Inspection Checklist

Location:
Inspector: Date:

Please tick「」 at the appropriate box.


0 – Non-conformity, a corrective action report is required (with corrective action described); 1 – Not satisfied,
immediate action/control measure has been taken to address the issue, the effect is acceptable; 2 – Satisfied.

Remarks:
1. Quarterly inspection is required for laboratory and office.
2. Inspection per project is required for on-site work.

Not Comment/follow
Inspection item 0 1 2
applicable up

1. Have appropriate PPE being provided to the working staff?


2. Has the measuring equipment used for site measurement been calibrated
and labeled?
3. Has the dust and dirt attached on electrical equipment and wires been
cleared?