Audit Report
For the Client
HeadOffice-D1-RH-AJZKD5
1.14
2017/41081/SU1
ISO 9001:2008
The data below is used to Build, Track and Monitor the Client's system profile to assist in the creation of
the Audit Administration Requirements.
Audit Team Auditor Name Audit Audit Specialist's Name Translator's Name
Days Time
(for
IATF
16949
only)
Lead Auditor Mr. Fredon 2 N/A N/A N/A
Simson Hutapea Mandays
Member 1 --- --- --- --- ---
Member 2 --- --- --- --- ---
Member 3 --- --- --- --- ---
Member 4 --- --- --- --- ---
HeadOffice-D1-RH-AJZKD5
2.14
2017/41081/SU1
ISO 9001:2008
The auditor is ONLY defining the Fundamental Processes or Departments that the client refers to in their
management system (i.e.: functions in the standard such as Management Review, is a Management
Process and is recorded else where), the auditor may further clarify a Client's fundamental process name
to aid programme activities e.g.: if reference is made to Production in a general engineering company, the
auditor may expand its reference by stating Production - cutting, Production - Painting. Or for a service
company service provision may be referenced as Service Provision - Call Desk, Service Provision - Help
Desk etc..
Note: If more than one permanent location (site) was audited, please ensure that Appendix A is
completed and copied to the client.
HeadOffice-D1-RH-AJZKD5
3.14
2017/41081/SU1
ISO 9001:2008
Visit Administration
Visit Objectives
The visit objective is to confirm that the Management System requirements of the standard
(including client and regulatory requirements) are met.
Executive Summary
HeadOffice-D1-RH-AJZKD5
4.14
2017/41081/SU1
ISO 9001:2008
Auditor(s) Summary
PART A.1 - The following table must be completed by the Auditor (If the Scope Wording has any of the
Activity "Words" stated in the table below, within the Scope, the Auditor should perform Audit sampling).
Activity "words" Type Indicate Confirm THIS Activity If the Activity has NOT been
Below if has been Audited Sampled during this Visit state
Activity the Reasons
Type is
within
the
Scope
Project Management -- --- ---
Design/Development Yes See detail on ---
Worksheet
Manufacture/Production/Assembly -- --- ---
Service/Service Provision Yes See detail on ---
Worksheet
Commissioning -- --- ---
Installation -- --- ---
Maintenance/Servicing -- --- ---
PART A.2 - For any scope with the "word(s)" Construction, Demolition, Erection, Installation,
Commissioning or Servicing, then a Temporary Site should be audited - complete the table below:
Name of Temporary Site Confirm If a Temporary Site has NOT been audited at this
Temporary visit, justify why not.
Site
Audited
NIL -- ---
--- -- ---
--- -- ---
PART B.1 - When looking at the Client's Scope and applying the "Layman's Test" (i.e.: would a person
who is not familiar with the business, understand the scope), please confirm below whether in your
judgment the scope is meaningful?
HeadOffice-D1-RH-AJZKD5
5.14
2017/41081/SU1
ISO 9001:2008
PART B.2 - As the auditor, comment below regarding the Scope being sought (A Scope that has a broad
boundary, such as Civil Engineering Services, justification is required that the client activities have been
sampled during the audit to demonstrate that the client can indeed, perform ALL types of civil engineering
projects e.g.: Roads, Sewage, Bridges. In other words, a Scope should give an indication of Range):
seen recorded of distribution records of external document to the related department in prior to used.
Auditor's comments on the Context of the system (with reference to fundamental processes being
suitable to the context of the client's business aims)
Not determined yet, still use ISO 9001:2008
All staff and employee, demonstrate the knowledge related to Quality Management System. Site Tours,
Interview, Observation and Desk Audit had been conducted for ensuring the effectiveness of Quality
Management System.
HeadOffice-D1-RH-AJZKD5
6.14
2017/41081/SU1
ISO 9001:2008
There is no NC (Major) and 4 (four) discrepancies (NC Minor) found during audit. Several comments have
been issued during audit for organization improvement.
We recommend for registration status of ISO 9001:2008 Certification to SMK Budi Dharma upon
submission this client request.
HeadOffice-D1-RH-AJZKD5
7.14
2017/41081/SU1
ISO 9001:2008
Comments Raised
Definitions
Potential Non-Compliance = A possible weakness in a system element has been noted by the auditor
(Note: The element was not fully tested due to time constrants) = Classification 3
Opportunity for Improvement = The auditor's experience suggests the system element could be improved
(efficiency or control) = Classification 4
.
Number Description Type of
Comment
1 Seen competency assessment for teaching assignment had been performed and 3
maintained by Curriculum Dept, however Audit competency had no clear result
(e.g. Ms. Fransiska – Bahasa Inggris Class XI; Mr. Rekho – Pemograman Dasar
Class X; Ms. Elsy Novarita – Produksi Acara Class XI; Ms. Ordi Wardani – Dasar
Kecantikan Kulit Class X) [clause 6.2]
3 It can be more beneficial to preserve spare time “waktu cadangan” for lesson plan 4
as monitoring control process (e.g. Ms. Fransiska – Bahasa Inggris Class XI; Mr.
Rekho – Pemograman Dasar Class X; Ms. Elsy Novarita – Produksi Acara Class
XI; Ms. Ordi Wardani – Dasar Kecantikan Kulit Class X) [clause 7.3]
4 Documented procedure for National exam need to established yet. [clause 4.2.3] 3
6 Seen letter handling had been maintained and controlled by GA Dept.; however 3
there is lack recorded any distribution records for letter handling for ensuring
process effectiveness. (i.e. Letter No. 800/178/SMKN3/17, dated 27/03/2017;
Letter No. 421/228/SMKN3/2017, dated 28/04/2017; Letter No. 008/SIR-
E/03/2017, date Maret 2017; Letter No. 910/STMIK.P/III/2017, date 08/03/2017)
[clause 4.2.4]
7 Seen final grades student has been maintained and controlled by Curriculum Dept, 3
however there is lack verification and validation ledger of final grades student in
prior to used. [clause 7.5.2]
8 Personal data file seen not completed yet for several personel (e.g. Mr. Reko, Ms. 3
Ordi) [clause 4.2.4]
9 Seen documented procedure in related to Online selection had not evaluates yet 3
as for ensuring process effectiveness. Ref. POS 7.5.1 [clause 4.2.3]
10 Blind Colour Test had not conducted yet for several competency (e.g. Teknik 3
Komputer Jaringan, Tata Boga, Tata Kecantikan, Tata Busana) [clause 8.2.3]
11 Seen Student induction had been maintained and controlled, however there is lack 3
evaluation of student induction for ensuring process effectiveness. [clause 8.2.4]
12 Extracuriculer - Final Report of program for Y2015/2016 seen had not completed 3
HeadOffice-D1-RH-AJZKD5
8.14
2017/41081/SU1
ISO 9001:2008
16 Seen internal quality audit has been performed for Y2016, however there is lack of 3
recorded any objective evidences taken during audit process. (i.e. Curriculum,
General Admission, Infrastructure and Facilities) [clause 8.2.2]
17 Seen management review has been performed and maintained, however there is 3
no verification date and status for any action taken had no clear to ensuring the
effectiveness of the output result. [clause 5.6.2];
-- --- --
-- --- --
-- --- --
-- --- --
-- --- --
-- --- --
-- --- --
-- --- --
HeadOffice-D1-RH-AJZKD5
9.14
2017/41081/SU1
ISO 9001:2008
Concerns Raised
Definition
Non-Compliance = A major break-down in a process that may directly effect the final product or service
being delivered, environmental impact, or serious injury to a person, regulatory failure; or lack of
compliance to a clause of the standard (Classification 1).
HeadOffice-D1-RH-AJZKD5
10.14
2017/41081/SU1
ISO 9001:2008
3 7.6 Calibration of test instrument analysis needs to be improves for ensuring teaching
performances effectiveness. (i.e. Ms. Fransiska – Bahasa Inggris Class XI; Mr.
Rekho – Pemograman Dasar Class X; Ms. Elsy Novarita – Produksi Acara Class
XI; Ms. Ordi Wardani – Dasar Kecantikan Kulit Class X) [clause 7.6]
-- -- ---
-- -- ---
-- -- ---
-- -- ---
-- -- ---
-- -- ---
-- -- ---
-- -- ---
HeadOffice-D1-RH-AJZKD5
11.14
2017/41081/SU1
ISO 9001:2008
HeadOffice-D1-RH-AJZKD5
12.14
2017/41081/SU1
ISO 9001:2008
HeadOffice-D1-RH-AJZKD5
13.14
2017/41081/SU1
ISO 9001:2008
The objective for the next visit (plan given below) is to confirm that the management system remains in
compliance with regard to the standard, contractual requirements and regulations.
.
Day Start Auditor Process
Number Time
1 08.30 TBA Opening Meeting
-- 09.00 --- Curicullum Design (Including Academic Programs, Syllabus, and RPP)
-- 12.00 --- Lunch/Break
-- 13.00 --- Teaching Activities (Including Program Competency)
-- 15.00 --- Management Representative
2 08.30 --- Studentship and Counseling
-- 10.00 --- Public Relation (Internship Program)
-- 12.00 --- Lunch/Break
-- 13.00 --- General Admission
-- 14.30 --- Infrastructure and Facilities
-- 15.30 --- Library
-- 16.30 --- Report Preparation
-- 17.00 --- Closing Meeting
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
-- -- --- --
EOF