DL+LL+CL+BW+TB
DL+LL+CL+0.75WL1+TB
DL+LL+CL+0.75WL2+TB
DL+LL+CL+0.75WL3+TB
DL+LL+CL+0.75WL4+TB
DL+LL+CL+0.75WL5+TB
DL+LL+CL+0.75WL6+TB
DL+0.75LL+CL+0.75WL1
DL+0.75LL+CL+0.75WL2
DL+0.75LL+CL+0.75WL3
DL+0.75LL+CL+0.75WL4
DL+0.75LL+CL+0.75WL5
DL+0.75LL+CL+0.75WL6
0.6 DL +WL 1
0.6 DL +WL 2
0.6 DL +WL 3
0.6 DL +WL 4
0.6 DL +WL 5
0.6 DL +WL 6
DL+CL+S
ction-2
m
m
ction-2
FX
73.00
Project: TEMPLE Date: 15-Dec-18
Title: Designed: ASR
Job No.: 1 Footing Design Checked: AG
Footing ID: F1
S.B.C 200 kN / m2 LX = 2.4
Concrete grade, fck 30 N / mm2
Steel Strength, fy 460 N / mm2
Column size, Cx 300 mm L1Y = 1.1
Column size, Cy 200 mm
Footing size provided: 2.4 X 2.4 (m) Additional Moments: ( Due to Fx and Fy)
MX1=FX x D = 31.025 kN-m
Area Provided = 5.76 m2 OK MY1=FZ x D = 0 kN-m
Final Loads :
Depth of Footing : P = 594.64 ( kN )
Footing Depth = 0.5 m MX = 31.0 ( kN m )
Eff. depth,d = 0.425 m MY = 0.0 ( kN m )
Pmax = 116.7 kN / m2 OK
Pmin = 89.8 kN / m2 OK