe will assess the effectiveness and the correct implementation of the mitigation
measures. The Environmental Manager will:

0 Identify and implement all the possible control measures for minimising releases to
terrestrial ecological systems and protecting wildlife; and

- Compile and promptly deliver the Ecological reports to CMA and provide additional
information when requested.

The Project Director will ensure that sufficient resources are available for the implementation of
the Terrestrial and Aquatic Ecology mitigation measures and that all on—site workers are aware of
the requirements.

____gy___g_Methodolo
and Mitiations

The Terrestrial and Aquatic Ecology Control will follow the methodology and mitigation measures
described in table 17.

Table 17: Terrestrial and Aquatic Ecology Control Methodology and Mitigations

Construction Areas Methodolo and Miti


General L&T will comply with The Forests and Reserves Act
41/1983 and the National Forestry Policy of Mauritius.

A walkover in consultation with the stakeholders has


been conducted before construction starts to identify any
signs of ecologically significant species of flora or fauna
so this can be relocated to a suitable habitat.

Environmental Management and Sustainability Page |73


Q LARSEN a TOUBRO

Construction Areas Methodolo and Mitiations


L&T will perform removal, preservation if any.
transportation and reinstallation of plantations as
required.

L&T will comply with the most recent regulations issued


by the concerned authorities regarding working near
green areas and with all conditions of all project
environmental approvals relevant to the Works.

L&T will develop a specific management measures for


aquatic ecology in particular environmentally sensitive
areas (such as wetlands and river resources), runoff and
loss of riparian habitat that potentially supports endemic
species. It will especially consider the mains surface
water bodies in the track of the project, St. Louis Stream
n°1 lGrand River North West and Rievie‘re Se‘che and its
riparian vegetation.

Site clearance and construction of access roads will be


planned carefully prior to work to avoid any sensitive
r

vegetation areas.
3

Restoration of habitats to their original condition following


construction.

Follow "no approach" attitude to wildlife onsite


If any sensitive or protected species are identified at any
'_

time during construction, the CMA shall be notified and a


specialist ecologist shall be commissioned to relocate
l-t-i-L

the individuals.

Personnel on-site shall report any instance of wildlife


being in state of poor health.
H‘HHH

Identify, for the information of construction workers, all


environmentally and socially sensitive areas as
H

"preserve" or "protect".

A 'minimum footprint' principle should be applied


throughout the construction phase of the project.
‘l

Clearing of vegetation (if any) should be kept to an


absolute minimum.
1‘

Environmental Management and Sustainability Page I74


Q LARSEN & TOUBRO

Construction Areas Methodolo - and Miti - ations


Night-time construction will be avoided to the extent
possible in this area as this has the potential to affect
nocturnal mammals and birds in adjacent areas.

Project vehicle and personnel will not drive or walk


outside the designated access roads.

Excavations will be made accessible in case animals fall


in, that is ramps will be placed at regular intervals to allow
fallen animals to get out of the excavation. There will be
a strict 'no approach' attitude to wildlife-enforced onsite;
Personnel will not handle or touch wildlife but notify the
Environmental Manager and/or the EHS Manager in
case of any sightings.

Chip all removed vegetation for mulch or compost.


Use non-toxic soil binders on slopes, "natural" and future
planting areas during construction.

L&T shall ensure that the work place is free of trash,


garbage, debris rubbish, plants and weeds. He shall
provide and ensure proper uses of refuse containers to
ensure that rodents, fleas and other pests are not
harbored or attracted.

3.4.14 Tree Plantation

R__g_gesonsibili

Project Manager shall be overall responsible for tree plantation activities to be carried out at the
site as per the approved landscape plan by Construction Management Agency / Engineer.

Environment Manager shall be responsible in coordinating with all the concerned departments /
agencies for effective implementation of approved landscape plan. He shall also be responsible
for the periodic monitoring of the plantation and transplantation activities and maintaining all the
relevant records.

Environmental Benefits of Plantation

Some of the environmental benefits are listed below:

0 Tree converts carbon di-oxide to oxygen.


0 Tree plantations have a positive effect on controliing soil erosion due to the permanent
root system.

Environmental Management and Sustainability Page |75


9 LARSEN 8 TOUBRO

- Selective tree plantation helps in improving and preserving the local biodiversity.
- Group of trees help in cooling the air by changing water in to water vapour.
o Selective tree plantation helps in entrapping air polluting gases (802 and 002) and dust
filtering (suspended and reparable particulate matter)

R—Leforestation
Ian

L&T will be complied with The Forests and Reserves Act 41/1983 and the National Forestry
Policy.

L&T will do adequate tree plantation and take required steps towards prevention of bio- diversity
so as to protect the environment.

The tree counting survey and marking has been carried out r'n association with the forestry
department. The Forestry Service, Ministry of Agro Industry and Food Security has approved the
felling and translocating of trees. Additionally, L&T is committed for abiding the stipulated
conditions and do the translocation of endemic species and compensatory plantation for the every
tree felling.

T_—g_(_g__)_ree
Plantin lants and shrubs:

Plant material shall be well formed shaped true to type and free from disease, insects and defects
such as knots. sun-scaled, windburn, and any injuries. After delivery, r'f planting is not to be carried
out immediately, balled plants shall be placed back to back and the ball covered with sand to
prevent drying out. 802 loving and dust filtering plant species shall be planted near to the plant
and machinery areas, heavy vehicular movement areas, roadside and median.

Depending on the availability in local market and its survival r'n that particular area, these plants
can be planted to enhance the environment.

Digging of Pits:

Tree pit shall be dug to a minimum of three weeks prior to backfilling. The pits shall be 60 cm r'n
diameter and 600m deep. While digging the pits, the topsoil up to a depth of 30 cm may be kept
aside, if found good (depending on site conditions), and mixed with the rest of the soil. If the soil
is normal it shall be mixed with manure, river sand shall be added to the soil if it is heavy.

Back Filling:
The soil back filled watered through end gently pressed down, a day previous to planting, to make
sure that it may not further settle down after planting. The soil shall be pressed down firmly by
treading it down, leaving a shallow depression all rounds for watering.

Environmental Management and Sustainability Page |76


© Q LARSEN 8 TOUBRO

Staking:
Newly planted trees shall be held firmly although not rigidly by staking to prevent air pocket
forming around the stem and newly formed fibrous roots being broken by mechanical puling as
the tree rocks.
The main methods of stacking are:

a) A single vertical stake of 90 cm longer than the clear stem of the tree, driven 60 cm in to the
soil.
b) A single stake driven in at an angle at 45 degree and leaning towards the prevailing wind, the
stem just below the lowest branch being attached to the stake. Suitable for small bare- rooted
or ball material.
c) For plant material 3m to 4.5 m high with a single stem a three- wire adjustable guy system
may be used in exposed situations.

The end of stake shall be pointed and the lower 1m to 1.2m shall be coated with a non- injurious
wood preservative allowing at least 150 mm above ground level.

Planting:
Plant trees at the original soil depth, the bottom of the planting pit shall be covered with 5 to 10
cm of soil. Soil shall be placed around the roots, gently shaking the tree to allow the soil particles
to sniff in to the root system to ensure close contact with all roots and prevent air pockets. Back
fill shall be firmed as filling proceeds, layer by layer.

The balance earth shall be filled in a mixture of 1:3 (1 part compost manure to 3 part earth by
volume) m and 50 gm potash 50 gm of Super Phosphate and 1 kg Neem oil cake. Aldrin or
equivalent insecticides shall be applied every 15 days in a mixture of 5 ml in 5 litres of water.

3.4.15 Contaminated land management

_p_Purose
This procedure is prepared for controlling the potential impacts of the Works on land and to ensure
appropriate mitigation measures to achieve no deterioration to soil quality. Details the provisions
for the removal, transportation, remediation and/or management of contaminated land.

R_L_yesonsibilit
Project Manager shall be overall responsible in providing the adequate resources to monitor,
control and mitigate the potential impacts of the Works on soil. He shall be responsible in obtaining
the required consent to establish and operate the plants and machineries.

Construction Managers shall be responsible to ensure that the removal, transportation,


remediation and / or management of contaminated land are done correctly and all vehicles,
equipment, plants and machineries used for the construction are operated in an environmentally
responsible manner.

Environmental Management and Sustainability Page |77


@j‘fi 9 LARSEN ü TOUBRO

Environment Manager (EHS Manager) shall be responsible in monitoring requirements to comply


with the land quality objectives detailed within conditions of approvals. He shall also be
responsible in implementing the required mitigation measures as discussed in this procedure to
control the soils quality and maintain the relevant records.

3.4.16 Acid sulfate soil management

_p_Purose

The objectives of the Acid Sulphate Soil Management Plan (ASSMP) are to minimise the risk to
the environment resulting from Acid Sulphate Soils by:

defining areas of Potential Acid Sulphate Soils;


providing an operational methodology to reduce the potential risks to the environment due
H
È?»

to the disturbance of potentially acid sulphate soil during construction works; and
Û

Documenting, monitoring and contingency methods for implementation duri'ng


“L

construction works.

__p—g—Acid
Sulhate Soil Manaement Plan

To achieve the objectives, the scope of work will consider of following:


"F

development of the onshore management measures;


development of environmental compliance monitoring and reporting requirements;
ë
"E

outline potential contingency measures; and


outline requirements for the Acid Sulphate Soil closure report.
"L—a
.

As per geotechnical investigation at 70 locations, no sulfate content found in soil. So this plan
may not be required for this project. If any acid sulfate soils recorded, L&T will do an ASS field
l—nl
it
a

sampling investigation (ASSl) along the project corridor.

Prior to any excavation, a representative surface and sub-surface soil sampling and analysis
t—d

program will be undertaken to characterise the material to be excavated.


E

In order to verify the nature of the disturbed or excavated material during construction, material
H
ä

will be sampled and tested for Acid Sulphate Soil by carrying out confirmatory laboratory testing
by approved methods (such as SCR suite or Suspension Peroxide Oxidation Combined Acidity
and Sulphate (SPOCAS) suite) as required.
bi
r

Validation samples will be collected from excavated acid sulphate soils to determine adequate
treatment rates. Post treatment samples will be collected to confirm adequate treatment prior to
reuse or disposal.
Should action criteria be exceeded, contingency measures will be instigated. Where acid sulphate
soils are identified groundwater will be monitored prior to construction, on a monthly basis during
vi

construction.
2:.-

“ii—a
i.
a

Environmental Management and Sustainability Page |78


H
à
H
.
® 9 LARSEN a mum

The proposed metro express project is at grade and there are limited structures along the project
alignments. Hence, the locations of groundwater extraction during dewatering are mostly at bridge
and structures locations. Groundwater monitoring will be undertaken during construction activities
according to regulatory guidelines.
Scope and frequency of reporting relative to ASS management will be by agreement with the
CMA but will, as a minimum, comprise an annual report capturing the key criteria. If an incident
occurs, this will be reported to the relevant statutory authority as per contingency measures.

CONTINGENCIES — To assist in the management of PASS/AASS present in the project area the
following contingency measures will be in place to reduce the risk of harm to the surrounding
environment:
0 Should the soil monitoring not satisfactorily identify areas of ASS then sampling and
monitoring methodology will be reviewed to improve effectiveness.
0 In the case of water quality parameters. should these parameters be exceeded then
monitoring frequency will be increased and samples will be submitted for laboratory
analysis as required.
0 incidents or other relevant occurrences will be reported to the relevant statutory authority.

An Acid Sulphate Soils Management Plan (ASSMP) will be developed and implemented to
manage impacts associated with de-watering discharge. Specific management measures include:
0 Site induction/training in the monitoring and management of de-watering discharge for
relevant subcontractors;
0 Monitoring program to assess dewatering discharge quality prior to discharge;
0 Treatment of de-watering discharge prior to discharge (if required).

Specific management measures could include:

0 Site induction/training in the monitoring and management of PASS to relevant contractors;


- Investigation to assess the presence of/successful neutralisation of PASS;
0 If PASS is found then appropriate management measures will be implemented as per
guidelines.

Project design is to incorporate corrosion resistant design materials based upon field identification
of acid sulphate soils, if required.

If acid sulphate soils are present, excavated soil is to be treated during construction to prevent
acidic fluids leaching into surface water or groundwater.
A detailed information on acid sulphate soil will be provided as and when identified along the
project corridor.

3.4.17 Noise and vibration attenuation management plan

P_p___urose

The purpose of this procedure is to ensure that potential construction noise and vibration impacts
are given adequate consideration during the project development by:

Environmental Management and Sustainability Page [79



Q LARSEN G TOUDRO
1 q
l
l

Providing engineering control measures as the main approach to reducing and managing
noise levels at work.
Adoption of a systematic approach to reducing and managing exposure to excessive noise
and vibration.

Mesonsibili

Project Manager shall be overall responsible in providing the adequate resources to monitor,
control and mitigate the excessive noise and vibration level.

Environmental Manager shall be responsible in monitoring the site with respect to noise and
vibration levels. Also shall be responsible in implementing the required mitigation measures as
discussed in this procedure to control the noise and levels and maintain the relevant records.

N—_—_;_oise
and vibration control measures General Reuirements

The activities, which can generate excessive noise, more than 100 dB (A) may be defined as
noisy area such as.

Users of impact equipment and tools (e.g. piling hammers, concrete breakers, manual
hammers).
Users of pneumatically powered equipment.
Operators of plant powered by internal combustion engines.
Excessive noise means noise that exceeds 75 dB (A) irrespective of exposure duration.
111111111
i

All the plant and equipment to be used on the site shall be properly maintained in good operating
condition and noisy and vibration construction activities shall be effectively sound- reduced by
means of silencers. mufflers, acoustic linings or shields, acoustic sheds or screens or other
Ind
i’ï'

b.

means, to avoid disturbance to any nearby noise and vibration sensitive receivers.

A preliminary Noise and vibration Assessment and reasonable mitigation measures which shall
be adopted has been included in an Appendix.

According to the results obtained after the analysis and the measures, the Table 18 shows the
sections where possible corrective measures will be required and it is considerate potential noise
and vibration sensitive receivers:
à

Table 18: Noise and vibration sensitive buildings along the corridor.

C _ _
m Lmax
h. Start Ch. Finish Length (dB Exceed)
H
à

s
—-———__

RIGHT 3+590 3+730


RIGHT 3+800 3+87O
I

Environmental Management and Sustainability Page |80


l
\_‘
®
9 LARSEN & TOUBRO

Lmax
m Ch. Start Ch. Finish Length

2
dB Exceed

12

n 3

2 2

s
n
22
22
22
2s
2e
w
22
12 m-
2o
21
22
22
2s n

2e
22 m- n

22
Noise and vibration monitoring shall be carried out at noise and vibration sensitive receptor
locations and after a change in construction activity. Noise measurements shall, as far as
practicable be affected one metre from the nearest opening of any residential building facing the
noise source and at 1.5 metres above the ground or floor level.

Construction noise measurements shall coincide with daytime and night-time periods of maximum
noise generating construction activities.

Accordance with the requirements of Annexure 5 — Part 1 (Employer’s Requirements), L&T will
comply with the Environment Protection (Control of Noise) Regulations, 2008 and the
Environment Protection (Environmental Standards for Noise) Regulations 1997 and the Road
Traffic (Control of Vehicle Emissions) Regulations 2002.

Environmental Management and Sustainability Page |81


© Q LARSEN G TOUBRO

The ENVIRONMENT PROTECTION (AMENDMENT) ACT 2008 set out that the environmental
standard for noise emitted from a place of worship shall be 55 dB(A) Leq recorded at the boundary
of the site, dB(A) Leq being the equivalent A — weighted sound pressure level measured in
decibel.

The Environmental Standards for Noise 1997 set out:

(1) Noise measurements shall, as far as practicable be affected one metre from the
nearest opening of any residential building facing the noise source and at 1.5
metres above the ground or floor level
(2) The measurement methods and equipment used shall be those approved by the
enforcing agency

Table 19: Noise Construction Noise Criteria

Recommended Criteria

“Maximum” recommended design levels advised in Control of Noise


ulations 2008 da ime noise exosure limits of 60 dB A

Noise Reulations 2008 55 dB(A

L&T will comply with acceptable vibration limits, which are to be adopted throughout the duration
of the Contract as detailed within conditions of relevant environmental approvals, or where these
do not exist, the vibration performance criteria as detailed within Tables A2.3 of the Annexure 2,
Part 1 (Environmental Management and Sustainability Requirements) and as mentioned in Table
20 below.
Table 20: Vibration performance criteria (Table A2.3 of Annexure 2, Part 1)

Location Recommended Criteria

BS7385 — 2: 1 973

vibration DECC 2006


Health Buildings As per building specific vibration sensitivity investigation
that is to be undertaken prior to finalisation of this
subordinate plan and the Design & Construction
Environmental Manaement Plan

All the noise hazard works shall be strictly adhered to the time restrictions (preferably day).
All the personnel’s working in the noise hazard areas shall be provided with personal hearing
protectors.

Adequate training shall be provided to all the employees working in the noise hazard areas.
—_ — _— — ‘—" —W

Environmental Management and Sustainability Page |82


® Q LARSEN l TOUBRO

Laying out the site to separate noisy activities from quieter ones (isolation), e.g. concrete
compressors, pumps and generators in screened-off areas or away from the work to be carried
out; workshops, stores etc. away from noisy activities.

Scheduling noisy activities to take place when the minimum numbers of other nearby workers are
present (but noise out of hours needs to be carefully planned to avoid neighborhood annoyance).

Rotation of workers to minimize exposure times.

Prevention of the noise at the source

All noise—emitting objects generate air borne energy (noise) and structure borne energy
(vibrations). Treatment of these noise problems may require modifications, partial redesign or
replacement of the noise-emitting object.

Noise shall be prevented at the source by adopting following measures:

a Provision of mufflers or silencers


0 Provision of noise barriers and noise enclosures at the source of noise generation.

Administrative noise control measures:

Where it is not practicable to comply with the exposure standard for noise solely through other
control measures, administration control measures are used. These measures reduce the noise
to which a person is exposed by means of work arrangement, including

o Organizing schedules so that noisy work is done when, as few people as possible are
present.
0 Notifying people in advance when noisy work is to be carried out, so they can limit their
exposure to it.
0 Keeping people out of noisy area, if theirjob does not require them to be there.
0 Sign posting noisy areas

Periodic rotation of persons working in excessive noisy area shall be carried out.

3.4.18 Cultural Heritage Management

L&T will comply with The National Heritage Fund Act 2003 Act no. 40 of 2003.
L&T will identify items and places of Mauritian cultural heritage significance impacted by the
Project at both a national and local level including all activities associated with the Provisional
Sum Works — Immigration Station.

L&T will develop a CulturalHeritage Impact Statement (CHIS). The Cultural Heritage
Management Plan shall comply with the National Heritage Fund Act 2003 as well as the relevant
Planning Policy Guidance (PPG 6) — Urban Heritage area— Buffer Zone of the Aapravasi Ghat

Environmental Management and Sustainability Page |83


6 LARSEN l TOUBRO

World Heritage property (2011).; and details all reasonable and practicable measures to avoid or,
where unavoidable, minimise Works that may cause harm to items of heritage and archaeological
it iiti
significance as in the GRNW Bridge.

Prior to the commencement of construction or bulldozing of any area currently undeveloped, the
archaeologist and project personnel will make a detailed on-the- ground inspection to determine
‘l
4‘

whether any remains of structures or any archaeological material can be identified. In the event
2
r

of cultural heritage sites being identified, the following procedure will be followed:
0 Stop work immediately;
E

0 A GPS reading will be taken;


- Digital photographs will be taken;
0 A brief description will be taken;
0 The findings will be passed to cultural and heritage authority for comment and advice; and
o L&T will await guidance from cultural and heritage authority prior to the commencement
of works.

3.4.19 Ozone Depletion

Ozone

Ozone is a molecule comprising three oxygen atoms (03) compared to the oxygen gas that we
breathe which comprises two oxygen atoms (02). Ozone is a poisonous substance and if inhaled
*ttttt

in even trace quantities can cause death. Ozone does exist near the earth’s surface in what is
known as the troposphere (0 to Smiles or 0 to 15km. above the earth's surface). At this level ozone
is a troublesome pollutant consisting of photochemical smog and acid rain that can cause damage
Ed

to living tissues and plants.


L—i

However, ozone in the Stratosphere, i.e. the layer of air 6 to 25 miles (15 to 50 km) above the
earth’s surface, forms a thin shield known as the Ozone layer. This natural shield acts as a filter,
screening out almost all the harmful ultraviolet rays of the sun, which protects human, plant and
marine life from the UV radiation. Excessive exposure to UV radiation can lead to skin cancer,
cataracts, eye deformation in humans and animals, changes in the chemical composition of
several species of plants and damage to aquatic organisms and fish.
IL.—
r

The substances which cause ozone depletion include:


8H

o CFCs (Chlorofluorocarbons)

o Halons
‘H

o Carbon Tetrachloride
0 Methyl Chloroform
o HBFCs (Hydro bromo fluoro carbons)
\_i

o Methyl Bromide
o HCFCs (Hydro chloro flouro carbons)
“L

Environmental Management and Sustainability Page |84


rt
has—i
© Q LARSEN & TOUBRO

The L&T will avoid all such ozone depleting substances and will create awareness among the
staff and workmen for it.

3.4.20 Avoidance of Nuisance

L&T will take all precautions to avoid any nuisance arising from his operations.

This shall be accomplished, wherever possible by suppression of nuisance at source rather than
abatement of the nuisance once generated.

3.4.21 Public Consultation and Grievance Redress Mechanism

L&T, wherever required, will consult with the affected community before starting work that has the
potential to cause adverse impact, to inform the community and obtain comments on means for
minimizing impact. A Grievance Redress Mechanism (GRM) might be established by the
Employer to receive and respond to complaints from individuals and the general community.

The Grievance Redress Committee (GRC) consists of:

1. Engineer (representative of the Mauritius Light Rapid Transit of Government of Mauritius

/ Construction Management Agency) as Chairman

2. Representative of the local ward

3. Representative of the Contractor and

4. Representative of the Engineer

Public notice of the GRM will be posted at the ward office and construction site in large print on
durable material, stating the purpose of the GRM and phone numbers of persons to contact.

The Employer and the Engineer will maintain a record of the status of any grievances.

3.4.22 Protection of Community Values

0 L&T will protect, conserve and maintain access to social and cultural properties in the

project area including schools, mosques, hospitals, temples, shrines, graveyards, tourism

sites and other public places.

Environmental Management and Sustainability Page |85


Q LARSEN G TOUBRO

o Flagmen will be posted at intersections of transit paths for construction vehicles and local
traffic, and along traffic lanes where work is in progress. Traffic detours will be clearly
marked.

- Blocking access to land, homes and businesses will be avoided; where unavoidable,

temporary access will be provided to affected properties and reinstate permanent access

on completion of work.

- Promptly reinstate any services and reinstall any physical facilities that are cut.

disconnected or damaged during construction activities, and shall maintain or provide

L1,] temporary services that are interrupted by construction. The Engineer shall inspect and

certify the adequacy of all reinstated services and facilities.


“La

3.5 Environment Quality Monitoring

3.5.1 Ambient Air Quality


La

Ambient air quality refers to the background air quality levels in and around project site,
characterised by concentrations of various pollutants in the atmosphere. The presence of
air pollutants and their concentrations depends on the type of polluting sources, and other
factors that influence their flow and dispersion. During construction period, vehicular
emission and construction activities are the predominant source of air pollution. Dispersal
of pollutants depends upon factors like prevailing wind direction and other weather
conditions, height of the source, and characteristics of roadside plantation and presence
of other sinks along the project corridor.

3.5.1.1 Objective:
E*i...i

Monitoring program has the underlying objective to ensure that the intended environmental
mitigations are realized and these results in desired benefits to the target population
causing minimal deterioration to the environmental parameters. Such program targets
[H

proper implementation of the EMP. The broad objectives are:

/ To evaluate the performance of mitigation measures proposed in the DCEMP


à

J To suggest on going improvements in management plan based on the monitoring and


to devise fresh monitoring on the basis of the improved DCEMP
J To enhance environmental quality through proper implementation of suggested

.\

mitigation measures.
/ To meet the requirements of the existing environmental regulatory framework and
community obligations.
- -———__

.
l
_—

"4i~

Environmental Management and Sustainability Page I86


N—n‘
Fl
\-‘
® ® LARSEN a rouano

3.5.1.2 Performance indicator

The significant physical, biological and social components affected at critical locations
serve as the Performance Indicators. Following specific environmental parameters can be
quantitatively measured and compared over a period of time and are, therefore, selected
as specific Performance Indicators (Pls) for monitoring because of their regulatory
importance and the availability of standardized procedures and relevant expertise.

#- Ambient Air Quality with respect to TSP, PM10. CO, 03, N02 and SOz
4» Water quality monitoring (Both Ground Water & water used for drinking purpose)
4. Noise Ievels at sensitive receptors and ambient noise

3.5.1.3 Selection of monitoring location

Principle factors governing the locations of the sampling stations are the objectives, the particular
method of instrument used for sampling, resources available, physical access and security
against loss and tampering. Air quality monitoring shall be done in areas where pollution problem
exists or is expected due to construction activity at site i.e. mainly in dense habitation, community
areas etc.

The location selected monitoring need to be representative of the area, which shall reflect the
concentration of various pollutants and their variation in area nearby project site. In most
circumstances, the principal aim of monitoring is to ensure that the agreed mitigation measures
are being effectively applied, and the impacts upon the local community are minimised. In such
circumstances, monitoring at, or close to, the site boundary is recommended, as this will record
the highest dust emissions. It is also usually more convenient (for reasons of power supply,
security and access) to locate the sampling equipment within the construction site boundary.
Monitoring is also required to measure compliance with the air quality objectives. Under such
circumstances, it will also be more appropriate to site the monitoring station(s) close to the
sensitive receptors (where the air quality objectives/limit values apply) rather than directly at the
site fence line.

The monitoring station should be located at a place where interferences are not present or
anticipated. In general, the following conditions should be met:

1. The site should be away from major pollution sources. The distance depends upon the
source, its height and its emissions. The station should be at least 25 m away from
domestic chimneys, especially if the chimneys are lower than the sampling point; with larger
sources the distance should be greater (VVHO,1977).

The site should be away from absorbing surfaces such as absorbing building material. The
clearance to be allowed will depend on the absorbing properties of the material for the pollutant
in question, but it will normally be at least 30 m.

Environmental Management and Sustainability Page I87


@‘. Q LARSEN & TOUBRO

3.5.1.4 Monitoring duration and Frequency

The Ambient Air Quality Monitoring shall be done at one location continuously for 24 hours and
results shall be analysed. Along the project corridor, the air quality monitoring shall be done at
quarterly intervals.

3.5.1.5 Legislative requirement and standards

The Emission Standards is given in Table 21 and Ambient Air Quality Standards and
Measurement Methods Ambient is given in Table 22. The following standards are maximum limits
for the corresponding pollutant as established by Environment Protection (Standards for Air)
Regulations 1998 GN No. 105 of 1998.

Table 21: Ambient Air Quality from Environment Protection (Standards for Air)
Regulations 1998 GN No. 105 of 1998

m Applicable to Standard
(i) Smoke All stationary fuel burning source Ringelmann No. 2 or equivalent
opacity (not to exceed more than 5
minutes in an eriod of one hour
(ii) Solid particles (a) Any trade, industry, process, 200 mg/m3
industrial plant or fuel-burning
equipment
b) Any existing trade, industry 400 mg/m3
process or industrial plant using
ba asse as fuel
(iii) Sulphuric acid (a) Any trade, industry or process 120 mg/m3 as sulphur trioxide
mist or sulphur (other than combustion
trioxide processes and plants for the
manufacture of sulphuric acid)

(b) Any trade, industry or process 30 000 mg/m3 as sulphur trioxide


in which sulphuric acid is
manufactured

(I'V) Fluorine Any trade, industry or process in 100 mg/m3 as hydrofluoric acid
compounds the operation of which fluorine,
hydrofluoric acid or any inorganic
fluorine compounds are emitted

(v) Hydrogen Any trade, industry or process 200 mg/m3 as hydrogen chloride
Chloride
(vi) Chlorine Any trade, industry or process 100 mg/m3 as chlorine

Environmental Management and Sustainability Page |88


G LARSEN a. rouano

m Applicable to Standard
(vii) Hydrogen Any trade, industry or process 5 ppm as hydrogen sulphide gas
sulhide
(viii) Nitric acid or Any trade. industry or process in 2 000 mg/m3 as nitrogen dioxide
oxides of nitrogen which the manufacture of nitric
acid is carried out

(ix) Nitric acid or Any trade, industry or process 1 000 mg/m3 as nitrogen dioxide
oxides of other than nitric acid plant
nitro en

(x) Carbon Any trade, industry or process 1 000 mg/m3 as carbon monoxide
monoxide

Table 22: Ambient Air Quality Standards and Measurement Methods from Environment
Protection (Standards for Air) Regulations 1998 GN No. 105 of 1998

Ambient Pollutant Standard Averaging Time


(uglm3)
Maximum

Total suspended particles 150 24-hour


50 Annual average

PM10
Sulphur Dioxide 350 1-hour

200 24-hour

50 Annual average

20

Carbon Monoxide 25 000 1-hour

10 000 8—hour

3.5.1.6 Ambient Air Quality Monitoring locations

At present, the construction activity is predominantly in priority section (Stage 1 — Rose Hill
Interchange to Victoria Interchange). Hence, the air quality monitoring locations for the priority
sections are as follow:

Environmental Management and Sustainability Page |89


l9.

9 LARSEN & TOUBRO


H—

m
'L
,

Rose Hill 13+200 20°14'39.09"S


57°28'33.32"E
É

AAQ 2 Pre-Cast Yard 16+450 20°13'12.17"S


57°27'31.79"E
20°12'27.34"S
57°27'14.43"E
20°11'30.93"S
~

57°27'46.70"E
GRNW—ô 21 +250 20°11'0.56"S
57°28'13.34"E
Camp Chapelon 22+450 20°10'40.41"S
‘t—n

57°28'50.06"E
20° 9'47.76"S
57°29'40.42"E
Ë—n

V

Based on the baseline and subsequent ambient air quality monitoring locations. future air quality
monitoring (frequency: quarterly) will conducted at the locations were construction activity takes
L
P

place and minimum one sample at every 5 km. The details of the monitoring locations in
nonpriority sections will be updated when work starts in these sections. The same shall be
updated in the future submission of DCEMP.
H

The environmental monitoring agency will be Air Monitoring Unit of Mauritius Cane Industry
La
ll

Authority (MCIA). They will conduct the Environmental Monitoring for the project.

3.5.1.7 Ambient Air Results


i—I

Environmental manager will analyse the results of environmental monitoring against the
prescribed standards. If the results of monitoring exceeds the prescribed limits then he will
H

conduct a site inspection, identify the contributing factors and accordingly will develop an action
it.
at

plan to minimise the impact.


H
î

After putting the control measures in place, he will again get the environmental monitoring during
â
y

next quarterly ambient air quality monitoring cycle and review the results in that location in order

to check if the concentrations of parameters are within the limits or not.


H
o
ç,
n

The result of monitoring shall be submitted to employer along with the Monthly EHS Report.

La

3.5.2 Water Quality Monitoring


i

3.5.2.1 Objective
H

The principle objective of the water quality monitoring is to assess the water quality of water
—h

resources available at or around project site being used for different purposes. The monitoring
à

gives an idea about the impacts of the construction activities on these resources and prepare an
action plan to maintain them within the standards prescribed under rules, The principle objective

Â

of water quality monitoring is to:


—'

5r

Environmental Management and Sustainability Page |90


H
i
——
B
@ Q LARSEN G TOUBRO

'\ Identify if water quality problems are occurring as the result of construction activities.
/ Demonstrate compliance with legal and other monitoring requirements including the water
quality criteria and/or targets for the project.
f Provide safe drinking water and meet other use based requirements

3.5.2.2 Reconnaissance survey

L&T shall carryout reconnaissance survey to identify all available water resources who are likely
to be impacted due to proposed construction. This survey will give an overview of the geographical
location of the water body to be monitored, its accessibility all kind of human influences to decide
appropriate sampling location and appropriate number of sampling locations. The survey may
include acquisition of following information:

Location map
Background information on water body
Construction activities around the water body
Identification of potential polluting sources or activities
Competitive users
Guidance on existing water quality as obtained from secondary sources
\\\'\'\\

3.5.2.3 Site Selection Criteria

The sampling site selection is generally linked with water quality monitoring objectives. For
example if the monitoring is carried out for judging suitability of water for drinking water source
then the monitoring site should be closer to the intake point whereas for outdoor bathing it should
be near bathing locations.

After understanding the factors affecting water quality thoroughly, it is necessary to select specific
reaches or areas of the stream or river to sample.

After assessment of the factors affecting water quality, L&T shall identify certain stretches of the
river or streams to sample. Accordingly, water quality monitoring sites will be selected keeping in
view following:

»/ All samples shall be representative, which means, means that the determinants in the
sample must have the same value as the water body at the place and time of sampling.
\/ Downstream locations from the construction sites shall be assessed.
f Samples shall be preserved, as required

Since, there is neither any use of ground water in project activity nor the discharge from
construction activity or workmen camp is being done on ground. in addition, there is no borewell
or any dug well or groundwater withdrawal sources falling along the project alignments. Hence,
there is least probability of the ground water contamination due to project activity. Therefore,
ground water quality monitoring may not be required for this project.
However, we will be continuously monitoring the tap water (source: CWA) which is being used at
various workmen colony and construction sites for drinking purpose.

Environmental Management and Sustainability Page |91


1..”
Q LARSEN a TOUBRO

3.5.2.4 Surface water Quality Monitoring Locations:

The objective of water quality monitoring is to assess, if the construction activities is causing any
impact on the water quality of these water resources or not. Therefore, the monitoring location
has to be selected keeping in view the impacts likely to be caused by construction activities.

A reconnaissance survey is being carried out to identify the existing surface water bodies within
and nearby project area, who will be selected for assessment of water quality.

The details of all surface water quality (SWQ) monitoring locations identified for pre-constructl'on
surface water monitoring programs to establish baseline water quality in upstream and
downstream environments has been shown below:

Name of Nearest Chainage to Distance from All nment . .


g Latltude Longltude
i.

1 1+550/ Victoria
SWQ 3 Avenue (Quatre 20 meter (Downstream) 20°15'23.38"S 57°28'38.52"E
Bornes)
SWQ 4 12+700/ Rose Hill 450 meter (Parallel) 20°14'46.74"S 57°28'49.08"E
SWQ 5 21 +550/ GRNW 500 meter (Downstream) 20°10'38.66"S 57°28'23.17"E

SWQ 6 21+900/ GRNW 500 meter (Downstream) 20°10'31.59"S 57°28'32.77"E


A

swo 7 24+750’CaUda" <20 meter (Parallel) 20° 9'47.39"s 57°29‘40.65"E


l

Waterfront
h

Based on the baseline surface water quality monitoring locations, future surface water quality
monitoring (frequency: quarterly) will conducted at the locations were construction activity takes
place.
l
Ë

3.5.2.5 Wastewater Quality Monitoring location and Frequency:

The wastewater generated at site due to operation of labor camps, site offices etc. shall be
temporarily collected in underground tanks and it shall be disposed off through local municipality.
The L&T has constructed a sewer line to discharge the sewage from workers camp to main sewer
"l

line, which will be ultimately treated by Wastewater Management Authority (WMA) at Sewage
a Jl
r.
m:

Treatment Plant.
H

There will not be any open discharge of sewage from the workmen camp, but in case, effluents
are required to be discharged in any water stream, quality of waste water will be tested to confirm
whether it meets the requirement of effluent discharged standards as prescribed under effluent
H

discharge regulations or not.


,
6
————hh

As on date, there is no such plan to discharge any wastewater into inland water bodies or any
H
“l

surface water body. If there is, any change in that, it shall be communicated to the Mauritius Metro
Express authority with detailed of such locations and wastewater quality-monitoring plan.
l

H
l ‘

Environmental Management and Sustainability Page |92


i
I“
———

\u.‘
@ Q LARSEN a rouno

3.5.2.6 Ground water Quality Monitoring:

Ground water quality monitoring shall be done in order to assess the existing water quality. In
addition, it will help in assessing the impact on water quality due to project activities by comparing
the results with the background water quality results.

As Groundwater is not used in project activity which can lead to its depletion or change in water
quality. In addition, there will not be any discharge of wastewater on any surface water bodies or
barren land, which can deteriorate the aquifer by percolation of wastewater. Therefore, this plan
may not be required for the project. However, if there any such complain or requirement by
stakeholders, L&T will do a ground water monitoring.

3.5.2.7 Drinking water Quality Monitoring:

Drinking water is being supplied at site offices and to labour camp. L&T will ensure that the water
supplied for drinking meets the requirements as per prescribed standardsNVHO drinking water
standard and is fit for drinking.
The temporary offices, workers colony and other establishments drinking water quality monitoring
will be submitted along done on quarterly basis.

3.5.2.8 Sampling_Frequency

The water quality monitoring shall be done on quarterly basis.

3.5.3 Noise level Monitoring, locations and frequency

The noise level monitoring shall be carried out keeping in view:


1. Ambient Noise levels
2. Noise generated from construction operations
3. Measurement of equipment noise

3.7.3.1 Ambient Noise level monitoring


Existing (or background) noise levels serve as a reference or benchmark level to which a
comparison can be made with noise levels associated with construction operations. Background
levels include noise contributions from all sources and may be the result of normal neighbourhood
activities and noise generated by traffic on local transportation facilities.

3.7.3.2 Selecting Measurement Sites and Periods


For the purposes of evaluating construction noise, noise measurement sites generally are
selected as close as possible to the location at which noise impact evaluations are planned. In
addition, the care shall be taken to avoid any activity, which is not a part of routine activity and is
making significant contribution to the ambient noise levels. It is important to recognize that sites
selected for evaluation of potential construction noise impacts may or may not be the same as
sites selected for evaluation of noise impacts resulting from the operation of vehicles on the
project site

Environmental Management and Sustainability P‘age [93


9 LÀRSEN 6 TOUURO

3.6 Checking and Corrective Action

3.6.1 Performance Measurement and Monitoring Controls

At all times, keep work areas free of hazards that could affect the Environment and worker's
healthl.
It will be accomplished by ongoing monitoring of the worksite by the EHS Manager and
site personnel.

Once a month, Supervisors or EHS Manager will conduct an Environment Inspection of their
areas along with client representative to identify and rectify any hazards. The procedures for these
inspections will be as follows:

0 Tour the individual worksite, observing work critically in terms of what is being done and
the Environment or physical conditions.

0 Any unsafe act/conditions observed will be documented on the checklists along with
corrective measures taken to rectify the situation.

0 Completed Inspection Checklists will be submitted to Project Manager.

3.6.1.1 Non Compliances

When products, materials, equipment or work practices are identified as not complying with
Environment requirements, they will be brought to the attention of the Site Environment
Committee or Project Manager who will rectify the issue. Where rectification is not straightfonrvard,
the Project Manager will resolve the issue.

3.6.1.2 Project Environment Records

The onsite Environment Representatives maintains Project Environment Records. A master-filing


list of these records is produced and kept with the records. Filed records will be protected from
damage or deterioration and stored in a manner whereby they can easily be retrieved.
3.6.1.3 Environment Reviewl Audit

_p__—LPurose
and Scoe

Purpose and scope of Environmental audit is to assess potential risk, liabilities and degree of
compliance of construction Environment, health and environmental plan and its supplementary
procedure.

Project manager holds the ultimate responsibility in ensuring implementation of EHS audit
program dun'ng the construction work.

The Project manager shall ensure that audits of all the activities detailed in his Site Environmental
Plan are carried out at such intervals as the Engineer may require ensuring the continuing
effectiveness and compliance with the Construction (Site) Environmental Plan.

Environmental Management and Sustainability Page |94


® Q LARSEN a. rouano

The project EHS head along with EHS team members and respective site in—charges will perform
Internal Monthly Audit. The audit team will use their observations noted in evaluating the points
to be awarded against each of the elements of the audited section. Wherever some topics are not
applicable, the score rating will not be given.

R_p_eort

The Audit report will be shared with management, EHS team and concerned site in—chares. The
same shall be discussed in detail at the monthly EHS committee meeting in order to ensure that
any corrective actions are agreed upon.

External audits

The Mauritius Light Rapid Transit of Government of Mauritius / Construction Management Agency
/ Engineer may conduct External Audits of the L&T’s Site Environmental Plan and its effective
implementation on the works site. During the audit, suitably qualified staff will be assigned to
accompany the auditor.

3.6.1.4 EHS Committee

All employees should be able to participate in the making and monitoring of arrangements for
EHS at their place of work. The establishment of site EHS committees in which L&T and sub—
contractor management are represented can increase the involvement and commitment of
employees. The L&T shall ensure the formation and monitor the functioning of L&T EHS
committee.

3.6.1.4.1 Terms of Reference:

The Terms of Reference for the committee shall be as follows:

o To implement company EHS policy and practices.

0 To monitor the adequacy of the EHS plan and ensure its implementation.

0 To review EHS training.

c To review the monthly EHS report.

0 To identify probable causes of accident and unsafe practices and to suggest remedial
measures.

0 To stimulate interest of Employer and workmen in safety by organizing safety week, safety
competition, talks and film-shows on safety, preparing posters or taking similar other
measures as and when required or as necessary.

Environmental Management and Sustainability Page |95


® Q LARSEN G TOUORO

0 To go round the construction site with a view to check unsafe practices and detect unsafe
conditions and to recommend remedial measures for their rectifications including first-aid
medical and welfare facilities.

0 Committee team members should perform a site inspection before every committee
meetings and to monitor EHS inspection reports.

0 To bring to the notice of the Employer the hazards associated with Environment under the
use, handling and maintenance of the equipment used during the course of building and
other construction work.

0 To suggest measures for improving welfare amenities in the construction site and other
miscellaneous aspect of safety, health and welfare in building or other construction work.

0 To look into the health hazards associated with handling different types of chemicals and
other construction materials and to suggest remedial measures including personal
protective equipment.

0 To review the last safety committee meeting minutes and to take action against
persons/sub-contractors for non-compliance if any.

0 The EHS Committee shall be constituted and notification regarding the same shall be
communicated to the members and employees.

0 The EHS committee meetings shall be conducted with the minimum members listed
below.

Table 23: Members of the meetings of EHS committee.

ù i. Environment/Sustainability Manager
ii. Health and Safety Officer
iii. Construction Managers
iv. Departmental Head
v. LNT Sub-Contractors Representative
' Workers Reresentative

3.6.1.4.2 Mechanism to achieve Term of Reference

To achieve above terms of reference EHS committee shall meet once in a month and discuss in
detail all the issues related to the above term of reference and in turn take decision to bring down
any hazard/aspect to low risk/impact level within given time frame.

Environmental Management and Sustainability Page |96


© @ LARSEN l TOUBRO

3.6.1.4.3 Agenda

The Secretary shall circulate the agenda of the meeting in advance of the scheduled date of the
meeting to all members.

The agenda should broadly cover the following:

Confirmation of minutes

Chairman‘s review/overview of site EHS performance / condition

Previous month EHS statistics

Incident and Accident Investigation l dangerous occurrence / near miss report, if any

Site EHS inspection

Sub—contractors’ EHS issues

Report from Employer

Matters arising

Any other business

3.6.1.4.4 Minutes of the Meeting


The Minutes of the meeting shall be prepared as per the format Minutes of Monthly EHS
Committee Meeting and circulated to all the members.

Environmental Management and Sustainability Page |97


vi
. ® LARSEN G TOUBRO

4 0&M ENVIRONMENTAL MANAGEMENT PLAN


‘w

4.1 General
LARSEN & TOUBRO LIMITED (L&T) will be comply with the Annexure 2. Part 1, (Environmental
Management and Sustainability Requirements) which describes the minimum requirements with
respect to 0&M Environmental Management Plan as mentioned in the Annexure 2, Part 1.

The initial draft 0&M Environmental Management Plan will be submitted to the Employer no later
than eighty-four (84) days prior to the anticipated Time for Completion.

Further L&T shall develop and update the draft 0&M Environmental Management Plan to ensure
it details, as a minimum, the following:
i. Specific environmental impacts of the future 0&M Activities; and
ii. Compliance with the Contract, all Law, all relevant approvals and all relevant Codes and
Standards.

L&T shall update the draft 0&M Environmental Management Plan in accordance with the
requirements of Annexure 17 (Contract Management) — Attachment 1 (Project Plan
Requirements).

4.2 Requirements

The L&T Shall ensure the draft 0&M Environmental Management Plan includes the following
minimum details:

0 measures to facilitate the achievement of the environmental objectives and performance


requirements of the future 0&M Activities, which include, as a minimum:
a. compliance with all environmental Law relevant to the future 0&M Activities and the
Contract;
b. address environment related community issues arising from the future 0&M Activities;
ensure no events of material or serious environmental harm occur;
.0

d. achieve the environmental objectives and performance criteria specific to the future 0&M
Activities;
e. ensure requirements to achieve best practices for future 0&M Activities are met; and
f. comply with all relevant environmental approvals;

0 recommended roles and responsibilities, including:


a. details of the roles and responsibilities of Employer’s Personnel responsible for
environmental management and the implementation and future development of the draft
0&M Environmental Management Plan; and
b. details of how the Employer can demonstrate commitment to environmental management
and due diligence under Law;

0 recommended monitoring and reporting which, as a minimum:

Environmental Management and Sustainability Page [98


u—J
w

w-
_‘
© 62 LARSEN a. rouano

identifies and details any ongoing monitoring required to assess the performance of the
System against the environmental objectives, performance criteria, mitigation measures
and requirements of Law;
includes details of the Employer's monitoring activities for future 0&M Activities, such as:
i.a description of the monitoring methodology, frequency and monitoring locations
consistent with the monitoring locations used during the Works and thereafter
during the performance of the future 0&M Activities;
ii.the system for reporting results of monitoring to enable assessment against the project
objectives and performance criteria and relevant approvals; and
iii.how the Employer will undertake monitoring in accordance with relevant Codes and
Standards; and
develops a reporting structure for the Employer to ensure that the Employer receives all
relevant environmental monitoring and auditing reports and details of non-compliances
and preventative actions, on a monthly basis or such other period as requested by the
Employer;

communications and stakeholder management in accordance with Annexure 13, Part 1


(Communications and Stakeholder Management Requirements);

surface water and groundwater management which. as a minimum:


a. identifies the impacts of the future O&M Activities on groundwater and surface water and
details mitigation measures to avoid or minimize the impacts;
b. develops a monitoring program of groundwater and surface water during the performance
of the future 0&M Activities; and
develops a storm water drainage maintenance and monitoring program including any
water storage and water quality improvement devices;

terrestrial and aquatic ecology protection which, as a minimum:


a. details the monitoring and maintenance to be undertaken in areas rehabilitated throughout
the duration of the Contract to ensure such areas are appropriately stabilized and
established;
includes a weed management strategy for the effective management and control of
declared and noxious weeds within and emanating from the Site; and
includes a strategy for the effective management and control of vermin and pests within
the Site;

contaminated land and acid sulphate soil management which, as a minimum provides:
a. details of ongoing monitoring and maintenance to contaminated lands areas disturbed
throughout the duration of the Contract;
b. details of ongoing monitoring and maintenance to areas disturbed as a result of the Works
containing acid sulphate soils or potential acid sulphate soils; and
details of remediation procedures for instances of soil Contamination during the future
O&M Activities;

noise and vibration attenuation strategy which, as a minimum:

Environmental Management and Sustainability Page |99


l

' r'

Q LARSEN à TOUBRO

a. details the key future 0&M Activities and the input or actions required the Employer, and
any other relevant entities;
b. details the noise generated by the LRV wheel to rail interface;
c. details the Codes and Standards that shall be used throughout the process;
d. details processes to adequately manage noise impacts associated with the future O&M
Activities in accordance with relevant Codes and Standards and any conditions of relevant
environmental approvals; and
e. details processes to adequately manage vibration impacts associated with the future 0&M
Activities in accordance with BS 7385.1 :1990 and BS 7385.2:1993 and any conditions of
relevant approvals;

- air quality control which, as a minimum includes measures to ensure compliance with
acceptable emission constituent levels in accordance with the Environment Protection
(Standards for Air) Regulations 1998;
\l
L

- chemicals, fuels and hazardous materials management, which, as a minimum:


a. details containment measures and clean up procedures for spillage of fuels and other
E—fl

hazardous materials, including provision for access and egress of emergency vehicles;
\

and
b. details a hazardous materials register, including storage location, storage requirements,
spill kit locations, proper usage, handling information and disposal procedures;
:

0 waste management which, as a minimum:


à

a. details the measures to minimize and mitigate impacts from waste generation arising from
t.

the future 0&M Activities;


b. details a waste register for future 0&M Activities, waste transfers and location of waste
receptacles; and
c. lncludes recycling management strategies detailing recycling measurements,
sustainability targets and recording and reporting requirements.
l
n.

I
g
1,“—
“a,
l

Environmental Management and Sustainability Page I100


w l‘y
F-

ü

© 6 LARSEN à TOUBRO

5 ENVIRONMENTAL INCIDENT MANAGEMENT PROCEDURES

LARSEN & TOUBRO LIMITED (L&T) will be comply with the Annexure 2, Part 1, (Environmental
Management and Sustainability Requirements) which describes the minimum requirements with
respect to 6 Environmental Incident Management Procedures as mentioned in the Annexure 2,
Part 1.

L&T will be develop, implement and maintain environmental incident management procedures for
the duration of the Contract.

The environmental incident management procedures will be aligned with the requirements set out
in Annexure 3, Part 1 (Safety Management Requirements) of the Employer’s Requirements.

L&T will be develop, implement and maintain Environmental Incident Procedure. This procedure
shall include as a minimum the following details:

a) the risks identified in the environmental risk register for the Works and the future 0&M
Activities;
b) preventative and mitigation measures for avoidance or minimisation and management of
identified risks;
0) categorisation of the seriousness of environmental incidents to detail the appropriate level of
response and delineation of roles and responsibilities;
d) consistency with the integrated incident response and communication arrangement and
procedures between L&T, the Employer and other relevant Government Authorities;
e) the composition of an integrated environmental incident management team with detailed
responsibilities of key L&T’s Personnel; and
f) Contact details of the environmental incident response team including both internal and
external personnel to the Project.
g) Equipment and materials details of the environmental incident response team such as fire
extinguishers, emergency telephones or alarm systems.

Accidents or near misses will be dealt with using Environment Procedure “Accidents Incidents
Reporting”.

Where there has been an accident, a near miss or other non-compliance, the Project Manager,
in conjunction with the EHS Committee if applicable, will review the appropriate controls.

All accidents/incidents, which may have had significant potential, will be investigated as soon after
the event as possible. “Accident/Incident Investigation Report", summarizes the accident and
incident investigation and reporting process.

All exceedances and breaches of relevant environmental Law or conditions of environmental


approvals shall be investigated by the Project Manager, in conjunction with the Environment
Committee and notified to the Employer and other relevant Government Authorities in accordance
with the conditions of environmental approvals and the Law.

Environmental Management and Sustainability Page |101


G LARSEN 4l TOU‘RO

If L&T becomes aware of any material or serious environmental harm as defined under the
Environmental Protection Act (1994) will be immediately notify" the Employer and follow all
directions of the Employer.

Environmental Management and Sustainability Page |102


© Q LARSEN & TOUBRO

6 SUSTAINABILITY MANAGEMENT PLAN

6.1 Purpose & Scope of the Sustainability Management Plan

The purpose of this Sustainability Management Plan is to develop a roadmap for enhancing L&T's
sustainability program & Meeting the sustainability requirement of the project through
collaboration with stakeholders. The process includes creating a common vision, selecting focus
areas for improvement, and establishing meaningful goals, key performance indicators and
metrics for measuring progress.

This document provides a detailed understanding of sustainability approach in a structured


manner for each phase of Mauritius Metro Express Project. Each department within L&T is
responsible for reviewing and understanding the sustainability Proposal presented in this
document.

L&T will employ a suitably qualified Sustainability Manager throughout the duration of the
Contract. Key roles and responsibilities for L&T staff of environmental & sustainability are
provided in the Environmental Management System (EMS).

_Q_Scoe:
This Sustainability Management Plan (SMP) facilitates the identification of key sustainability risks
and opportunities and the development and evaluation of sustainability performance.
Performance and innovation are tracked and measured through the sustainability requirements,
targets and objectives outlined in this plan.

The updated Sustainability Plan will addresses the following:

0 Sustainability objectives of the project, relevant to both the Design & Construction phases
and the Operations & Maintenance Phase;
0 Development of a climatic change strategy that includes the systematic identification and
assessment of potential risks to the project and incorporate adaptation measures into the
project activities to minimize significant risks from climatic change.
0 Monitoring the sustainability performance
0 Reviewing the results and developing a strategy for improvement

6.2 Sustainability policy Statement

L&T has identified a need to formally address sustainability and establish a plan for systematic
implementation. A written sustainability policy (Figure 12) provides the basis for employees and
the public to understand the project's commitment towards a sustainable development as the
organization changes and new conditions develop, the policy statement should be reviewed and
updated to reflect the desired objectives.

LARSEN & TOUBRO LIMITED (L&T) will comply with the Annexure 2, Part 1, (Environmental
Management and Sustainability Requirements) which describes the minimum requirements with
respect to sustainability of all of the Works.

Environmental Management and Sustainability Page I103


Sustainability Policy

At Larsen 8. Toubro, we are committed to fulfilling our economic,


environmental and social responsibilities while conducting
business. We will conserve natural resources and enhance social
equity to achieve sustainable growth while serving all our
stakeholders
“by?”

Towards this we shall.

- Incorporate environmental and social considerations in our


busmess operations

- Reduce adverse impact of climate change, augment energy


efficiency and promote renewable energy usage

- Foster .a culture of trust and caring to enhance safety and


well-being of employees

- Continue to ensure good governance, ethics and transparency


in our en a em_ents With stakeholders, and advocate
responSIb e usmess practices

- Partner with communities towards social interventions in the


identified thrust areas

- Adopt sustainable and resource efficient processes and


provide value added products and services

’ 'I
.

' v
v ‘ ‘-‘

oi. m w Li
'_-__—b———

A M NAIK
20“ November. 2014 Ginny Flu .lln‘ Chaim .m
(yard/«a.
“n‘a;

LARSEN & TOUBRO


Q LARSEN ä TOUBRO

Figure 13: Project Specific Sustainability Policy

. .p...‘;..'.au "ah-.1;[ara—z:.4, Mm:.1'r:'~..r~:uga.‘t...aa,..... ..


v

.
Œ'“LE:

inability Policy Û
PU f), o
E @L-v.1.v.-""-
ana;

LAT mm» a” mm k: W11 Ina m. comm-mm: and moa-

nnmubO-WIOIWWJEW Propel Waatnvaiodalhnrauam salut-on:

omobywmmmmwwm che‘mmmmbr

NWdNWhmmmmmœmhMm

h‘wandm

n u Imponam to un to mm the mal. cannon»: and mm: me! d Mambo:

Mono Express Propel in everything wa do and our Wt to anaumg mat summum


mœmodumalpnaudpœpclwammduœflactadhnupdwm

Toward: mua w. M,

0 Ensure compliance woth statutory and omet wobble requirements

- Incorporate Emnronmental and Soael Canwemhon In propel muchas-dalton

o Dalavar gusts-tuba. growth Mule satisfying Our macal. log-I and mm


obugahons

a Impwve resource efficiency. suns-name oonaunphon and production tumghom the


design and construction actmty

o Drsposa o! wasla thoughtfully. and develop an annude of ‘reduang, twang recyd-ng


and recovery '

c Encourage ideas and mnovabon mentally and with our 3mm. m can
create financml ct raaouroa savings and bend! to out chant moiety and ml

o Reduce adverse impact o! climate mange. augrnem energy emuency and pmrnotc
ranewaboe energy usage

o Partner with community Inward: tonal ntarvanhona n‘ ma Identified um amas.


ptolectmg ml. cultural and mm values.

- memwmmmtflmudbywvgmmwmymand
sew-cos.

\ /'

Data 29/08201 B
Pr or

MLRULM/POUGH/oz/Revoo G LARSEN & TOUBRO

Environmental Management and Sustainability Page I105


i


Q LARSEN a TOUBRO
—1

The Sustainability policy will be displayed at prominent locations and will be used in EHS
—i
f

meetings, trainings and other opportunities as and when identified.

6.3 Focus area for Sustainable Development


d
,7

L&T has identified following areas to focus on from where objectives and targets shall be derived
for a sustainable development:
2‘
—l

Energy efficiency & Green House gas emissions


Climate Change Strategy
Use of sustainable material
Water usage reduction
Waste management
\\\\'\

6.3.1 Energy Efficiency & Green House emissions


6.3.1.1 Energy Efficiency

Energy requirement is key component in construction industry. Construction industry, by its nature
comprises of various small sectors inside and includes:

V", Transportation of both personal and material

V" Manufacturing, fabrication, pre—cast yards, batching plants

V/ Residential facilities like site offices, guesthouses, workers colonies etc.

The statistics in Figure 13-16 shows that industrial and transport sector consumes the majority of
the energy generated, followed by residential.

Figure 14: Sector Wise Energy Consumption Pattern in Mauritius

Agriculture Other
05% 0.5%

Household
Commercial and 14%
Manufacturing
Distributive 22%
Trade
10%

Transport
53%
-_ —_ _ _ _ _

Source: Energy and Water Statistics — 2016, Govt. of Maun‘tius


l

*—_— — — —_— — —
l

I ] Environmental Management and Sustainability Page I106

I'l
Ga LARSEN a TOUBRO

[j
ure 15' Semctor wise ener consum tion Pattern in world
Industrial ITramport I (‘ommcrcinl
('/

5L

‘Ïv;
Consumption

.5æ‘:b‘\%“
Q Q\"n."'h
Q —“ a” o
\°\\“q\æxæ\æw°æw°w°°%° œêw“
Ycur
Source: A Comparative Analysis on China 's Energy Issues and CO2 Emissions in Global Perspectives by Md Sahadat Hossain,
Baizhan Li, Sanjib Chakraborty. Md Rubayet Hossain, Md Toufiqur Rahman

Although the advancement in technology and science has explored alternatives of traditional
sources of energy, still the major contributor in energy production is the petroleum fuels, coal
followed by nuclear and renewable energy. Figure below shows the percentage contribution of
different sources in energy generation.

Figure 16: Percentage Share of Energy Sources in the Electricity Production in 2016,
Mauritius

Gas Turbine
(kerosene)
0.1%

' -' Diesel &g Fuel 017|“


' '_3.6~52./-‘i ; Immense
Renewables
21.8% 16.3%

Landfill gas
0.6%
................

Photovoltaic
1.0%
Source: Energy and Water Statistics — 2016, Govt, of Maun'tius

Environmental Management and Sustainability Page I107


‘-
Ë;

5i

"h
@‘T‘s
Î
Q LARSEN & TOUBRO
_

LL
_

Figure 17: Percentage Share of Energy Sources in the Electricity Production (Globally)

Q
2501N) 25000
L.

un l mu" .‘ '" “'9 ’ i ‘3' ,m ' {H’s-ll


_

Remnahlr \—' . au." ~l it) _,,,_«t~.2p,_,, Actual Projected


\ ‘» ifil)...‘ + l 15:“, 4141):."
—E

I’m ulium

‘ \‘ 1sz“ in)! l a - it: v l b'»_ , _ - 0.199,,”


.‘ "" - «me a 12.44,m - M} .‘nll
H

N ("me
H

a. L L11
H

_5'«=-
H

—.._
H

_....
_

Source: A Comparative Analysis on China '5 Energy Issues and C02 Emissions in Global Perspectives by Md Sahadat Hossain,
Baizhan Li, Sanjib Chakraborty, Md Rubayet Hossaln, Md Toufiqur Rahman
_

Non-renewable energy, such as the burning of fossil fuels, contribute to local and regional air
pollution that negatively affect public health and the environment. Due to a limited supply of fossil

fuels globally, price variability is common. Conversely, renewable energy sources, such as solar,
geothermal and wind, do not degrade the environment when producing electricity. Renewable
energy sources use emerging technology that often have a higher first cost but provide reliable
onsite electricity
_

In our goal of achieving sustainable development, L&T will focus on energy efficiency as well as
energy saving as core areas and will achieve it by exploring use of renewable energy sources,
_

considering its feasibility and financial aspects.

Since the project has just yet started and lot of facilities are yet to be established. L&T will start

monitoring the consumption of energy by ongoing activities like transportation, D.G sets etc. and
will establish a patter.
The data will be used further for setting up the targets for energy saving.

6.3.1.2 Activities for Reduction in Greenhouse Gas Emissions during Construction


Phase
-

Managing greenhouse gas emissions during construction is important and needs to take into
account energy consumption (such as fuel and grid electricity) as well as embodied energy within
the building products (which takes into account the production of raw materials, manufacture and
_

transport) and the asset lifecycle.


WI

Environmental Management and Sustainability Page |108


@ © LARSEN â TOUBRO

Carbon footprint assessments will incorporate direct and indirect emissions associated with
electricity and fuel consumption on site.
L&T will introduce efficiency measures to attempt to achieve an overall reduction of 5%. Where
viable within the project the following initiatives will be utilized.

0 Use of LED lighting


0 Energy efficient fittings and features for site offices
0 No idling policy for plant and equipment
- Complying with Euro Standards for major plant
0 Innovative materials to further reduce GHG footprint (i.e. warm mix asphalt)
0 Reduction of land clearing where possible (dependent on client approval)
0 Encourage active transport to and from work with end of trip facilities
0 Regular maintenance of all plant and equipment for better efficiency and fuel consumption
0 Reduction in number of trips of vehicles by managing transport facilities.
0 Use of solar lighting to reduce load on conventional sources.
0 Design building orientation to utilize maximum of natural energy.
0 Maintaining approach road conditions to reduce travel time and fuel emissions. Approach
for achieving the targets:
0 Implement recommendations in CDEMP Plan
0 Install energy-efficient lighting and equipment
0 Integrate green building and sustainable development practices—through proper
planning and execution
- Educate and motivate employees on ways to reduce workplace energy use
0 Pursue opportunities for testing and innovation in energy—efficient fleet vehicles
0 Address energy efficiency in all site operations

Wag.i”aliin‘ia7... M1 and
mm"
.
'

6.3.2 Climate Change Strategy


Climate change is on the forefront of construction industry discussions because of the eloquent
consequences that affect the projects lifecycle, so the construction sector has to be more
efficacious and tackle challenges. Excellence in project management is achieved through a
structured process that includes a series of phases that a project passes through from its
initiation to its closure or so-called project management life cycle.

This sector is affected in many ways by climate change. Knowledge about short—term weather
and longer-term climate conditions are essential to adequately design and successfully manage
construction projects. When we can no longer predict weather or climate, then construction can
be heavily affected.
Climate change may affect the construction industry through a range of biophysical and
socioeconomic impacts. Long term climate impacts, such as sea level rise, coastal erosion, and
drought, and short term weather related impacts, such as high winds and flooding influence the
choice of site construction, building techniques, and materials for construction. The potential risk
of severe weather and climate conditions also influence planning and project completion
timelines.

Environmental Management and Sustainability Page |109


® 6» LARSEN a TOUBRO

Climate change increases the risks associated with embarking on construction project cycle.
Climate change can affect construction sector directly through weather and climate, but can
also generate indirectimpacts such as site programming, delay, extra expense, workers safety,
material cost. and delivery.

L&T will plan its work in a manner that minimises the impacts of climate change on the project
and continue to meet the needs of employer.

6.3.2.1 Climate Change and project life cycle:

All trends prove that there is a changing in the global climate. Climate change has a strong impact
on the different phases of the project lifecycle. L&T will identify the localized risks of climate
change and preparing their works for the predicted hazards, which may include increasing
temperature, rainfall, wind, mean sea level etc. In order to limit the risks caused by the variations
in sea level, extreme weather events or the rainfall, following strategy will be adopted.

6.3.2.2 Choice of site locations

Change events such as sea level rise, drought, and increased incidence of flooding can greatly
influence the choice of site location. Sea level rise and flooding events can deter the
establishments of low lying or coastal areas.

L&T will set up the site offices, workers camps etc at suitable location, which can sustain the
effects of rainfall, rise in sea level, adverse temperature conditions.

6.3.2.3 Facilitation and Support to Workforce:

The workers in the project are subject to higher risk from increased direct-heat stress,
dehydration and potentially skin related issues, as well as heavy rainfall. Higher temperatures
may restrict the work time hours. Impacts of climate on health and safety of the workforce may
necessitate taking precautions for workers, e.g., construction workers during heat waves.
Increased illness in the population more broadly may affect work attendance or health care costs.
In lower temperatures, workers must wear extra clothing that is often heavy and bulky.
Bulky clothing can restrict movement and increase the risk of accidents.

L&T will continuously assess the climatological conditions and working environment conditions
and provide necessary control measures so that the work is carried out un-interrupted and safe
manner. These includes:

Providing on-site accommodation at site or nearby area.


Provide electricity, water supply (Drinking and potable) at site offices and colonies.
On-site drinking water to engineers and workmen
Regularly keep record of attendance to check the absenteeism pattern
Plan the Work in shifts
Provide proper resting hours during work
Conducting regular health checks of the workforce
Taking feedback from site team for improvement of the system
9°.‘1979’15‘95N7‘

6.3.2.4 Climate Change Consequences on Equipment and Materials:

Dusty conditions may lead to problems for equipment; the filters on vehicles and machinery both
inside and outside should be checked and changed regularly to prevent premature breakdowns.

Environmental Management and Sustainability F‘ 1g e |11O


® Q LARSEN & TOUBRO

Further, cold temperature make a problem with water cooled engines; like people equipment
can acta little sluggish when it is cold. Cold lubricants are not effective and operating equipment
with inadequate lubrication can cause accelerated wear of moving groups.

Most materials are susceptible to water, from concrete and mortar to paint because their strength
and workability are affected by additional water. Material with high water content and those that
depend on hydration or evaporation may not cure properly at low temperature and consequently
result in attaining lower strengths. Moisture can penetrate brick through capillary action and the
action of wind-driven rain, moisture can reach the interior and condense on interior walls, this
can lead to mould growth, deterioration of finishes and potential health problems for occupants.
The paintings works are affected by climate change both performance and application of
surface finishes.

In order to prevent any alteration to quality ad workability of equipment and construction material,
following measures shall be taken:

0 Storing of hazardous material in isolation and safe place under cover and concrete base.
0 Regularly do water sprinkling at locations, which are susceptible to dust generation, e.g
formation work, earthwork, transportation of plant and vehicles on approach road etc.
0 Proper maintenance of plant and machineries for better workability and improved life.
0 Storing cement and other construction material and chemicals under cover to avoid any
impact during heavy rain.
- Conducting regular quality checks at different stages.
- Avoid maintenance and other activities in open, if required; provide necessary spill control
measures to prevent soil and ground water contamination.
0 Avoid working in adverse environmental conditions like heavy rainfall, high wind or storms.
o Regularly cleaning the site office areas, material storage areas etc. to clear any vegetation
growth, which may affect the quality of materials and create unhygienic conditions.

6.3.2.5 Climate Change Consequences on Construction Process

The construction phase is highly weather dependent, which influence the site work
conditions, construction processes, and worker comfort. The effects of climate change cause
slope instability and damage to the embankments, approach road conditions etc. Temperature
is a critical issue in construction process. Concrete is one of the most widely used materials
and relies on setting and curing within certain temperature parameters. The optimum
temperature to cure concrete is 23°C, which gives 80-100% greater strength than concrete, which
has not been properly cured. Structures are designed to have at least a minimum resistance
to the loads that act on the structure and the climate change has consequences in
structure design process.
L&T will do regular tests and checks at all stages to ensure that the quality requirements are met
and quality objectives are achieved.

6.3.3 Use of sustainable material

Sustainable building materials can be defined as materials with overall superior performance in
Terms of specified criteria. The following criteria is commonly used:
c Locally procured and sourced material
0 Transport costs and environmental impacts
0 Thermal efficiency

Environmental Management and Sustainability Page |111


Q LARSEN & TOUBRO

Occupant needs and health considerations


Financial viability
Recyclability of building materials and the demolished building
Waste and pollution generated in the manufacturing process
Energy required in the manufacturing process
Use of renewable resources
Toxic emissions generated by the product
Operation and maintenance costs

L&T through life cycle of project shall adopt use of sustainable material wherever feasible
without compromising the required quality of the product.

6.3.3.1 Use of materials with low embodied energy:

The key indicator of the environmental impact of building materials is provided by the concept of
‘embodied energy'. This is the amount of energy consumed to mine, manufacture and transport
a particular product.

The embodied energy of glass, steel, concrete blocks, bricks etc., or an entire house is
measurable. L&T will ensure that product with low embodied energy is used, this will be achieved
by:
0 Procuring the product locally to minimise transportation cost, manufacturing energy and
air pollution. This also creates local employment.
0 Procuring the material phase wise and as per requirement to avoid additional requirement
of storing, electricity, security, further transportation from storage area to site etc.
- Using demolition waste in filling low areas for preparation of bed, which will avoid
purchasing additional fill material.
0 Use of low VOC paints

6.3.3.2 Use of Recyclable material:

Recycling is an essential ingredient of green building that reduces non-renewable inputs,


especially mining activities, energy use and transportation costs. This includes the use of waste
products and used building materials. It is especially important to reuse environmentally unfriendly
materials that leach toxic materials into the soil and ground water, or release methane into the
atmosphere when dumped in landfills.

L&T will implement control measures for better utilisation of resources and minimisation of waste
through following:

1. Using the concrete waste generated from demolition of buildings and other structures.
2. Minimising the waste generated at site offices and workers colony through awareness and
education to employees and staffs.
3. Segregation of waste material at source eg. metal waste, biodegradable waste, non—
biodegradable waste etc.
4. Properly collecting the waste for its further disposal and recycling through the vendors.
5. Fabricating onsite scrap material to manufacture frames, trenches and other tools required
at site.

L&T will continuously monitor the sustainability requirement of project by maintaining the records
of material procured, waste generated, material recycled and disposed.

Environmental Management and Sustainability Page I112


® Q LARSEN a rouako

6.3.4 Water Usage Reduction


Successful management of infrastructure projects should result in maximized efficiency of
resource use such as water and minimized wastage.

L&T aims to seek ways to improve efficiency whilst also reducing overall potable water usage
throughout the project lifecycle. Where viable within the project the following initiatives will be
adopted:

0 Calculating per capita water requirement and developing facility for storage
0 Install water metering to monitor the water requirement
0 Monitor water consumption at regular intervals and develop a consumption pattern
o Recycled water used wherever feasible
0 Water treated and reused on site where feasible
0 Regular maintenance of approach road to minimize water required for dust suppression.
0 Creating awareness through training and education for efficient use of water among
workers and employees.
0 Inspecting water supply network system for leakage or any other damage.
0 Use of efficient fixtures to minimize wastage of water.

6.3.5 Waste Management


L&T through the implementation of DCEMP will continuously work on minimizing the waste
generated at site. To facilitate this, 3 R approach (i.e Reduce, Reuse and Recycle) shall be
followed. More focus will be given on reducing the waste generation at source followed by reusing
the material.
The concept of 3R shall be implemented at site by:
Procuring the material with longer product life
Procuring material which can be recycled
Reduction in paper waste by modifying the printer settings to perform two side—printing
9!“?

operations.
Passing the instructions to take prints, only if necessary
Instructions for taking black & white printouts and avoid color printing, unless required
Reuse the construction and demolition waste within the project, if feasible
Keeping record of paper purchased and paper waste generated.
Creating awareness among workforce and employees through training and educative
.° ." °’.¢"': -“

sessions focusing on minimizing waste.


Reduction in food and domestic waste from site offices and workmen colonies
0. Keeping record of waste generation, analyzing the data at regular intervals to establish
—\(O

pattern, and preparing further reduction methodology.

GOAL: Reduce overall. wast'e generation

Environmental Management and Sustainability Page |113


® 9 LARSEN 8 TOUBRO

6.4 Carbon Footprint

'Carbon footprint' is used as a generic synonym for emissions of carbon dioxide or greenhouse
gases expressed in C02 equivalents. The carbon footprint will be a measure for the estimation of
greenhouse gases including embodied carbon (GHG's) of all works. The sources of greenhouse
emissions can be separated into 3 scopes.
- Scope 1 (Direct Emissions Sources): all direct GHG emissions from sources under the
institution control. Included is the generation of electricity, heat, or steam from fossil fuels.
Within the institution, this included stationary emissions (natural gas/oil consumption),

I
owned vehicle fleets (machinery and automotive vehicles), fugitive emissions (leakage
from refrigerants in air conditioning equipment).
0 Scope 2 (Indirect Emissions Sources): GHG emissions from the generation of purchased
electricity consumed by an organization. Purchased electricity is defined as electricity that

I 0
is purchased or otherwise brought into the organisational boundary. Scope 2 emissions
physically occur at the facility where electricity is generated.
Scope 3 (Other Indirect Emission Sources): Is an optional reporting category that allows

I for the treatment of all other indirect emissions. Scope 3 emissions are a consequence of
the activities of the company, but occur from sources not owned or controlled by the
company.

I The pictorial representation various scope of greenhouse gas emissions has been shown in
Figure 16 review.

I Figure 16: Type of Green House Gases Emission Sources

I C02 SFG CH. N20 HFCS PFCs

I SCOPE 2
SCOPE 1
mm
SCOPE 3
momscr

I
monta

EMPLOYEE BUSINESS m

I
PRODUCTION OF
PURCHASED
MATERIALS

WASTE DISPOSAL

I 300m
USE comm m

l
OUTSOURCED ACTIVITIES W
H n “‘5
FUEL COMBUSTION

l The L&T will estimating the reporting the energy consumption and greenhouse emissions of
construction activity, which include following:

l
0 Direct Emissions (Fuel consumption)
0 Indirect Emissions (Electricity consumption, embodied carbon in construction materials
such as steel, cement etc)

I
I Environmental Management and Sustainability Page I114

I
@ 9 lARSEN I TOUDRO

6.5 Performance Evaluation and Review

The SMP provides the system to manage and control the sustainability aspects of the project
during design, pre-construction (early works) and construction phases. It provides a reference for
guidance and enhancement of sustainable practises throughout the entirety of the project.

It also provides the overall framework for the system and procedures to ensure sustainable
practises are adhered to and maximised where possible.

For effective implementation of SMP, L&T have developed a management system who will
develop, implement, monitor and review the performance of SMP and accordingly will develop
further action plan for improvement of sustainability performance.

L&T will appoint a sustainability manager who in coordination with Environmental and Safety
manager, will regularly monitor the performance of the SMP through auditing and inspections,
evaluating the statistics recorded for key focus areas, discuss the issues in the Project SHE
committee meeting and develop further strategy for improvement in coordination with project
manager and project director. Their responsibility includes:

S_____y___g_ustainabilit
Manaer

0 Ensuring the SMP is correctly implemented to meet the requirements of the Project;
0 Reviewing and updating the SMP and associated documentation as required to support
the Sustainability Coordinator;
Developing, reviewing and supporting others to implement Sustainability Initiatives
Key role in identifying and approving the finalization of initiatives
Assisting Procurement team in auditing/assessing major suppliers and subcontractors;

F' “.!'" ‘f—"‘E_"F—"


Coordinating the preparation of reports and providing this feedback at construction
meetings
o Reporting to the Project Management Team, The employer and the PMC on sustainability

l" a"
related issues;
0 Provide sustainability advice to the Project Manager and other functional managers to
facilitate design and construction
- Coordinate the preparation of reports on the progress of sustainability initiatives
0 Monitor the progress of sustainability targets and ensure that any required actions are
initiated

_____g_Environment
Manaer

à
o The overall day to day sustainability management of the project together with sustainability
manager,‘
y.

0 Support the sustainability manager to ensure the Project meets objectives, targets as
defined in SMP
- Implement, monitor and review identified sustainability initiatives and develop new
\

initiatives
0 Development and maintenance of the Sustainability Management Plan and associated
documentation including the Project Sustainability Risks and Opportunity Register
0 Monitoring the implementation of sustainability initiatives including product implementation
with work teams to ensure the project is working towards achieving the set requirements
0 Working with the Design and Construction Teams to ensure effective implementation of a
sustainable project
o Reviewing subcontractors' performance to ensure they fulfil their sustainability obligations;

Environmental Management and Sustainability Page I115


© @ LARSEN & TOUBRO

0 Attending Design and Construction or other relevant meetings to discuss and provide
support in relation to sustainability issues and effective implementation to achieve an IS
Rating;
- Collating, compiling, reporting and reviewing data, statistics and records
0 for the respective project areas to support the project to achieve an IS

6.6 L&T’s Corporate Sustainability initiative

L&T’s Sustainability initiative and its response to climate change, GHG emission, water
conservation, energy conservation, reuse & recycle etc. are curated in companies sustainability
report. The L&T is preparing the Sustainability Report annually since 2008, which is available on
L&T website.

7 INDUCTION, TRAINING & AWARENESS

LARSEN & TOUBRO LIMITED (L&T) will be comply with the Annexure 2, Part 1, (Environmental
Management and Sustainability Requirements) which describes the minimum requirements with
respect to Induction, Training & Awareness of all of the Works.

On arrival of any new staff, workers or subcontractor to the project site, he/she will have EHS
induction, which includes site specific environmental and sustainability program, health and
safety. This includes but not limited to site environmental conditions, environmental laws
applicable to the project and statutory approvals, introduction to Projects’ Environmental
Management Plan and its requirements, monitoring procedures etc.
Additionally, the L&T will develop and implement other environmental and sustainability training
programs to educates site in-charges, engineers, planning and other staffs involved in the works
on specific environmental risks, impacts and mitigation measures with the project, environmental
monitoring procedures, Solid Waste Management & Housekeeping, Dust Management,
Hazardous Waste Management etc.

7.1 EHS notice board & feedback method

7.1.1 EHS Notice Board

L&T to fix EHS notice board at all prominent locations like office, site office etc.

EHS notice board shall contain:


o EHS policy
o EHS alert
o EHS circular
0 Safety moment
0 Golden safety rules
0 Emergency numbers
o Other EHS information

Environmental Management and Sustainability Page |116


® @ LARSEN I TOUIRO

7.1.2 Feedback Form

Ill
During safety tool box talk feedback is taken from employees, which serves as a corrective action
for environment, health and safety hazards. Important feedback is also shared with HQ.

7.1.3 Suggestion Box

Employees are encouraged to give safety suggestions and good points are taken up for
implementation. Suggestion box is kept at site office.
7.2 EHS Committee Meeting

Every month, we shall conduct safety committee meeting in presence of Project Director
(Chairman), Project EHS Head, Project Managers construction managers, head (different
departments), sub—contractor and workers representatives. During such meetings, we discuss
various issues escalated at site and target dates will be given for compliance of the same.
7.3 EHS walk clown

Every week, EHS team shall inspect the work site for any issues related to health. safety and
welfare.

The issues will be recorded and will be reviewed at the time of EHS committee meeting and action
plan will be prepared to camp & discussed dun'ng toolbox talk.

7.4 EHS Communication

EHS information or incident information from our project or from other projects will be
communicated through a medium called EHS communication (EHS alert). it will be circulated by
mail, display on notice board/ at workers camp and also discussed during toolbox talk.

7.5 Helmet Magazine

L&T HQ publishes Helmet magazine quarterly, which covers best EHS & welfare practices,
incident alerts and case studies. This magazine will be made available to all employees.

END OF DOCUMENT

Environmental Management and Sustainability Page I117