ISDP-iEngineer Engineering
Management
—Work Instructions for Non-IFS
Contracts
www.huawei.com
New EPMS is upgrade and reconstruct by deleting useless functions of the old system, keeping the key
and useful functions, and adding new functions.
X
Old EPMS PRTool
Engineering Combined Based
组合工程
All the functions will be invalid On Task Orders
from September
Engineering ISDP-iEngineer
RCR1.0
Progress Revenue
Recognition
Contract And Overseas
Engineering Order Information remaining
Problems non-IFS
Engineering contracts Contract And Order Engineering
Progress and A- Progress Documents
type
Engineering countries’
Problems contracts
Change points: Plan dates of the engineering do not need to be maintained in the system any more; only the work start, work
completion, PAC, customer’s signing off of PAC, FAC, and customer’s signing off of FAC will be remained.
Break integration
Engineering Problem
on Sept. 12
CPP
X X
ISDP-iEngineer RCR 1.0
: Overseas remaining non-IFS
contracts and A-type countries’ Revenue Recognition
Non-IFS
contracts
Contracts
Formal Databank
Contracts still Engineering
in fulfillment Engineering Progress progress
on Sept. 12 information
Engineering problems
processed will be archived. If the POs have been specially processed but the contract items are not complete yet
or if the POs have not been specially processed, the contracts will not be archived (added on August 19, 2015).
Note: After the non-IFS contracts within archiving scope are migrated to the archiving databank in the new system, only
query function is provided in the archiving databank. To edit the engineering progress, it should be done in the formal
databank. Other non-IFS contracts out of the archiving scope, i.e. the contracts still in fulfillment, will all be migrated to
the formal databank and continued to be fulfilled.
Engineeri Plan dates of the engineering do not need to be maintained in the system any more; only Improved
ng actual goods delivery, goods arrival, work start, work completion, PAC, customer’s signing
progress
off of PAC, FAC, and customer’s signing off of FAC will be remained.
For non-IFS contract, progress is input on the order. For IFS contract, progress is
input on the engineering
Goods arrival date of the engineering and the order is directly transferred from APA Simplified
system of Huawei Supply Chain and does not need to be maintained.
Contract For normal sales contract, progress is input in the new EPMS system to trigger revenue Simplified
fulfillmen recognition in RCR1.0.
t scope
Intercompany contracts and stock contracts will not be confirmed by EPMS any longer
and they will be directly confirmed in RCR 1.0
Huawei users shall log in to the new system with Huawei W3 account and pass code. Simplified
Account The users can apply for the permission by directly logging in to the new system and the
permissio
permission becomes valid after being approved by the director.
n
System Merging into the latest “Integrated Service Delivery Platform (ISDP)” of the corporate and Improved
architect adopting the newest development framework, it is flexible for future improvement.
ure
Rep. office
document Transfer shipment
date and arrival Review engineering
approver date from APA documents
Close
System engineering
Modify engineering
administrator progress information problems
Revenue
Change points of progress management: recognition RCR1.0
1. It will only be used as the reference of engineering
acceptance. Plan deviation rate and work completion rate, etc.
will not be taken as performance appraisal metrics. Therefore,
plans are not needed any more; instead, only the actual
work start, work completion, PAC, and FAC dates need to
be managed.
Role Operation
ISDP-iEngineer: HW Engineer(View) Contract View, Engineering View, Task Order View, Engineering Document
ISDP-iEngineer: HW Engineer(Edit) Contract & Engineering &Task Order View, Upload Engineering Document,
ISDP-iEngineer: Document Approver Contract & Engineering & Task Order View, Edit Engineering attachment
Steps:
1 Open the Web UI homepage of ISDP system. Input user name and pass code to log in to the system. If you do
not have the system access permission yet, it will automatically redirect to permission application page. Select
the permission application of the third system.
4
2 3
Steps:
1 Open Web UI homepage. Click 【Engineering Progress & Quality】. Select 5 Click “Submit”
【Apply for Privilege】 and then select 【Huawei privilege application】. 6 Check the role descriptions
2 Select “Business Role” (Note: there are role descriptions on the page)
3 Select “Rep. Office”
5 6
Steps:
1 Open Web UI homepage. Click Engineering Progress & Quality and click “Privilege Approval”.
2 Set up Approval Status as Waiting For Approval.
3 Click “Search”.
5 After the accounts are approved, the privileges become valid immediately and the applicants will receive an email notification.
2 2
2
3 5
Steps:
1 Open Web UI homepage. Click Engineering Progress & Quality and click “Contract Search”.
2 Input search conditions such as Contract No. and Offset Loan Contract No., or input other search conditions in “Advanced Search”.
3 Click “Search”.
4 Click the Contract No. in search result to open the contract detail page.
Steps:
1 Go to Contract Details page. Click “Edit Contract Info” to go to contract editing page. (Note: Please see next page for editing operation)
2 Search contract Maintenance Information.
4 Search all engineering information of the contract. Click Engineering No. to go to engineering detail page.
5 Search all orders under goods preparation of the contract. Click Order No. to go to order detail page.
Steps:
1 Upload contract attachment (Note: It is suggested to use IE9/IE10 or Google browser to upload documents and not to use 360 browser)
2 Input remarks information.
3 Click “Submit”.
Steps:
1 Log in to the system. Click Engineering Progress & Quality and click “Order Search”.
2 Enter search conditions to search.
3 In the search result list, click Order No. to go to order detail page.
3
By inputting contract No., you can search all
the engineering under the contract
3
Export engineering Export product Select field for exporting Export P-item details
search result configuration engineering progress and summary
information information
4 5 5 5 5
Steps:
1 Open Web UI homepage. Click Engineering Progress & Quality and select “Engineering Progress & Document Input”.
2 Input Engineering No. (Note: By inputting contract No., you can search all the engineering under the contract)
3 By inputting Offset Loan Contract No., you can search the offset contract. You can also input other conditions (e.g. Engineering No., and Product Type, etc.)
4 Click “Search”.
5 Four types of reports can be exported on Engineering Progress Search page.
1
2 3 4
3
Steps:
1 Click “Edit Progress or Document” to go to engineering document
uploading & editing interface.
The management granularity in the new system
becomes larger by removing the plan date while 2 Search all orders under goods preparation of the engineering.
keeping actual progress date and input date. 3 Go to editing interface of all orders under goods preparation of the
6
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential 17
Input Engineering Order Progress
Role of operation: ISDP-iEnginner :HW Engineer(Edit)
3 4 5
Steps:
1 Open Web UI homepage. Click “Engineering Progress & Quality”. Select “Engineering Progress & Document Input”. Click an engineering and go
to the detail page.
2 Click “Edit Progress or Document”
Steps: 6
1 Open Web UI homepage. Click “Engineering Progress & Quality”. Select “Engineering Progress & Document Input”. Click an engineering and go
to the detail page.
2 Click “Edit Progress or Document”
4
4
6
3
Steps: 7
1 Open Web UI homepage. Click “Engineering Progress & Quality”. Select “Engineering Progress & Document Input”. Click an engineering and
go to the detail page. About the verification: When engineering document waits
for approval, the document of the same type cannot be
2 Click “Edit Progress or Document”
uploaded again. After the document passes or fails in the
3 Click “Modify Engineering Document” approval, the document of the same type can be
4 When uploading engineering document, all the input information can all be modified. uploaded again. For the engineering document which
5 Upload engineering documents of the same type (Please do not use 360 browser) does not need approval, the document of the same type
6 Delete engineering document 7 Click “Confirm” can be uploaded.
3 4
2
Steps:
1 Open Web UI homepage. Click “Engineering Progress & Quality”. Select “Engineering Progress & Document Input”. Click an engineering and go
to the detail page.
2 Click “Edit Progress or Document”
3 Select the engineering document to be deleted (Note: The engineering documents that have passed approval cannot be deleted. The documents
that do not pass approval or wait for approval can be deleted)
4 Click “Delete Engineering Document”
5 Click “OK”
Steps:
1 Open Web UI homepage. Click “Engineering Progress & Quality”. Select “Engineering Document Search & Approve”.
2 Select “Waiting for Approve”.
3 Click “Search”.
Search basic
engineering information
Search engineering
progress information
Steps:
1 Click Engineering No. on engineering document search interface to go to document approval interface. Click “Engineering Approve”.
2 Select “Approval Result”.
3 Click “Submit”.
Steps: 1
1 Select “Engineering Progress & Quality” and then select “Engineering Progress & Document Input”.
2 Click “Edit Progress or Document”.
6
3 Select the engineering document, for which approval result needs to be modified.
Steps:
1 Open Web UI homepage. Click “Engineering Progress & Quality”. Select “Create Problem”.
2 Fill in the problem information.
3 Click “Submit”.
ISDP-iEngineer Support:
W3 Account Responsibility And Role
Lin ping 00134293 BA, in charge of solution design and requirements of global scope
Zhu Yufang wx285088 BA, in charge of solution design and requirements of global scope