DEPARTMENT OF CIVIL
ENGINEERING
CENG 3103
BUILDING CONSTRUCTION
Instructor – Abraham Assefa (Eng.) Dec. 2009
CEng 3103 – Building Construction
Course Outline
2
Presentation Outline
5.10 Formwork and Scaffolds
5.10.1 Introduction
5.10.2 Requirements of a good formwork
5.10.3 Materials, Construction, Order and Method and
Design for formwork
5.10.4 Safety in Formwork
5.10.5 Scaffolds
CEng 3103 – Building Construction
5.10.1 Introduction
4
Formwork is a
temporary structure
that is required to
support and form
concrete members
False work is the
complete structure
erected to support the
wet concrete
Scaffold are structures
build to give access to
different parts of a
building, mainly to
external walls
CEng 3103 – Building Construction
5.10.2 Requirements of a good formwork
5
Materials –
Timber
Plywood
Steel
Construction –
Propping and centering
Shuttering
Provision of camber
Surface Treatment
Order and Method of Removing – Min days as given by EBCS - 2
Shuttering – walls, beams and columns with less loads
Shuttering - Soffits of slabs
Shuttering – beams and girders with heavy loads
Design Principles
Safety
CEng 3103 – Building Construction
5.10.5 Scaffolds
7
Sanitary Systems
Fire and Life Protection
Mechanical Systems
Electrical Systems
Reference - Time-saver standards for architectural design data
Final Exam –
Aftermid exam,
Drawing and conceptual questions
Semester Project –
Final Schematic Design – Jan. 8/2010
Final Drawings (Floor Plans, Elevations, Sections, Site
Plan) – 10 days from the last date of exam
Last Word
9
END OF COURSE