TESTING COMMISIONING REPORT

COOLING TOWER
Project _________________________
FM/IK/ODR/MEP-011-06 Rev: 0 Halaman 1 dari 1

Location : _______________________________ Equipment No. : _____________________________


Level : _______________________________ Service : _____________________________
Test Date : _______________________________ Drawing Ref. : _____________________________
Report Date : _______________________________

Particular of Cooling Tower :


Merk : ______________________________________________________________________
Type : ______________________________________________________________________
Capacity : ______________________________________________________________________
Ent Water Temp. : ______________________________________________________________________
Lvg Water Temp. : ______________________________________________________________________
Ampere : ______________________________________________________________________
Volt / Ph / Hz : ______________________________________________________________________

Test Result :

Unit Cleaning : Yes No


Bolt & Nut Tightening : Yes No
Installation Test : Yes No
Cooling :
- Ent Water Temp : ______________________ ° C
- Lvg Water Temp : ______________________ ° C
Fan Blower
- Ampere : ______________________ A
- Overload Setting : ______________________ A
- Voltage : ______________________ V
Balancing Pipe : Yes No
Drainage System : Yes No
Make Up Water : Yes No
Fan Rotation : Yes No

Test Result Equipment Test Comments

Approved

Not Approved

Re - Tested

Approved by, Checked by, Tested by,

_________________________ _________________________ _________________________