SUMMARY OF COST

Sl. No. Description Amount (Rs.)

1 Part-1: Cost of Foundation 331,571.59


2 Part-2: Cost of Substructure 9,079,235.22
3 Part-3: Cost of Superstructure 2,088,235.01
4 Part-4: Cost of Protection 1,799,934.42

Total Cost of Bridge = 13,298,976.23


DETAILED ESTIMATE OF SVUP

Ref. to
Sl.
MoRTH Item Description Unit Quantity Rate
No.
Spec.
FOUNDATION
1 304 Excavation for Structures
Earthwork in excavation for structures as per drawing
and technical specifications Clause 305.1 including
setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal
upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material.

I. Ordinary Soil
i) Upto 3m depth Cum 710.119 57.20

2 1500,
Providing and laying of PCC M15 levelling course below
1700 &
bottom Slab & Retaning wall & Curtain wall.
2100 Cum 57.853 5,029.20

SUBSTRUCTURE
3 1500, R.C.C. grade M 35 in Sub Structure complete as per
1700 & Dwg & Tech Specification.
2200
i) Upto 5m height (Using Concrete Mixer) Cum 264.046 6,664.90
ii) From 5m upto 10m height (Using Concrete Mixer) Cum 0.000 6,664.90

4 1600 & Supplying, fitting and placing HYSD bar reinforcement


2200 (Fe-500) in substructrue complete as per drawings and
technical specification Clauses 1002, 1005, 1010 &
1202 t 21.124 53,829.60

5 2706 & Providing weepholes in brick masonry/stone masonry,


2200 plain/reinforced concrete abutment, wing wall, return
wall with 100 mm dia AC pipe extending through the full
width of the structures with slope of 1(V):20(H) towards
drawing face complete as per drawing and technical
specification Clauses 614, 709, 1204.3.7

Nos 411 190.30

6 2200 Backfilling behind abutment, wing wall and retaining


wall complete as per drawings & technical specification
Clause 1204.3.8
I) Sandy Material Cum 2,537.85 2,234.10

7 2200 Providing and laying filter media with granular


crushed aggregates as per specification to a thickness
of not less than 600 mm with smaller size towards the
soil and bigger size towards the wall and providing over
the entire surface behind abutment, wing wall, return
wall to the full height, compacted to firm condition
complete as per drawing and technical specification
Clause 1204.3.8
Cum 353.449 1228.70
DETAILED ESTIMATE OF SVUP

Ref. to
Sl.
MoRTH Item Description Unit Quantity Rate
No.
Spec.
SUPERSTRUCTURE
8 1500 Providing and laying reinforced cement concrete in
&1600 superstructure complete as per drawing and technical
1700 specifications Clauses 800, 1205.4 and 1205.5.
RCC M-35
Up to 5m height Cum 51.625 6,309.00
Height from 5m to 10m Cum 0.000 6,576.00
9 1600 Supplying, fitting and placing HYSD bar reinforcement
(Fe 500) in superstructrue complete as per drawings
and technical specification Clauses 1002, 1010 & 1202 t 4.130 55,030.80
Wearing Course (65 mm thick) comprising of 40 mm
Bituminous Concrete overlaid with 25 mm thick Mastic
10 2702 asphalt as per Technical Specification Clauses 512,
515 & 2702.
Mastic Asphalt Sqm 89.250 371.80
Bituminous Concrete Cum 3.570 7,800.00
11 2703, Provision of an Reinforced cement concrete crash
1500, barrier at the edges of the road, approaches to bridge
1600 & structures and medians, constructed with M-20 grade
1700 concrete with HYSD reinforcement conforming to
IRC:21 and dowel bars 25 mm dia, 450 mm long at
expansion joints filled with pre-moulded asphalt filler
board, keyed to the structure on which it is built and
installed as per design given in the enclosure to MOST
circular No. RW/NH - 33022/1/94-DO III dated 24 June
1994 as per dimensions in the approved drawing and at
locations directed by the Engineer, all as specified
m 42.000 3074.50
12 2705 Drainage Spouts complete as per drawing and
technical specifications Clause 1209 No 0 1313.40

13 2700 P.C.C. M-15 ordinary grade (1:2.5:5) levelling course


below approach slab complete as per drawing and
technical specificatios Clauses 800 & 1211. cum 58.089 4836.70
14 1500,16 Reinforced Cement Concrete M-30 grade approach slab
00,1700 including reinforcement and formwork complete as per
& 2704 drawing and technical specifications Clauses 800 and
1211 cum 121.380 8767.00

PROTECTION WORK
15 P.C.C. grade M-20 in Curtain Wall complete as per Dwg
& Tech Specification. cum 59.062 5,527.50

16 1300 Providing and laying flooring laid over cement concrete


bedding complete as per drawing and technical
specification Clause 1303.
Rubble Stone laid in Cement Mortar 1:3 Cum 58.567 5777.20
DETAILED ESTIMATE OF SVUP

Ref. to
Sl.
MoRTH Item Description Unit Quantity Rate
No.
Spec.
17 1300 Providing and laying boulder apron for bed protection
with stone boulders of minimum size and weight as per
Table 1300.1, no fragment weighing less than 25 kg laid
dry complete as per drawing and technical
specifications Clause 1301.
Cum 92.148 2236.30

18 2504 Providing and laying boulder pitching on slopes laid


over prepared filter media as per drawing and technical
specifications Clause 1302 cum 316.859 2236.30
19 2504 Providing and laying filter material underneath
pitching in slopes complete as per drawing and
technical specifications Clause 1302 cum 158.429 1391.50

Sub Total of Protection Items =

Total Cost of Bridge Structure =


DETAILED ESTIMATE OF SVUP

Amount
(in Rs.)

40618.83

290952.76
331571.59

1759842.68
0.00

1137080.86

78213.30

5669815.69

434282.69
9079235.22
DETAILED ESTIMATE OF SVUP

Amount
(in Rs.)

325702.13
0.00

227277.20

33183.15
27846.00

129129.00

0.00

280959.07

1064138.46
2088235.01

326465.99

338351.88
DETAILED ESTIMATE OF SVUP

Amount
(in Rs.)

206070.57

708591.43

220454.54

1799934.42

13298976.23
BOQ

Ref. to
Sl. Length Width
MoRTH Item Description Unit Nos
No. (m) (m)
Spec.
FOUNDATION
1 304 Excavation for Structures
Earthwork in excavation for structures as per
drawing and technical specifications Clause 305.1
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing
of sides and bottom and backfilling in trenches with
excavated suitable material.

I. Ordinary Soil
i) Upto 3m depth
Box bridge Cum 2 3.80 29.800
Retaining wall Cum 4 5.426 3.600
Curtain wall
D/S Side Cum 2 8.926 2.000
U/S Side Cum 2 8.926 1.650
Rigid Apron
D/S Side Cum 2 5.888 5.526
U/S Side Cum 2 5.888 5.526
Flexible Apron
D/S Side Cum 2 8.776 5.000
U/S Side Cum 2 8.776 5.000
Sub-Total = Cum

2 1500, Providing and laying of PCC M15 levelling course


1700 & below bottom Slab & Retaning wall & Curtain wall.
2100
Below Bottom Slab Cum 2 3.50 29.80
Below Independent Retaining Wall Cum 4 5.28 3.60
Below Curtain Wall
D/S Side Cum 2 8.78 2.05
U/S Side Cum 2 8.78 1.70
Below Rigid Apron
D/S Side Cum 2 5.89 5.53
U/S Side Cum 2 5.89 5.53
Sub-Total = Cum

SUBSTRUCTURE
3 1500, R.C.C. grade M 35 in Sub Structure complete as
1700 & per Dwg & Tech Specification.
2200
Up to 5m Height.
Bottom Slab Cum 2 3.50 29.50
Side Wall Cum 4 29.50 0.250
Middle Wall Cum 0 29.50 0.30
Foundation of Retaining Wall
1 st. Rectangular portion. Cum 4 5.28 3.300
2 nd. Rectangular portion. Cum 4 5.28 0.500
BOQ

Ref. to
Sl. Length Width
MoRTH Item Description Unit Nos
No. (m) (m)
Spec.
1 st. Trangular portion Cum 4 5.28 1.800
2 st. Trangular portion Cum 4 5.28 1.000
Retaining Wall Stem Cum 4 5.28 0.400

Foundation of U-through Retaining Wall Cum 1 4.50 3.700


Retaining Wall Stem of U-through Retaining wall Cum 2 4.50 3.684
Haunch at Bottom Slab Cum 4 29.50 0.150
Haunch at Top Slab Cum 4 29.50 0.150
Shear key
Rectangular portion. Cum 4 3.50 0.300
Triangular portion Cum 4 3.50 0.950
Sub-Total = Cum
Above 5m Height.
Box Side Wall Cum 4 29.50 0.250
Box middle Wall Cum 0 29.50 0.30
Retaining wall Stem Cum 8 5.28 0.400
Haunch at Top Slab Cum 4 29.50 0.150
Sub-Total = Cum

4 1600 & Supplying, fitting and placing TMT bar


2200 reinforcement (Fe-500) in substructrue complete as
per drawings and technical specification Clauses
1002, 1005, 1010 & 1202
(i) For Box Structure @ 80 Kg per cum of Concrete t 165.89
(ii) For Retaining Wall @ 80 Kg per cum of Concrete t 98.16
Sub-Total = cum
BOQ

Ref. to
Sl. Length Width
MoRTH Item Description Unit Nos
No. (m) (m)
Spec.
5 2706 & Providing weepholes in brick masonry/stone
2200 masonry, plain/reinforced concrete abutment, wing
wall, return wall with 100 mm dia AC pipe
extending through the full width of the structures
with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical
specification Clauses 614, 709, 1204.3.7

No of weep holes in Side wall Nos 4


No of weep holes in Retaining Wall Nos 4
No of weep holes in U-trough Retaining Wall Nos 1
Sub-Total = Nos

6 2200 Providing and laying filter media with granular


crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per
drawing and technical specification Clause
1204.3.8

(i) Behind Abutment cum 4 28.70 0.60


(iii) Behind Independent Retaining Wall cum 4 4.68 0.60
Behind Independent U-trough Retaining Wall cum 2 4.50 0.60
Sub-Total = cum
7 2200 Backfilling behind abutment, wing wall and
retaining wall complete as per drawings & technical
specification Clause 1204.3.8
II) With Sandy Material
(i) Behind Abutment & Independent Retaining Wall cum 4 27.500 4.68

SUPERSTRUCTURE
8 1500 Providing and laying reinforced cement concrete in
&1600 superstructure complete as per drawing and
1700 technical specifications Clauses 800, 1205.4 and
1205.5.
RCC M-35
(i) Top Slab (Upto 5m height) cum 2 3.500 29.50
(II) Top Slab (Above 5m height) cum 2 0.000 0.00

9 1600 Supplying, fitting and placing HYSD bar


reinforcement (Fe 500) in superstructrue complete
as per drawings and technical specification
Clauses 1002, 1010 & 1202
For Top Slab @ 80Kg per cum of Concrete t 51.625
BOQ

Ref. to
Sl. Length Width
MoRTH Item Description Unit Nos
No. (m) (m)
Spec.
Wearing Course (65 mm thick) comprising of 40
mm Bituminous Concrete overlaid with 25 mm
10 2702 thick Mastic asphalt as per Technical Specification
Clauses 512, 515 & 2702.

(a) Mastic Asphalt sqm 2.000 3.500 12.750


(b) Bituminous Concrete Cum 2.000 3.500 12.750

11 809 Provision of an Reinforced cement concrete


crash barrier at the edges of the road, approaches
to bridge structures and medians, constructed with
M-20 grade concrete with HYSD reinforcement
conforming to IRC:21 and dowel bars 25 mm dia,
450 mm long at expansion joints filled with pre-
moulded asphalt filler board, keyed to the structure
on which it is built and installed as per design given
in the enclosure to MOST circular No. RW/NH -
33022/1/94-DO III dated 24 June 1994 as per
dimensions in the approved drawing and at
locations directed by the Engineer, all as specified
m 4 10.500 -
BOQ

Ref. to
Sl. Length Width
MoRTH Item Description Unit Nos
No. (m) (m)
Spec.
12 2705 Drainage Spouts complete as per drawing and
technical specifications Clause 1209
No 0

13 2700 P.C.C. M-15 ordinary grade (1:2.5:5) levelling


course below approach slab complete as per
drawing and technical specificatios Clauses 800 &
1211. cum 4 3.35 28.900

14 1500,16 Reinforced Cement Concrete M-30 grade approach


00,1700 slab including reinforcement and formwork
& 2704 complete as per drawing and technical
specifications Clauses 800 and 1211 cum 4 3.5 28.900

PROTECTION WORK
15 P.C.C. grade M-20 in Curtain Wall complete as per
Dwg & Tech Specification.
For Curtain wall
Curtain Wall (D/S) Cum 2 8.78
Curtain Wall (U/S) Cum 2 8.78
Sub-Total = cum

16 1300 Providing and laying flooring laid over cement


concrete bedding complete as per drawing and
technical specification Clause 1303.
Rubble Stone laid in Cement Mortar 1:3
D/S Cum 2 5.89 5.526
U/S Cum 2 5.89 5.526
Sub-Total = cum

17 1300 Providing and laying boulder apron for bed


protection with stone boulders of minimum size and
weight as per Table 1300.1, no fragment weighing
less than 25 kg laid dry complete as per drawing
and technical specifications Clause 1301.

D/S Cum 2 8.78 5.00


U/S Cum 2 8.78 5.00
Sub-Total = cum

18 2504 Providing and laying boulder pitching on slopes


laid over prepared filter media as per drawing and
technical specifications Clause 1302
(i) Behind Abutment (Quadrate Slope) cum 8 28.82
(ii) On Embankment Slope of Approaches cum 8 20 5.16
Sub-Total = cum

19 2504 Providing and laying filter material underneath


pitching in slopes complete as per drawing and
technical specifications Clause 1302
(i) Behind Abutment (Quadrate Slope) cum 8 28.82
BOQ

Ref. to
Sl. Length Width
MoRTH Item Description Unit Nos
No. (m) (m)
Spec.
(ii) On Embankment Slope of Approaches cum 8 20 5.16
Sub-Total = cum
BOQ

Depth/
AREA
Height Quantity
(Sqm.)
(m)

0.65 147.21
1.70 132.83

2.50 89.26
2.00 58.91

0.75 48.81
0.75 48.81

1.05 92.15
1.05 92.15
710.1

0.100 20.86
0.100 7.60

0.150 5.40
0.150 4.48

0.150 9.76
0.150 9.76
57.85

0.250 51.63
3.43 101.30
3.43 0.00

0.300 20.89
0.400 4.22
BOQ

Depth/
AREA
Height Quantity
(Sqm.)
(m)
0.400 7.60
0.400 4.22
5.384 45.45

0.350 5.83
0.300 9.95
0.150 1.33
0.150 1.33

0.950 3.99
0.950 6.32
264.05

0.000 0.00
0.000 0.00
0.000 0.00
0.150 0.00
0.00

13.271
7.852
21.12
BOQ

Depth/
AREA
Height Quantity
(Sqm.)
(m)

344
56
11
411

3.93 270.974
5.38 60.421
4.08 22.054
353.45

4.93 2,537.9

0.250 51.63
0.000 0.00

4.13
BOQ

Depth/
AREA
Height Quantity
(Sqm.)
(m)

- 89.250 89.25
0.040 3.57

- 42.000
BOQ

Depth/
AREA
Height Quantity
(Sqm.)
(m)

0.150 58.089

0.30 121.380

1.897 33.30
1.468 25.76
59.06

0.450 29.28
0.450 29.28
58.57

0.750 65.82
0.300 26.33
92.15

0.30 69.179
0.30 247.680
316.86

0.15 34.589
BOQ

Depth/
AREA
Height Quantity
(Sqm.)
(m)
0.15 123.840
158.43