Documente Academic
Documente Profesional
Documente Cultură
Day 2
7 09:30 AM 11:20 AM Steam Systems, Low Pressure Boilers, Chapter 4, with Videos
8 11:30 AM 12:30 PM Fuel System (Combustion Controls), Low Pressure Boilers, Chapter 5, with
Video; Draft System, Low Pressure Boilers, Chapter 6
Day 3
01:30 PM 04:15 PM National Board Inspection Code, Part 2, Inspection (cont.), and Inspection
Forms Checklist
Day 5
15 01:30 PM 03:10 PM National Board Inspection Code, Part 3, Repair and Alterations Overview
Day 6
Day 7
22 09:30 AM 10:20 AM Workshop: NBIC Calculations (Remaining Life and Safety Valve Capacity)
24 11:30 AM 12:15 PM CSD-1, Controls and Safety Devices (Parts CF, CG, and CM)
01:30 PM 03:30 PM CSD-1, Controls and Safety Devices (Parts CF, CG, and CM) (cont.)
Day 9
Day 10