Sunteți pe pagina 1din 3
x = naginet [AECOM Nile East Lint Az Detvered Poder tai8 Ca Boscing alan Untes iva Emates 1-971 37026600 48 October 208 Messrs. Nael & Bin Harmal Our Reference Hydroexport Est 60222102-ACM-XX-XX-LT-PM- P.O. Box 19602 000295-AAN ALAin Fax No: 03 721 0006 Attn: Eng, Mazhar Adel Idris Project: Construction of New Dairy Farm at Nahil in Al Potable Water Connection for Cow Farm at Nahil ‘Subject: Shop Drawings for General Layout Plan and Section for Transco & AADC Interface Works (Rev. 1) Dear Sirs, We refer to your letters 0772-NBHH-AANDFN-MA-AS, dated 12 September 2018, enclosing the above shop drawing. ‘As instructed earlier, please proceed with the work and incorporate the minor modifications in the as- built drawings for final approval ‘This is for your information and further action Yours Wy Edwin Benedict Resident Engineer ‘AECOM Middle East Limited E: Edwin, benedict@aecom.com Ey SERED sv oany aa ‘Gur Relerence 60222102.ACNIOLXX-LT-PM.C00295.AAN btoaat (Mans bary Fam-PMCNNG. Coesponcence 2 Lets? 22 OugoingiTe Contactor ‘General 111018802221 OF ACME RK AXLT-PMODDZES-AAN Soot Our Ref: 0772-NBHH-CWFM-MAI-AS Date: 12 September 2018 Mis. AECOM Middle East Ltd. PO Box: 1419 AIAin, United Arab Emirates Tel. + 971 3 7026600 Fax +971 3 7554727 FAO : Mr. Edwin Benedict, Resident Engineer Project : Potable Water Connection for Cow Farm at Nahil Subject : Revised Shop Drawings - General Layout Plan _& Section for TRANSCO & AADC Interface Works (Rev.1 Dear Sir, With reference to your letter ref. AAN-NAD-LTR-Y18-00147 dated 27.06.2018 regarding the above mentioned subject, please find attached herewith our revised shop drawing for general layout plan & section for TRANSCO & AADC interface works (rev.1) due to changes in the levels & location of shelter & lagoon as commented by the Transco Engineer during the minutes of meeting held on 12.08.2018 at Transco Al Ain office and in line with TPD approved drawings received via. your letter ref. AAN-NAD-LTR-Y18-00240 dated 30.08.2018 SI. No. Drawing No. Rev. Drawing Title General Layout Plan & Section for TRANSCO | & AADC Interface Works 1. |60427729-PW-ME-GN-01 1 This is for your / Transco kind review and approval ———Thanking you, N sincere for Nael &Bin Harmal Hydroexport Est. ‘Senior Project Manager Enc As above. Form No: QMF 103-3 Rev. 0/ Date: June 1, 2015 Petar LONGITUDINAL SECTION-AA AL AIN FARMS AECOM Middle East Ltd, POTABLE WATER CONNECTION FOR COW FARMAT NAHIL LAYOUT PLAN

S-ar putea să vă placă și