Sunteți pe pagina 1din 14

HCPT – HUAWEI

RTN 600 MICROWAVES


INSTALLATION STANDARD

PT. Hutchitson PT PT Huawei Technologies

……………………………………… ………………………………………
Name: Name:

Date: Date:

HCPT 2G & 3G TURNKEY PROJECT


2009

RTN 600 MW Installation Standard 1 HCPT - HUAWEI


1. Antenna Fastness

Key Points Details Description


The antenna must be
installed in the right
height and position and
polarization

The fixation of antenna Each screw should be fastness very well


and pole are reliable

RTN 600 MW Installation Standard 2 HCPT - HUAWEI


For the more than 1.2m antenna, the side strut must be installed and fixed
position is correct.

Antenna identifier
(standard labeling)

Labeling Format:
 Label template :
ANTENNA TO XXX (FE ID)
FAR END NAME

 Font : Black
 Background : White
 Material : Print Label

RTN 600 MW Installation Standard 3 HCPT - HUAWEI


2. ODU Fastness

Key Points Details Description


The ODU's and hybrid
coupler's appearance are Tighten all screw / bolt from ODU to hybrid
properly
ODU Fixing

IF connector from ODU should be waterproofed properly

Waterproofing

The IF connector of ODU


should be waterproofed
and face downward

Waterproofing

RTN 600 MW Installation Standard 4 HCPT - HUAWEI


The ODU grounding
cable should be shortest
length as possible and
attached to bus bar

ODU Grounding

Grounding connection
to bus bar

RTN 600 MW Installation Standard 5 HCPT - HUAWEI


ODU Identifier (ODU
labeling)

Labeling Format:
 Label template :
ODU1 TO XXX (FE ID)
FAR END NAME

 For 1+1, mark ODU1 for main ODU and ODU2 for stand by ODU
 Font : Black
 Background : White
 Material : Print Label

3. IF Distribution

Key Points Details Description


In general, the IF cable IF grounding kit installed between concurrence HCT and VCT
should be grounded to a Tower
minimum of one point

Recommended point to
install IF grounding kit

RTN 600 MW Installation Standard 6 HCPT - HUAWEI


2 end are tidy with cable tie

Tidy up with cable tie

IF grounding kit should connect to lower VCT bus bar.

Grounding kit
connect to bus bar

Leave enough slack when IF redundant no more than 2 meters


connecting cables to the
ODU to facilitate future
maintenance

IF redundant no more
than 2m

RTN 600 MW Installation Standard 7 HCPT - HUAWEI


IF cable must be up tilted
Right position for hole IF cable route
or have Waterproof curve
in the entrance of
porthole

Porthole connection should be waterproofed

Cable Installation and end


Proper installation for IF
to end labeling cable and separation with
GND cable

RTN 600 MW Installation Standard 8 HCPT - HUAWEI


IF cable labeling / IF cable should have identifier / labeling on top near connector of
identifier ODU and IDU

Outdoor IF Labeling Indoor IF Labeling

Outdoor labeling: Indoor labeling:

Labeling Format:
 Label template :
IF 1 TO XXX (FE ID)
FAR END NAME

 For 1+1, use mark IF1 for main IF and IF2 for stand by IF
 Font : Black
 Background : White
 Material : Print Label, Label flag, cable ties, IF cable label

RTN 600 MW Installation Standard 9 HCPT - HUAWEI


4. Indoor Equipment Fastness

Key Points Details Description

The installation Outdoor Installation and IDU placement (on BTS 3012AE)
position of IDU
accords to the
engineering design
document.

Outdoor Installation and IDU placement (on BTS 3900A)

Indoor Installation and IDU placement on 19” rack

RTN 600 MW Installation Standard 10 HCPT - HUAWEI


IDU and DCPDB Standard labeling and labeling format
labeling standard

IF Board Labeling
Labeling Format:
 Label template :

TO : FE ID , FE NAME
TX. xxxx MHz, RX. xxxx MHz

 For 1+1, use mark IF1 for main IF and IF2 for stand by IF
 Font : Black
 Background : White
 Material : Print Label,

Power Cable Labeling


Labeling Format:
 Label template :

TO : POWER CABLE

 Font : Black
 Background : White
 Material : Print Label, Flag label tie

Tributary Cable Labeling


Labeling Format:
 Label template :

TO : DDF

 Font : Black
 Background : White
 Material : Print Label, Flag label tie


Labeling on rectifier power cable


Labeling Format:
 Label template :

TO : FAR END ID

 Font : Black
 Background : White
 Material : Print Label, Flag label tie

RTN 600 MW Installation Standard 11 HCPT - HUAWEI


Labeling on DCPDB
Labeling Format:
 Label template :

TO : FAR END ID

 Font : Black
 Background : White
 Material : Print Label

DDF Labeling Standard labeling for outdoor DDF (sample)


Standard

Standard labeling for Indoor DDF (sample)

RTN 600 MW Installation Standard 12 HCPT - HUAWEI


5. Cable distribution and routing

Key Points Details Description

Cable distribution and Cable routing standard for outdoor BTS.


cable routing

Cable routing standard for indoor BTS (1).

RTN 600 MW Installation Standard 13 HCPT - HUAWEI


Cable routing standard for indoor BTS (2).

RTN 600 MW Installation Standard 14 HCPT - HUAWEI

S-ar putea să vă placă și