Sunteți pe pagina 1din 9
Office of the Chief Engineer (R&B) Buildings, R&B Department Errum manzil, Hyderabad Procs. No. CEB/TAS/AEE3/SSR: 2009-10 01:29-01-2010, Sub:- Roads & Buildings Department - Adoption of Revision and Updating of Andhra Pradesh Standard data in all Engineering/Public Works Department and other organisations ~ A.P, Revised Standard Data ~ Part-lIl for Buildings & Electrical tems - Corrigendum issued ~ Reg., Ref 1,G.0.Rt.No.472, 7,R&6 (R.1) Dept, dt:20-04-2007 2, G.0.Ms.No.49, I&CAD{PW-Reforms|Dept., Dt:2-03-2008, Following amendments are issued to the Standard Data for Buildings & Electrical items in Part-lll of the AP Revised Standard Data book: ‘A. CIVILWORKS 2, Hem Codes BLD-CSTN-2-2, BLD-CSTN-2-3 and BLD-CSTN-2-5 at SI. Nos: 10, 11 & 13 for excavation in mechanical means for the machinery charges for ‘Hydraulic Excavator’, the rate pertaining to ‘Shovel’ at SI. Nos: 51 to 52 of Page 333 of BSSR2009-10 may be adopted as the case may be. 2. Item Code BLD-CSTN-2-8 SI. No: 16 at Page No: 18 for sand filling data item, the Unit for output shall be taken for 6 cum output and labour coefficient shall be read as 0.31 for 6 cum output and, if required, cost of sand shall be added for 6 cum output, 3. lem Code BLD-CSTN-2-9 SI, No 16 at Page No: 19 for earth filling data item, the Unit for output shall be taken for 6 cum output and labour coefficient shall be read as 0.31 (instead of 3.12) for 6 cum output and, if required, cast of good gravel shall be added for 6 cum output 4, Item Code BLD-CSTN-3-11 SL No: 28 Page No: 22 for PCC (M20) Nominal Mix data item, coarse Aggregate 40 mm shall be replaced with 20 mm graded aggregate. 5. Hem Code BLD-CSTN-5-12 SI, No: 0 Page No 23 for Reinforced Brick masonry data item, the Unit of measurement shall he “ead as LO sqm 6. For ‘Weigh Batcher’ hire charges in the Data Wein Code 6LO.CSTN-8-14 to BLO-CSTN-3-16 at Si. No 31 in page No: 24 for ‘Design Mix Concrete’ (weigh Batch at Site) the rate pertaining to ‘Batching Plant’ at Sl. Nos: 9 to 11 of Page 331 of BSSR2009-10 may be adapted as the case may be 7. In ‘Basic Approach’ at Para.ti cf Concrete stems of Page No: 13, for the hire charges of vibrators may be read as ‘excluded’ in overhead charges instead of ‘included’ in overhead charges. 8. Item Code BLD-CSTN-4-19 SI, No: 2599 Page No: 109 for Dismantling of Brick work data item, the Unit of output shall be read as 10 cum 9. Item Code 81D-CSTN-11-20 SI, No: 167 Maye No: 80 for ‘Olt Bound Painting items, forthe cost of primer the rate pertaining to ‘cement primer’ at Si. Nos: 349 & 350 at item Codes: BMT-4.01 & BMT 1,02 in Page No: 25 of BSSR-2009-10 may be adopted in Ke! units as the case may be. 10. item Code BLO-CSTNv-11-10 SI. Ne: 167 Page fo: 80 for ‘OH Bound Painting’ items, forthe “Oi hound Distemper’ the unit may be read! as ‘Kgs instead of “Ls 11. Hire Charges for Centering & Scaffolding of RCC items at Page No: 128 - For Material Lift Charges & Labour rate for scaffolding above 7.32 M - increase @ 10% on labour component for each upper floor on First Floor Rate (7.32 M) shal be allowed. 412, Hire Charges for Scaffolding for Brick work & plastering at Page No: 128 - For Material tift Charges & Labour rate for scaffolding above 7.32 M - increase @ 50% on labour component for each upper floor on First Floor Rate {7.32 M) shall be allawed. 13, Item for Lift charges for all RCC items of works at Page No: 131 following table may be replaced ial’ oF ‘Mechanical’ lifting only shall be allowed as specified below 1. For Manual lifting ofall RCC items up to 3 Floors only: Lift Charges of Labour, increase @ | 10% on labour charges for each upper floor on Ground Floor Rate ; 2. For Mechanical Lifting ofall RCC items: Lift Charges of Materials only, for lifting Concrete | above 6.1.M (2nd floor onwards) Winch/ Lift hire charges may be allowed at following rates: ther ‘Ma for each adcitional floor | (3.66 M) over and above 2nd floor (7.32 M) | Basic Rate for 2nd Floor Description of Structure | rae a. FOUNDATIONS, PLINTH, PEDESTALS {Below Pint}, wi wil | tes BED BLOCKS a Tecan nes Ware] Gu ie = TANKS, RCC WALLS | c RCC SLABS, BEAMS 0267 us| 10% The Heads of Departments mentioned below are requested to communicate the correction to their subordinate officers. The change of rates of above items comes into force with immediate effect. The receipt of the proceedings may please be acknowledged Enclosed: As above 1. Batwa) Chief Engineer (R&B) Buildings Convener-Member, Committee of Chief Engineers- Building-SSR To 1. Engineer-in-Chief {Admn.8NH), Roads & Buildings Department 2. Engineerin-Chief (W}8&CAD, lerigation Department. 3. Engineer in-Chief, P..81M E. Department 4. Engineer.in-Chief (P.R}, Panchayat Raj Department 5, Engineer in-Chiet (R8&B) (Roads), R&B Department 6. Engineer-in-Chiet (RE&B) (HUDCO), R&E Department. 7. Engineer-in-Chief, Tribal Welfare & Social Welfare Department, 8. Chief Engineer (R&B) {NABARD), RRB Department. 9. Chie Engineer (AC& Member, COT}, R&B Department. 10, Chief Engineer (R&B) (Designs), R&B Department. 11. Chief Engineer(AP Housing Board) 12, Chief Engineer, Greater Hyderabad (MICH) 413, Chief Engineer(Housing Corporation) 14. Chiof Engineee(APSRTC) 45. Chief Engineer(APHMHIDC) 426, Chief Engineer (AP Police Housing & Welfare Corporation) 17. Superintending Engineer (R&B), Head Quarters Circle, Hyderabod 18, Superintending Engineer (R&B), Electrical Ccle, Hyderabad z Office of the Chief Engineer (R&B) ‘Buildings, R&B Department Erqum maneil, Hyderabad Procs, No. CED/TAB/AEE3/SSR: 2009. 0t:29-01.2010, Sub: Printing of Building-SSRs for all Engineering Departments specific to the functioning of Building works ~ Bullding-SSR:2009-10 ~ Corrigendum ised to the Building SSR:2009-10 - Reg,, Ref 1, GO.RtNo 471, T,A&B (R.A) Depr.,dt:20-04-2007, 2. LO. Pracs, No, CEB/TAB/AFE 3/55R: 2009-10 01 05-08-03, 3. Engineer-in-Chief,1&CAD [AWW/IW) Lt. No: ENC/IW/PN/EE./DEELO/AE/ 13308/09/VoI-27 D124 08.09 4, Engineer-in-Chief, CAD (AW/INY) Lr. No: ENC/IWW/PRM/E.1I/DEELO/AE/ 13308/09/Vol-27 01.27. 08-09 5, Engineer in-Chief, WCAD (AW/IW) Lr. No: ENC/IWW/PRMY/EE.IY/DEEIO/AE/ 13305/09/Vol-27 DL.07- 09.09 6.7.0, Procs, No.CEB/TAB/AEE3/SSR: 2008-10 D1.24-10.09, {in continuation of this office proceedings 6” cited, following amendments are issued to the Building SSR: 2009-10: 1 Hire Charges for Centering & Scaffolding for Footings, Pedestals, Plinth Beams at Page: No: 75 of Building SR; 2009-10 shall be replaced with the table below. Seine Tae si) naMeorruestrucrunar memocr | MMSE | stourchanges | Chagesfor | gglRtO es S 20030 | Mee 3 z a a 5 é A [ Foor, web BLOGS, STEPS = ms 30500 | wero 3 PrOESTAs Ws © | Pun aeas fs | e700 | | 1453.60 | port oom 2. Hite Charges for Centering & Sealfodng - Unsupported Height up to 3.66 M for Stee scaffolding ives, Jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc, at Page: No 75 of Building SSR 2009-10 shall be replaced with the table below re ee ee si] nameorriestmucrunatmemaen — | MMBC | arourchaiges | chargertor | 4.00% cham herbs or | aeeaureren z = 3 4 5 6 _| HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Weht upto 3.66 Stee scaffolding pies, jack Props, wales, Foot plates, brackets, steel Centering Plates b [unre 53200 | Ws. 123500 [pericum | erates sunaranES 3200) Re) 200 porta) + | COWMNS/ ACC WaLiS— E FAT 00 | RS) 853.00 pert | [aes 52600 ‘perteum | SLABS Upto 350m thick 7000 | pet 150m ‘SLABS - above 150 mm - Up to 300 mm thick 7300 | fs. | perisqm | ‘SLABS - above 300 mm thick 76.00 | Rs. | ‘per 1sqm / WAFFE-(GRD] SLABS (lb Baars with Sos 35800 | F. seria PERGOLA SLABS (Only Rib Beams) re 181.00 | Rs. 488.00 | pet 1 sqm ARGH BEANS opto 15 MSoan Fie00 | ae [9200 F pee tm] ARCHBEAUS- above 15 Span [aes [re [7220 1.00 per Leu DOME SIASS - [as | 226100 [es | 115200") Rs | 3893.00 pect am Fs | too [as a800 Ws 26200 | vert sem |

S-ar putea să vă placă și