Documente Academic
Documente Profesional
Documente Cultură
THISDRAWNGEPOYF
M/sALJETHORNGICSU
P.OBX:13689,DUAIE
TEL-+97142680FAX35
*ITSNOALWEDRPUC
CONTESIAYFRM.
CONSIDERAUTHWMP
SIGNATUREBYLJHOC
REINFORCEMENT
12
/09
/18
AS PER SCHEDULE
*ANYDISCREPTOBUGH
36
4" THICK FLOOR SLAB WITH
40
37
33 5
MESH A-252 CAST ON
ATENIOFHGRDSLVB
09
47
-4-
POLYTHENE SHEET GAUGE 1000
1
COMENTFAYWRK.
REINFORCEMENT
AS PER SCHEDULE
D.P.C
D.P.P
WHICHEVER IS LOWER
\A1;8"
WHICHEVER IS LOWER
E
SE
SW
NE
8"
NW
N W
MESH A-252
1.0m. min.
SOLID BLOCKS
3 T 10
1 T 10
W
30
30
1.0m. min.
4"
SOLID BLOCKS
\A1;30
\A1;4"
n
i
m
0
.
;
1
A
\
12db
\A1;3"CLEROV
8"
\A1;.0min
8"
4"
\A1;6"
\A1;4"
\A1;2"
T 10 @ 150 c/c
\A1;30
\A1;6"
"
4
;
1
A
\
3" THICK P.C.C.
PLOYTHENE SHEET 1000 GAUGE
4"
\A1;8"
12"
6"
12"
6"
T 8 @ 200
r
o
b
;
1
A
\
4"
4"
\A1;8"
b or 1
\A1;h
"
4
;
1
A
\ \A1;4"
\A1;24"
4"
\A1;2"
\A1;4"
HAUNCHED FOUNDATION
SECTION X-X
24"
TYPICAL DETAIL OF
WALL FOOTING
b
d
2
;
1
A
\
TIE BEAM
X
;
1
A
\
X
X
X
X
\A1;Y
1.0m. min.
SECTION "RC"
12db
\A1;2db
n
i
m
0
.
;
1
A
\ WELL COMPACTED
ROAD BASE
PLAN
\A1;0.3m
RC
RC
REVISD
LAP SPLICE 40 db
0.3m
of SMALLER BAR
EXCAVATION LEVEL
3" max
DONTSCALERWIGYFM.
2"
Client:
\A1;3"max
\A1;2"
4"
\A1;4"
Jobtile:
SLOPE 1:6
\A1;6"
6"
Y
;
1
A
\
at OFFSET)
ADDITIONAL G + M OFFICE
WHICHEVER IS LOWER
WHICHEVER IS LOWER
STRAP BEAM SIZE
PLOT NO. 364-0375
& REINFORCEMENT
AS / SCHEDULE
RA
RA
BLOCK AL QUOZ IND. FIRST
FOOTING SIZE
FOOTING SIZE
rawingtle:D
& REINFORCEMENT
\A1;4"
& REINFORCEMENT
AS / SCHEDULE
1.0m. min.
1.0m min.
AS PER SCHEDULE
STRUCEYPIAL
DETAIL-02
12db
\A1;2db
\A1;.0min
h
;
1
A
\
4"
4"
FileLocatn:-
LOOSE SOIL
\A1;4"
SECTION "RA"
Scale: Date:
Drawnby:
COMPACTED SOIL
COMPACTED SOIL
4"
4"
\A1;4"
"
4
;
1
A
\
AL JETHOOR
Dwg.
(S-03)