HAZARD IDENTIFICATION & RISK ASSESSMENT Page1 of 9

(S*) Severity (F*) Frequency (P*) Probability (S+F+P=C***)


TASK – EXCAVATION OF ROAD WITH TLB (R.A – 04) DATE:

TASK RISK AND HAZARD S F P C RATING CONTROL BY WHOM


A1) Communicate risk Workers unaware of identified hazards and 4 4 -3 5 Low
Risk assessments to be 2.9.2
assessment for task. safety measures for the job – injury to communicated to workers before job
workers. commences.

Workers to sign acknowledgement 2.9.2


of communication on risk
assessment document.

Risk assessments to be revised 2.17.1


every 30 days or when new hazards
or controls are identified.

A2) Draft and communicate Workers unaware of the task procedure, the 4 4 -3 5 Low 2.9.2
DSTI to be communicated to
DSTI for daily activities. identified hazards and safety measures for workers before shift commences.
daily activities – injury to workers and
damage to equipment. 2.9.2
Workers to sign acknowledgement
of communication on DSTI
document.

DSTI to be counter signed by 2.6.1 2.9.2 / 2.6.1 /


or safety officer. 2.17.1

A3) Establish safe task Vehicles getting stuck in wet, muddy 6 4 0 10 High Vehicles to drive on designated 2.9.2 / TLB
environment. conditions. routes only. Operator
TLB falling over on soft uneven ground. TLB to extend outriggers before
commencing with lift. Out rigger
mats (sleeper wood) to be placed
under outriggers in soft or uneven
ground conditions.

Task areas not identified – injury to workers, Task areas to be identified with
damage to equipment and vehicles. orange beacons or flags man.

Unauthorised persons in task area – injury to Only S&P workers allowed in task
person. areas.

Tripping and slipping hazards – rocks, mud, Be aware of your work environment. All
Do not walk or stand on loose rocks,
HAZARD IDENTIFICATION & RISK ASSESSMENT Page2 of 9
(S*) Severity (F*) Frequency (P*) Probability (S+F+P=C***)
TASK – EXCAVATION OF ROAD WITH TLB (R.A – 04) DATE:

wet piping, wire etc. wet piping, mud etc. Make sure the
soles of your safety boots are clean
before climbing onto or over
anything.
B1) Check tools and Use of defective tools and equipment – injury 6 4 -3 7 Medium Tools and equipment to be visually All
equipment. to persons. inspected and tested before use.
Defective tools and equipment to be
returned to store for repairs or
replacement.

Use of improper tools and equipment – injury Tools and equipment to be on 2.9.2 /
to persons. register, inspected monthly and Operator /
colour coded. No home made tools 2.17.1
allowed on site.

B2) Check competency of Incompetent workers – injury to persons, 4 4 -3 5 Low Workers to be competent to do the 2.9.2
workers. damage to equipment. task delegated to them.

Use of machinery and vehicle by unlicenced / Drivers of vehicles and operators of


unappointed / uncertified operators –injury to machinery to be licenced / certified 2.9.2 / 2.6.1 /
persons, damage to vehicles / machinery. and appointed. 2.17.1
Road accidents.

B3) Issue workers with Workers not wearing PPE – injury to 2 4 0 6 Low Workers to wear prescribed PPE – 2.9.2 / All
necessary PPE. workers. safety boots, hard hat, hearing
protection, safety glasses, and
leather or rubber gloves.

PPE to be SABS or GME approved. 2.9.2 / 2.6.1 /


Workers wearing incorrect PPE – injury to 2.17.1
workers.

Sufficient PPE to be stocked on site. 2.9.2 / 2.6.1 /


PPE not available to workers – Workers Workers to sign for PPE received. 2.17.1
exposed to greater risk of injury.
HAZARD IDENTIFICATION & RISK ASSESSMENT Page3 of 9
(S*) Severity (F*) Frequency (P*) Probability (S+F+P=C***)
TASK – EXCAVATION OF ROAD WITH TLB (R.A – 04) DATE:

SATURDAY 01/07/2006
C1) Post construction Traffic not aware of activities in the road 4 4 -3 5 Construction signage to be posted 2.9.2
warning signs in the road. ahead. minimum 100 metres before
construction site.

C2) Prepare detour route Damage to shallow underground services. 2 4 0 6 Supervisor and TLB operator to 2.9.2
with TLB and by hand. access detour route before
preparation commences and
beware of signs of underground
services during preparation.
Poor road surface.
Ensure detour road surface is
properly prepared and safe to use.
Injury from physical labour. Workers to wear hand protection,
eye protection, hard hats, safety
boots, high visibility vests (dust
masks if necessary).
Electrocution from overhead power lines. TLB not to establish directly under
power lines and work. Do not lift the
boom above the height of the cabin.
Injury from moving TLB.
Workers to stand clear of moving
TLB. TLB operator to beware of
workers and sound hooter if
necessary.

C3) Demarcate detour route Route not clearly defined. 4 4 -3 5 Detour route to be clearly 2.9.2
with reflective lineators. demarcated. Lineators to be spaced
approximately 5 metres apart.
Lineators falling over. Ensure lineators are properly
secured in bases and weighted with
rock or sand bags.
HAZARD IDENTIFICATION & RISK ASSESSMENT Page4 of 9
(S*) Severity (F*) Frequency (P*) Probability (S+F+P=C***)
TASK – EXCAVATION OF ROAD WITH TLB (R.A – 04) DATE:

SUNDAY 02/07/2006
C4) Post STOP / GO signs Signage not clearly visible to road users. 4 4 -3 5 STOP / GO signage to be posted on 2.9.2
at designated spot. the verge of the road and clearly
visible to road users.
C5) Post flags men to man Flags men not visible to road users. 4 4 -3 5 Flags men to wear high visibility 2.9.2
STOP / GO signs. vests.
Flags men to use a red flag to wave
Flags men being run / knocked over by down oncoming traffic. Flags men
vehicle. not to stand in the line of oncoming
traffic.

Miscommunication between flags men. Flags men to be in visual contact


with each other (approximately
150m).

C6) Barricade road with Insufficient barricade to block the road. 2 4 0 6 Two plastic new jersey barricades to 2.9.2
plastic new jersey barriers. be used to block each side of the
road.

C7) Demarcate traffic flow Flow direction of traffic poorly demarcated. 4 4 -3 5 Lineators to be evenly spaced and 2.9.2
with reflective lineators. point in the direction in which the
traffic must move.

C8) Demarcate road Misalignment of pipe route. 2 4 -3 3 Gani Fredericks to ensure correct 2.9.2
excavation path. alignment of pipe route.

C9) Saw-cut road with Incompetent person using the road saw. 4 4 -3 5 Only competent operator to use 2.9.2
machine. Injury to worker. road saw.
HAZARD IDENTIFICATION & RISK ASSESSMENT Page5 of 9
(S*) Severity (F*) Frequency (P*) Probability (S+F+P=C***)
TASK – EXCAVATION OF ROAD WITH TLB (R.A – 04) DATE:

C10) Position TLB and TLB falling over. 6 4 -3 7 Ensure TLB is established on firm 2.9.2
excavate road. ground and out rigger jacks are
extended.
Collision between TLB and traffic. TLB not to be established closer
than 2m from the lineators on the
detour road.
Electrocution from overhead power lines.
TLB not to be established directly
under the power lines.

C11) Lift and lower HDPE Pipe bending during lift. 4 4 -3 5 Two flat nylon slings to be used to 2.9.2
pipe into excavation with a lift pipe.
crane.
Two guide ropes to be used to direct
Pipe colliding with traffic or structures. and guide pipe into position.
Only certified rigger to conduct
Injury during lifting. rigging and lifting of pipe.

Overhead lifting. No overhead lifting allowed.

C12) Backfill excavation with Incorrect backfill material being used. 2 4 -3 3 Use only selected backfill material. 2.9.2
TLB.
Damage to pipe. Ensure pipe is not damaged by TLB
or excessive dumping of material.
Do not operate TLB directly under
Electrocution from overhead power lines. power lines.

C13) Level backfill by hand. Slipping and falling on loose footing. 4 4 0 8 Ensure sure footing while working. 2.9.2
Injury from other workers. Ensure good communication
between workers. Do not work on
top of each other.
Eye and hand injuries. Wear eye and hand protection while
HAZARD IDENTIFICATION & RISK ASSESSMENT Page6 of 9
(S*) Severity (F*) Frequency (P*) Probability (S+F+P=C***)
TASK – EXCAVATION OF ROAD WITH TLB (R.A – 04) DATE:

leveling the backfill.

C14) Compact backfill with a Incompetent operator. 4 4 0 8 Only competent operator to use
fuel driven whacker. whacker.
Other workers to stand clear of
Injury from Whacker. whacker while it is in use.
Wacker operator to wear hearing
Noise. protection.

C15) Resurface road with Poor workmanship. 2 4 -3 3 Gani Fredericks to ensure quality 2.9.2
premix tar. workmanship of the tarring of the
road.
Insufficient tar to repair road. Gani Fredericks to ensure sufficient
bags of tar are available to patch
the road.
Handling of tar without required PPE.
Hand protection to be worn while
handling the tar.

C16) Flatten new tar with Injury from Bomag. 4 4 0 8 Bomag operator to be competent. 2.9.2
Bomag.

C17) Remove tools, Poor house keeping. Collision between 4 4 0 8 Ensure tools, equipment and 2.9.2
equipment and machinery vehicle and construction equipment. machinery are removed from the
from the road. road and placed orderly on the
vehicles or away from the road.

C18) Gani Fredericks to Road not safe to use. 4 4 0 8 Gani Fredericks to assess and 2.9.2
assess road as safe to use. declare the road as safe to use
before opening it for use.

C19) Close off the detour Flags men abandoning their post at STOP / 4 4 0 8 Flags men to stay at their posts until
with the lineators from the GO signs. the detour has been closed and the
road. road opened.
HAZARD IDENTIFICATION & RISK ASSESSMENT Page7 of 9
(S*) Severity (F*) Frequency (P*) Probability (S+F+P=C***)
TASK – EXCAVATION OF ROAD WITH TLB (R.A – 04) DATE:

Detour not sufficiently closed off. Detour to be closed with the


lineators from the road.

C20) Remove the new jersey Collision between vehicles and barriers. 4 4 0 8 Plastic new jersey barriers to be 2.9.2
barriers from the road. removed from the road completely.

C21) Remove flags men and Road accident. 4 4 0 8 Flags men and signage to be 2.9.2
STOP / GO signage from the removed when detour has been
road side. totally closed and the road opened
for use.

C22) Open the road to traffic. Road accident. 4 4 0 8 Road to be cleared of all obstacles. 2.9.2
House keeping to be to standard. All
Workers run / knocked over by moving workers to wear high visibility vests.
vehicles.

D1) Make task area safe at Loss of tools and equipment, injury to 2 4 0 6 Low Close out DSTI to be conducted at 2.9.2 / Worker
end of shift. persons. end of shift. Tools and equipment to
be returned to store at the end of
shift.