Sunteți pe pagina 1din 7

Ref.

: HQ-PO-TRN-01

Page: 1 of 7
WELL CONTROL MANUAL
Issued:

Revision: 3.0

TRIP SHEET

 Column 1: This is the stand list as numbered when racked in the derrick. 
Record single stands for the first 5 stands under normal 
circumstances.  Then record every 3 to 5 stands.

 Column 2: Note the trip tank gauge reading.  The difference in reading 
after an increment will be the measured amount of mud used
to fill the hole for that increment.

 Column 3: The displacement of the number of stands for one increment.

 Column 4: Actual measured amount of mud used to fill the hole for that 
increment.

 Column 5: Cumulative sum of numbers in column 4.

 Column 6: Results of subtraction of column 3 from column 4.  A negative 
number here may indicate the hole did not take enough 
mud (possible swabbing).  A positive number may indicate 
the hole took too much mud (losses).

 Column 7: Cumulative sum of the numbers in column 6.  This column 
gives the total amount of fluid swabbed into the hole or the 
total losses since the beginning of the trip.
RIG: _______________________ DATE: __________________
WELL: _____________________ TIME: __________________
DRILLER: ___________________ DEPTH: __________________

TRIP SHEET
REASON FOR THE TRIP: ________________________________________________________
Number of stands to have top of DC’s one stand below BOP’s:
_______________________

Tic Displacement: DC1 DC2 OTHE HWDP DP1 DP2

PULL  Size
EVEN l/m or
Single l/stand
Double x m or stands
÷ 1000 = Vol.
(m3)

STAN Trip Calculated Measured Discrepancy Remarks


Tank Hole fill Hole fill (litres)
Nb (liters
)
Gauge per increment per Accumul. Per Accumul.
Incremen Incremen
t t
1 2 3 4 5 6 7 8
0
Note: Units and Calculations are in Metric System.
STAN Trip Calculated Measured Discrepancy
D Tank Hole fill Hole fill (litres) Remarks
Nb. (liters)
Gauge per increment per Accumul. per Accumul.
Incremen Incremen
t t
1 2 3 4 5 6 7 8

Note: Units and Calculations are in Metric System.


RIG: _______________________ DATE: ___________________
WELL: ______________________ TIME: ____________________
DRILLER: ____________________ DEPTH: ____________________

TRIP SHEET
REASON FOR THE TRIP:
_____________________________________________________________
Number of stands to have top of DC’s one stand below BOP’s:
_______________________

Tic Displacement: DC1 DC2 OTHE HWDP DP1 DP2


k R
PULL  Size
EVEN bbl/ft or
Single bbl/stand
Double x ft or stands
= Vol. (bbls)

STAN Trip Calculated Measured Discrepancy


D Tank Hole fill (bbls) Hole fill (bbls) Remarks
Nb
Gauge per increment per Accumul. per Accumul.
Incremen Incremen
t t
1 2 3 4 5 6 7 8
0
Note: Units and Calculations are in Oilfield System.
STAN Trip Calculated Measured Discrepancy
D Tank Hole fill (bbls) Hole fill (bbls) Remarks
Nb
Gauge per increment per Accumul. per Accumul.
Incremen Incremen
t t
1 2 3 4 5 6 7 8

Note: Units and Calculations are in Imperial System.

S-ar putea să vă placă și