Syndicate 6 – BLEMBA 16
10/22/2014
Table of Contents
1. Organization Profile ...................................................................................................... 1
2. Brief Summary of The Project Management and Flow Chart ..................................... 4
3. Major Challenges / Problems ....................................................................................... 4
4. Critical Assessment of The Project Management Brief .............................................. 4
4.1. Current Project Being Managed To Meet Certain Aspect ..................................... 5
4.2. The Important Competitive Priorities ....................................................................5
4.3. Management Performance / Efforts ..................................................................... 6
4.3.1. What Management Has Done / Is Doing To Deliver The Performance ................. 6
4.3.2. Are They Successful? .......................................................................................... 6
4.4. Problems ............................................................................................................. 6
4.4.1. Outline Any Existing Problems ............................................................................. 6
4.4.2. Identify The Potential Cost of This Problems ........................................................ 6
4.5. Strategy .............................................................................................................. 6
4.5.1. What Strategy Chosen To Improve The Situation ................................................ 6
4.5.2. Why and What The Potential Impact .................................................................... 6
4.5.3. Are There Any Potential Difficulties in Implementation ......................................... 6
5. Conclusion and Lesson Learn...................................................................................... 4
6. Bibliography .................................................................................................................. 4
Appendix .............................................................................................................................. 4
Abstracts
Terminal 3 is part of Angkasa Pura II development for SHIA. PT Angkasa Pura also has
others plan to optimize SHIA. The plans are optimize runway 1 and runway 2 so airplanes
movement in the runway will not take time too long, build a new cargo village, and build an
integrated building to integrate SHIA Terminals and connect this building with a train station, bus
station, mall, and hotel.
Building a new airport terminal in a fully operated airport is not an easy task. PT
Angkasa Pura 2 has to make sure the process will not affect SHIA operation in operating
existing terminal. One of Angkasa Pura II decisions that affected the operation of SHIA is the
closing of M1 Road. The closing of the road created traffic jam in SHIA. Passengers need to
leave early from their house or hotel to catch their flight.
Angkasa Pura II divided the project in Terminal 3 into two phases. The first phase had
completed in September 2014 and its second phase was planned to be completed in July 2015.
To make the project finish faster, Angkasa Pura II decided to build Terminal 3 using Design-
Build Method.
Key words: Project Management, Terminal 3 Soekarno Hatta Project, Design Build.
1. ORGANIZATION PROFILE
Angkasa Pura II is the one of the State-Owned enterprise in providing airport service
in western part of Indonesia, including Soekarno Hatta airport, which is the largest
dedicated for domestic airline, Terminal 2 which servicing the international and national
flight, and the latest is Terminal 3, in current phase, dedicated for a low cost carrier
and the appointment of Board of Directors of Angkasa Pura II dated November 28,
excels on all dimensions of products and services that are important to the
Ensuring that the organization’s system can consistently produce the design
determine and accomplish the objectives by the use of people and resources.
1
Operation and Supply Chain Management Chase and Jacobs 13E
Development and Technology as the top manager. In the beginning, managers think of
their actions in advance, as planning activities, and in the end of cycle activities, they
Project Management Unit (PMU) is organizing the project, coordinate the human
manager, and supported by three manager, in program project, engineering project, and
finance project.
Actuating is the motor which encourage all resources perform each duties as set
in the plan. This special team called Project Implementation Unit (PIU), which has clear
structure with specific job and not treated as not treated as additional role for the
primary job. PIU consist of program project officer and site project officer
Work Method
Five agenda which be Angkasa Pura II focus in developing Soekarno Hatta Airport are:
stop service and multi function building, It will also have railroad station which
conventional method, works under a single contract, thereby integrating the role of
designer and constructor. Rather than split the work into two contract, as the practice in
conventional method, in the design build method avoid the conflict usually happens
between the designer and the contractor since it is single point of responsibility,
complete the project faster, minimize the change order, and more efficent.
During year 2013, Soekarno Hatta International Airport (SHIA) is 10th busiest airport in
the world2 with total passengers of 59.7 million total passengers based on Airport
Council International
Respective master plans drawn up by AP-II and the Directorate General Civil Aviation (hereafter,
DGCA) have not been coordinated; rather, the two master plans stand as independent, parallel
documents.
2
http://en.wikipedia.org/wiki/World's_busiest_airports_by_passenger_traffic
Plans for a new airport are being considered for 2017 onwards when the demand for air travel can
be expected to exceed 60 million passengers annually but at this stage the plans are still in a state
of flux. Therefore, this study will remain within the parameters of annual passenger numbers to a
maximum of 60 million with the use of two runways
Therefore, it is believed that there is significant room for improvement. In specific terms, there is
a need for increase in space available for leasing following the expansion of the terminal
buildings, improvement in the quality of shops and inclusion, as customers, of those visitors to the
airport who at present are unable to enter the terminal buildings when they send off or meet
passengers
During the project execution, there some challenges and problems facing, especially
regarding to the inconvenience occurred around area of the project. The needs of
expansion and upgrading the capacity, while in the same time, the airport is also still
serving on requirement, as consequence, the airport must contend with the following
condition:
Traffic jam always happens in the SHIA area, especially when in the rush hour.
Previously, for the domestic flight, which need 1 hour check-in prior the flight,
passengers can go from Jakarta downtown two hour before the flight. Now they need
and highly suggested to go 1 hour earlier, or 3 hours before the departure time to avoid
Tangerang district, which impact to project completion, since the access road nearby
the airport is very crowded. The importance of considering the ultimate goal should be
supported by the authority to create regulation in line with the project development,
4.1 How the current operations being managed to meet certain aspects in the
passenger per year, increase from current capacity of 4 million passenger. The
consist of PT. Wijaya Karya Tbk, PT. Waskita Karya Tbk, Hyundai, PT. Pembangunan
Perumahan Tbk, and PT. Jaya Teknik, with total worth of Rp. 4.7 trillion budget
As of mid-May 2014, PT. Angkasa Pura (AP) II has declared that Terminal 3
about 31 percent of completion. To meet the certain aspects, the project is managed in
below activities:
In the first phase, the project is scheduled for completion in September 2014.
terminal, domestic concourse, parking area, and overpasses for departures and
arrivals.
concourse, parking area, and VVIP building, which set to be completed in July
2015.
Director of Angkasa Pura II Try Sunoko explained as of February 25, 2014, the
Corporate Secretary of Angkasa Pura II, in the end of April 2014 the progress is already
reached 25-26 percent of completion, and by the middle of June 2014, its completion
has reached 31 percent. The terminal 3 ultimate project, including the apron, is planned
Bellow is the strategy to meet the certain aspect in strategy map perspective
The project is involving about 1,125 workers in various types of work, comes
from 5 contractor PT WIKA, PT. PP, PT. Waskita Karya Tbk, PT. Jaya Teknik, and
Hyundai.
The operation consist of 3 shift, which each shift is eight hour, to support 24
hours operation. Accommodation for workers is located nearby the project, and there is
amenities is also to ensure each shift can start and finish the operation in the punctual
time.
construction project of phase I can be finished in September 2014, even though in the
last rainy season, the project faced some problems. The workload was decrease and
must stop if it was the outdoor job when it was raining, but the strategy is shifting
When phase I is accomplished, Terminal 3 will have 4 (four) gate with 8 (eight)
aerobridge, an aisle connected the gate directly to the plane. The entire of terminal 3
will have 24 gates with 40 aerobridge. In most current practice, passengers directly
walk from gate or taken by airport bus to the plane and then take the stair to enter the
plane. Only international flight or national flight served used aerobridge, even it is also in
limited number
All the facility in phase I will be ready in January 2015, after that contractor will renovate
the Terminal 3 old building with estimation 6 months completion. Angkasa Pura II
claimed the development of Terminal 3 Ultimate has reached 60% as of October 2014.
Terminal 3 Project is reflection how PT. Angkasa Pura II operates through its vision and
and
In line with the vision, there are priorities in developing the Terminal 3 Ultimate Project
development plan, This is to ensure that there is minimal risk will be impact to
In the downtown, Manggarai train station will be first point of the station to the
airport. The advantages are bigger capacity other than other public
This route will serve the passengers from area of Tangerang and South
Tangerang district
Management and the organization, including PIU and PMU set the plan at first
stage. The plan is defined more the detail with some number of measurement as below
percent, Jaya Teknik 5 percent, and Hyundai 15 percent. It also changed the work from
the conventional method to the design build method, put the contractor in single-point
responsibility to design and also build. The advantages is lower spending in overall, and
the project can be finished faster, reflected in the first stage of development of Terminal
3, when the target for ground breaking is the same time with the inauguration of
Below is the Soekarno Hatta Airport development project with each phase of work define
TARGET
Key Performance Indicator (KPI) is utilized as measurement tools for the project
implementation. The target of completion is 850 days since the contract signed. The
work scope for consortium includes the Detail Engineering Design (DED) and
Construction (Design-Build) on main building terminal, access road, and the parking
Hatta airport, the progress has reached 60% of completion, including the building and
road infrastructure.
Monitoring performance in detail, there are regular meeting held with all
members of consortium, regular meeting with the owner, take immediate action with
government related. Material purchasing is also well prepared, if it is long lead item, the
material will be purchased soon to avoid the price fluctuation. The payment process are
done as soon as the document is complete, to ensure the cash flow in line with
spending schedule.
4.4 Outline any existing problems in the operations and identify the potential
The problems occurred during the project execution, from internal project itself, and also
from external factors, such as the social impact, which can be identified in below list
Internal
A lot scope of work changes in Design and Build, with potential budget target of
Potential of accident since there are parallel work done in the same area in the
same time.
Unstable electrical supply, including the lighting is the obstacle for interior work
and also the construction work that really depends on the electrical power.
External
Dispute on the area of 320 hectare in airport expansion, is postponed until clear
and certain decision about Tangerang regency and Tangerang city border
Traffic jam in M1 area, impacted the delay for material delivery since the delivery
4.5. What strategy you choose to improve the situation? Why and what be the
1. Design and Build are very good to speed up the construction and reduce cost
2. Budget Plafond (Rp. 4.7 trillion) should be decide first before start the operation
6. Bibliography
Itochu Corporation, Shimizu Corporation, Jap n Airport Terminal Co., Ltd, Nikken Sekkei
Ltd, Nikken Sekkei Research Institute, Japan Economic Research Institute Inc. 2012, Study
on Soekarno Hatta International Airport Expansion and Upgrading Project in Jakarta in The
Republic of Indonesia.
Jacobs, F.R., and Chase, R.B. 2010, Operation and Supply Chain Management 13E, Mc
Graw Hill, New York.
Nugroho, E.A., 2014, “Infrastructure and Transportation.’ Investor Daily, 16 May, p. 25.
Appendix
Exhibit 1
Passengers by Year
Exhibit 2
Operational Highlight