Sunteți pe pagina 1din 8

Projekt No.

: 20 0100 Tender Documents (EPC-Contractor)


Department: GE 1, Electrical Engineering ALMA 'European' 23kV POWER SUPPLY PROJECT
Date: August 11, 2008 Atacama Large Millimeter Array

Project Sheet- Format


File name Li-Drawing No. ESO/ALMA Drawing No. Text Scale Datum Index Datum Revision
Phase No. in mm Notes:

UPDATE CT AND
OVERALL SINGLE LINE DIAGRAM - OHL
WT DATA,
05 ALMA-20.05.00.00-010-C-DWG 20 0100 EV 7100 R 510 ALMA-20.05.00.00-010-C-DWG ALMA POWER SYPPLY SYSTEM 2000x841 2007-Nov-11 C 2008-Aug-11
INTERFACE AOS
GRID CONNECTION
DISTRIBUTION
OVERALL SINGLE LINE DIAGRAM - UGCL
05 ALMA-20.05.00.00-013-A-DWG 20 0100 EV 7100 R 517 ALMA-20.05.00.00-013-A-DWG ALMA POWER SYPPLY SYSTEM 2000x841 2008-Aug-11
GRID CONNECTION

05 ALMA-20.05.00.00-020-B-DWG 20 0100 EV 8100 R 550 ALMA-20.05.00.00-020-B-DWG CONFIGURATION OF DIN A0 2007-Nov-11 B 2008-Aug-11 REVISION
SUBSATION AUTOMATION SYSTEM

CONFIGURATION OF
05 ALMA-20.05.00.00-030-A-DWG 20 0100 EV 8100 R 560 ALMA-20.05.00.00-030-A-DWG DIN A0 2008-Aug-11
FIBRE OPTIC CONNECTION

MV-SWG PROTECTION AND CONTROL CONCEPT


05 ALMA-20.05.00.00-040-A-DWG 20 0100 EV 8100 R 500 ALMA-20.05.00.00-040-A-DWG 841x297 2008-Aug-11
ALLOCATION OF TYPICAL DIGRAMS

MV-SWG PROTECTION AND CONTROL CONCEPT


05 ALMA-20.05.00.00-041-A-DWG 20 0100 EV 8100 R 501 ALMA-20.05.00.00-041-A-DWG TYPICAL DIAGRAM FOR FEEDER NOS: DIN A2 2008-Aug-11
AJA01, AJA02, AJA09, AJA13

MV-SWG PROTECTION AND CONTROL CONCEPT


05 ALMA-20.05.00.00-042-A-DWG 20 0100 EV 8100 R 502 ALMA-20.05.00.00-042-A-DWG TYPICAL DIAGRAM FOR FEEDER NOS: DIN A2 2008-Aug-11
AJA03, AJA12

MV-SWG PROTECTION AND CONTROL CONCEPT


05 ALMA-20.05.00.00-043-A-DWG 20 0100 EV 8100 R 503 ALMA-20.05.00.00-043-A-DWG TYPICAL DIAGRAM FOR FEEDER NOS: DIN A2 2008-Aug-11
AJA04, AJA10, AJB05, AJB12

MV-SWG PROTECTION AND CONTROL CONCEPT


05 ALMA-20.05.00.00-044-A-DWG 20 0100 EV 8100 R 504 ALMA-20.05.00.00-044-A-DWG TYPICAL DIAGRAM FOR FEEDER NOS: DIN A2 2008-Aug-11
AJA11, AJA14, AJB03, AJB04, AJB13

MV-SWG PROTECTION AND CONTROL CONCEPT


05 ALMA-20.05.00.00-045-A-DWG 20 0100 EV 8100 R 505 ALMA-20.05.00.00-045-A-DWG TYPICAL DIAGRAM FOR FEEDER NOS: DIN A2 2008-Aug-11
ACA01, AJA06

MV-SWG PROTECTION AND CONTROL CONCEPT


05 ALMA-20.05.00.00-046-A-DWG 20 0100 EV 8100 R 506 ALMA-20.05.00.00-046-A-DWG TYPICAL DIAGRAM FOR FEEDER NOS: DIN A2 2008-Aug-11
AJA05, AJA08, AJA07, AJB06, AJB07, AJB09

MV-SWG PROTECTION AND CONTROL CONCEPT


05 ALMA-20.05.00.00-047-A-DWG 20 0100 EV 8100 R 507 ALMA-20.05.00.00-047-A-DWG TYPICAL DIAGRAM FOR FEEDER NOS: DIN A2 2008-Aug-11
AJB08, AJD03, 04, 05, 06, 10, 11, 12, 13

MV-SWG PROTECTION AND CONTROL CONCEPT


05 ALMA-20.05.00.00-048-A-DWG 20 0100 EV 8100 R 508 ALMA-20.05.00.00-048-A-DWG TYPICAL DIAGRAM FOR FEEDER NOS: DIN A2 2008-Aug-11
AJB10, 11, AJC01, 07, 08, 14, AJD07, 09,

MV-SWG PROTECTION AND CONTROL CONCEPT


05 ALMA-20.05.00.00-049-A-DWG 20 0100 EV 8100 R 509 ALMA-20.05.00.00-049-A-DWG TYPICAL DIAGRAM FOR FEEDER NOS: DIN A2 2008-Aug-11
AJC03, 04, 05, 06, 10, 11, 12, 13

Annex 1

Page 1 of 8
Projekt No.: 20 0100 Tender Documents (EPC-Contractor)
Department: GE 1, Electrical Engineering ALMA 'European' 23kV POWER SUPPLY PROJECT
Date: August 11, 2008 Atacama Large Millimeter Array

Project Sheet- Format


File name Li-Drawing No. ESO/ALMA Drawing No. Text Scale Datum Index Datum Revision
Phase No. in mm Notes:

OSF 110-kV SUBSTATION


05 ALMA-20.05.03.00-010-A-DWG 20 0100 EV 7100 Q 551 ALMA-20.05.03.00-010-A-DWG 841x420 1:100 2008-Aug-11
LAYOUT - FEEDER 1

OSF 110-kV SUBSTATION


05 ALMA-20.05.03.00-011-A-DWG 20 0100 EV 7100 Q 553 ALMA-20.05.03.00-011-A-DWG LAYOUT - FEEDER 1 DIN A1 1:100 2008-Aug-11
3D-VIEW

110-kV SUBSTATION-GANTRY
05 ALMA-20.05.03.05-001-A-DWG 25 0100 EV 7900 Q 530 ALMA-20.05.03.05-001-A-DWG DIN A1 2008-Aug-11
EARTHING AND LIGHTNING PROTECTION

110-kV SUBSTATION
05 ALMA-20.05.03.01-101-A-DWG 20 0100 BA 5100 Q 510 ALMA-20.05.03.01-101-A-DWG DIN A1 1:200 2008-Aug-11
TOP VIEW

110-kV SUBSTATION
05 ALMA-20.05.03.01-102-A-DWG 20 0100 BA 5100 Q 511 ALMA-20.05.03.01-102-A-DWG 931x664 1:100 2008-Aug-11
LAYOUT OF FOUNDATIONS

110-kV SUBSTATION
05 ALMA-20.05.03.01-103-A-DWG 20 0100 BA 5100 Q 512 ALMA-20.05.03.01-103-A-DWG TRANSFORMERS FOUNDATIONS FORMWORK 1189x594 1:25 2008-Aug-11
DRAWING

110-kV SUBSTATION
05 ALMA-20.05.03.01-104-A-DWG 20 0100 BA 5100 Q 513 ALMA-20.05.03.01-104-A-DWG TRANSFORMERS FOUNDATIONS REINFORCEMENT DIN A0 1:25 2008-Aug-11
DRAWING

110-kV SUBSTATION
05 ALMA-20.05.03.01-105-A-DWG 20 0100 BA 5100 Q 514 ALMA-20.05.03.01-105-A-DWG TRANSFORMERS FOUNDATIONS SLAB DIN A0+ 1:25 2008-Aug-11
REINFORCEMENT DRAWING

LAYOUT
05 ALMA-20.05.04.00-001-A-DWG 20 0100 EV 7100 Q 580 ALMA-20.05.04.00-001-A-DWG OSF SUBSTATION AND DIN A0 1:500 2008-Aug-11
OSF TECHNICAL FACILITY AREA

LAYOUT
05 ALMA-20.05.04.00-005-A-DWG 20 0100 EV 7100 Q 581 ALMA-20.05.04.00-005-A-DWG DIN A0 1:250 2008-Aug-11
OSF 110-kV AND MV SUBSTATION AREA

LAYOUT
05 ALMA-20.05.04.00-010-A-DWG 20 0100 EV 7100 Q 565 ALMA-20.05.04.00-010-A-DWG OSF MV SUBSTATION DIN A2 1:200 2008-Aug-11
TOP VIEW

OSF MV SUBSTATION
05 ALMA-20.05.04.00-020-A-DWG 20 0100 EV 5200 Q 511 ALMA-20.05.04.00-020-A-DWG DIN A1 1:50 2008-Aug-11
INDOOR CONTAINER LAYOUT

OSF SUBSTATION
05 ALMA-20.05.04.01-101-A-DWG 20 0100 BA 5100 Q 520 ALMA-20.05.04.01-101-A-DWG DIN A2+ 1:200 2008-Aug-11
TOP VIEW

OSF SUBSTATION
05 ALMA-20.05.04.01-102-A-DWG 20 0100 BA 5100 Q 521 ALMA-20.05.04.01-102-A-DWG DIN A1 1:200 2008-Aug-11
FOUNDATION DRAWING

Annex 1

Page 2 of 8
Projekt No.: 20 0100 Tender Documents (EPC-Contractor)
Department: GE 1, Electrical Engineering ALMA 'European' 23kV POWER SUPPLY PROJECT
Date: August 11, 2008 Atacama Large Millimeter Array

Project Sheet- Format


File name Li-Drawing No. ESO/ALMA Drawing No. Text Scale Datum Index Datum Revision
Phase No. in mm Notes:

OSF SUBSTATION
05 ALMA-20.05.04.01-103-A-DWG 20 0100 BA 5100 Q 522 ALMA-20.05.04.01-103-A-DWG OSF CONTAINER SLAB FORMWORK AND 880x594 1:50 2008-Aug-11
REINFORCEMENT DRAWING

OSF CONTAINER WHITE TANK FORMWORK


05 ALMA-20.05.04.01-104-A-DWG 20 0100 BA 5100 Q 523 ALMA-20.05.04.01-104-A-DWG 1031x594 1:50 2008-Aug-11
DRAWING

OSF SUBSTATION
05 ALMA-20.05.04.01-105-A-DWG 20 0100 BA 5100 Q 524 ALMA-20.05.04.01-105-A-DWG 834x297 1:50 2008-Aug-11
OSF CONTAINER WHITE TANK WALL VIEW

OSF SUBSTATION
05 ALMA-20.05.04.01-106-A-DWG 20 0100 BA 5100 Q 525 ALMA-20.05.04.01-106-A-DWG OSF CONTAINER WHITE TANK REINFORCEMENT DIN A0+ 1:25 2008-Aug-11
DRAWING

OSF SUBSTATION
05 ALMA-20.05.04.01-107-A-DWG 20 0100 BA 5100 Q 526 ALMA-20.05.04.01-107-A-DWG OSF CONTAINER STEEL CONSTRUCTION DIN A1 1:100 2008-Aug-11
PLAN AND SECTION

OSF SUBSTATION
05 ALMA-20.05.04.01-108-A-DWG 20 0100 BA 5100 Q 530 ALMA-20.05.04.01-108-A-DWG TRANSFORMER BUILDING SLAB AND WHITE TANK 834x420 1:50 2008-Aug-11
FORMWORK DRAWING

OSF SUBSTATION
05 ALMA-20.05.04.01-109-A-DWG 20 0100 BA 5100 Q 531 ALMA-20.05.04.01-109-A-DWG TRANSFORMER BUILDING SLAB AND WHITE VAT DIN A1 1:50; 1:20 2008-Aug-11
REINFORCEMENT DRAWING

OSF SUBSTATION
05 ALMA-20.05.04.01-110-A-DWG 20 0100 BA 5100 Q 532 ALMA-20.05.04.01-110-A-DWG TRANSFORMER BUILDING STEEL CONSTRUCTION DIN A0 1:25 2008-Aug-11
PLAN AND SECTION

EARTHING SYSTEM DETAILS


05 ALMA-20.05.04.01-111-B-DWG 20 0100 BA 5100 Q 540 ALMA-20.05.04.01-111-B-DWG DIN A1 2008-Mar-31 B 2008-Aug-11 DETAIL 3
OSF MV SUBSTATION

SINGLE LINE DIAGRAM


05 ALMA-20.05.04.02-002-B-DWG 20 0100 EV 7100 R 521 ALMA-20.05.04.02-002-B-DWG OSF-MV-SS AUX. POWER SUPPLY DIN A2 2007-Nov-11 B 2008-Aug-11 REVISION
400V AC AND 220V DC SWITCHGEAR

CABLE ROUTING
05 ALMA-20.05.04.02-050-B-DWG 20 0100 EV 7100 Q 585 ALMA-20.05.04.02-050-B-DWG OSF MV SUBSTATION AND DIN A0 1:500 2007-Nov-11 B 2008-Aug-11 UGCL OPTION
OSF TECNICAL FACILITY AREA

CABLE ROUTING
05 ALMA-20.05.04.02-051-B-DWG 20 0100 EV 7100 Q 586 ALMA-20.05.04.02-051-B-DWG DIN A0 1:250 2007-Nov-11 B 2008-Aug-11 UGCL OPTION
OSF 110-KV AND MV SUBSTATION

CABLE ROUTING
05 ALMA-20.05.04.02-052-B-DWG 20 0100 EV 7100 Q 587 ALMA-20.05.04.02-052-B-DWG DIN A2 1:100 2007-Nov-11 B 2008-Aug-11 UGCL OPTION
OSF MV SUBSTATION

CABLE ROUTE SECTIONS


05 ALMA-20.05.04.02-053-B-DWG 20 0100 EV 7100 Q 589 ALMA-20.05.04.02-053-B-DWG DIN A1 1:10 2008-Aug-11
OSF MV SUBSTATION

Annex 1

Page 3 of 8
Projekt No.: 20 0100 Tender Documents (EPC-Contractor)
Department: GE 1, Electrical Engineering ALMA 'European' 23kV POWER SUPPLY PROJECT
Date: August 11, 2008 Atacama Large Millimeter Array

Project Sheet- Format


File name Li-Drawing No. ESO/ALMA Drawing No. Text Scale Datum Index Datum Revision
Phase No. in mm Notes:

05 ALMA-20.05.04.04-001-A-DWG 20 0100 EV 4300 P 511 ALMA-20.05.04.04-001-A-DWG OSF MV SS FIRE PROTECTION INSTALLATION DIN A1 1:100 2008-Aug-11

FIRE PROTECTION INSATLLATION


05 ALMA-20.05.04.04-002-A-DWG 20 0100 EV 4300 P 512 ALMA-20.05.04.04-002-A-DWG DIN A2 1:50 2008-Aug-11
OSF - AUX.TRANSFORMER BUILDING

OSF MV SS FIRE ALARM SYSTEM


05 ALMA-20.05.04.04-003-A-DWG 20 0100 EV 4300 R 515 ALMA-20.05.04.04-003-A-DWG DIN A2 2008-Aug-11
RISER DIAGEAM

EARTHING SYSTEM
05 ALMA-20.05.04.05-001-A-DWG 20 0100 EV 7900 Q 511 ALMA-20.05.04.05-001-A-DWG DIN A0 1:250 2008-Aug-11
OSF 110-KV AND MV SUBSTATION

EARTHING SYSTEM
05 ALMA-20.05.04.05-002-A-DWG 20 0100 EV 7900 Q 512 ALMA-20.05.04.05-002-A-DWG DIN A0 1:100 2008-Aug-11
OSF 110-KV SUBSTATION

EARTHING SYSTEM
05 ALMA-20.05.04.05-003-A-DWG 20 0100 EV 7900 Q 513 ALMA-20.05.04.05-003-A-DWG DIN A0 1:50 2008-Aug-11
OSF MV SUBSTATION

DETAIL 1 OF STEEL CONSTRUCTION EARTHING


05 ALMA-20.05.04.05-004-A-DWG 20 0100 EV 7900 Q 514 ALMA-20.05.04.05-004-A-DWG DIN A2 2008-Aug-11
OSF MV SUBSTATION

DETAIL 2 OF STEEL CONSTRUCTION EARTHING


05 ALMA-20.05.04.05-005-A-DWG 21 0100 EV 7900 Q 515 ALMA-20.05.04.05-005-A-DWG DIN A2 2008-Aug-11
OSF MV SUBSTATION

EARTHING METHOD OF PANELS INSTALLED ON


05 ALMA-20.05.04.05-006-A-DWG 22 0100 EV 7900 Q 516 ALMA-20.05.04.05-006-A-DWG DIN A2 2008-Aug-11
RAISED FLOORS - OSF MV SUBSTATION

EARTHING PRINCIPLE FOR CABLE TRAYS


05 ALMA-20.05.04.05-007-A-DWG 23 0100 EV 7900 Q 517 ALMA-20.05.04.05-007-A-DWG DIN A2 2008-Aug-11
OSF MV SUBSTATION

DETAIL OF BONDING POINT CONNECTION


05 ALMA-20.05.04.05-008-A-DWG 24 0100 EV 7900 Q 518 ALMA-20.05.04.05-008-A-DWG DIN A2 2008-Aug-11
WITH EARTHING MESH - OSF MV SUBSTATION

EARTHING SYSTEM DETAILS


05 ALMA-20.05.04.05-009-B-DWG 25 0100 EV 7900 Q 519 ALMA-20.05.04.05-009-B-DWG DIN A1 2008-Mar-31 B 2008-Aug-11 DETAIL 3
AOS MV SUBSTATION

LAYOUT
05 ALMA-20.05.05.00-001-A-DWG 20 0100 EV 7100 Q 570 ALMA-20.05.05.00-001-A-DWG DIN A1 1:500 2008-Aug-11
AOS MV SUBSTATION AREA

LAYOUT
05 ALMA-20.05.05.00-010-A-DWG 20 0100 EV 7100 Q 560 ALMA-20.05.05.00-010-A-DWG AOS MV SUBSTATION DIN A1 1:200 2008-Aug-11
TOP VIEW

Annex 1

Page 4 of 8
Projekt No.: 20 0100 Tender Documents (EPC-Contractor)
Department: GE 1, Electrical Engineering ALMA 'European' 23kV POWER SUPPLY PROJECT
Date: August 11, 2008 Atacama Large Millimeter Array

Project Sheet- Format


File name Li-Drawing No. ESO/ALMA Drawing No. Text Scale Datum Index Datum Revision
Phase No. in mm Notes:

AOS MV SUBSTATION CONTAINER


05 ALMA-20.05.05.00-020-B-DWG 20 0100 EV 5200 Q 501 ALMA-20.05.05.00-020-B-DWG DIN A1 1:50 2007-Nov-11 B 2008-Aug-11
INDOOR CONTAINER LAYOUT DELETED

AOS MV SUBSTATION
05 ALMA-20.05.05.00-030-A-DWG 20 0100 EV 5200 Q 520 ALMA-20.05.05.00-030-A-DWG DIN A2 1:50 2008-Aug-11
CONTAINER LAYOUT FLYWHEEL

AOS MV SUBSTATION
05 ALMA-20.05.05.00-031-A-DWG 20 0100 EV 5200 Q 521 ALMA-20.05.05.00-031-A-DWG CONTAINER LAYOUT FLYWHEEL DIN A2 1:50 2008-Aug-11
CHOKE AND TRANSFORMER

AOS SUBSTATION
05 ALMA-20.05.05.01-101-A-DWG 20 0100 BA 5100 Q 550 ALMA-20.05.05.01-101-A-DWG DIN A1 1:200 2008-Aug-11
TOP VIEW

AOS SUBSTATION
05 ALMA-20.05.05.01-102-A-DWG 20 0100 BA 5100 Q 551 ALMA-20.05.05.01-102-A-DWG DIN A1 1:200 2008-Aug-11
FOUNDATION DRAWING

AOS SUBSTATION
05 ALMA-20.05.05.01-103-A-DWG 20 0100 BA 5100 Q 552 ALMA-20.05.05.01-103-A-DWG AOS CONTAINER SLAB FORMWORK AND 1160x594 1:50 2008-Aug-11
REINFORCEMENT DRAWING

AOS SUBSTATION
05 ALMA-20.05.05.01-104-A-DWG 20 0100 BA 5100 Q 553 ALMA-20.05.05.01-104-A-DWG AOS CONTAINER WHITE TANK FORMWORK DIN A0 1:50 2008-Aug-11
DRAWING

AOS SUBSTATION
05 ALMA-20.05.05.01-105-A-DWG 20 0100 BA 5100 Q 554 ALMA-20.05.05.01-105-A-DWG 1029x297 1:50 2008-Aug-11
AOS CONTAINER WHITE TANK WALL VIEW

AOS SUBSTATION
05 ALMA-20.05.05.01-106-A-DWG 20 0100 BA 5100 Q 555 ALMA-20.05.05.01-106-A-DWG AOS CONTAINER WHITE TANK REINFORCEMENT A0++ 1:25; 1:10 2008-Aug-11
DRAWING 1.1

AOS SUBSTATION
05 ALMA-20.05.05.01-107-A-DWG 20 0100 BA 5100 Q 556 ALMA-20.05.05.01-107-A-DWG AOS CONTAINER WHITE TANK REINFORCEMENT A0+ 1:25; 1:10 2008-Aug-11
DRAWING 1.2

AOS SUBSTATION
05 ALMA-20.05.05.01-108-A-DWG 20 0100 BA 5100 Q 557 ALMA-20.05.05.01-108-A-DWG AOS CONTAINER STEEL CONSTRUCTION DIN A1 1:100 2008-Aug-11
PLAN AND SECTION

AOS SUBSTATION
05 ALMA-20.05.05.01-109-A-DWG 20 0100 BA 5100 Q 560 ALMA-20.05.05.01-109-A-DWG TRANSFORMER BUILDING SLAB AND WHITE TANK 834x420 1:50 2008-Aug-11
FORMWORK DRAWING

AOS SUBSTATION
05 ALMA-20.05.05.01-110-A-DWG 20 0100 BA 5100 Q 561 ALMA-20.05.05.01-110-A-DWG TRANSFORMER BUILDING SLAB AND WHITE TANK DIN A1 1:50 1:20 2008-Aug-11
REINFORCEMENT DRAWING

AOS SUBSTATION
05 ALMA-20.05.05.01-111-A-DWG 20 0100 BA 5100 Q 562 ALMA-20.05.05.01-111-A-DWG TRANSFORMER BUILDING STEEL CONSTRUCTION DIN A0 1:25 2008-Aug-11
PLAN AND SECTION

Annex 1

Page 5 of 8
Projekt No.: 20 0100 Tender Documents (EPC-Contractor)
Department: GE 1, Electrical Engineering ALMA 'European' 23kV POWER SUPPLY PROJECT
Date: August 11, 2008 Atacama Large Millimeter Array

Project Sheet- Format


File name Li-Drawing No. ESO/ALMA Drawing No. Text Scale Datum Index Datum Revision
Phase No. in mm Notes:

AOS SUBSTATION
05 ALMA-20.05.05.01-112-A-DWG 20 0100 BA 5100 Q 570 ALMA-20.05.05.01-112-A-DWG FOUNDATION FLYWHEEL CONTAINER A FORMWORK DIN A1 1:50 2008-Aug-11
DRAWING

AOS SUBSTATION
05 ALMA-20.05.05.01-113-A-DWG 20 0100 BA 5100 Q 571 ALMA-20.05.05.01-113-A-DWG FOUNDATION FLYWHEEL CONTAINER A DIN A1 1:50 2008-Aug-11
REINFORCEMENT DRAWING

AOS SUBSTATION
05 ALMA-20.05.05.01-114-A-DWG 20 0100 BA 5100 Q 572 ALMA-20.05.05.01-114-A-DWG FOUNDATION FLYWHEEL CONTAINER B DIN A1 1:50 2008-Aug-11
FORMWORK DRAWING

AOS SUBSTATION
05 ALMA-20.05.05.01-115-A-DWG 20 0100 BA 5100 Q 573 ALMA-20.05.05.01-115-A-DWG FOUNDATION FLYWHEEL CONTAINER B DIN A1 1:50 2008-Aug-11
REINFORCEMENT DRAWING

EARTHING SYSTEM DETAILS


05 ALMA-20.05.05.01-116-B-DWG 20 0100 BA 5100 Q 580 ALMA-20.05.05.01-116-B-DWG DIN A1 2008-Mar-31 B 2008-Aug-11 DETAIL 3
AOS MV SUBSTATION

SINGLE LINE DIAGRAM


05 ALMA-20.05.05.02-004-B-DWG 20 0100 EV 7100 R 522 ALMA-20.05.05.02-004-B-DWG AOS-MV-SS AUX. POWER SUPPLY DIN A2 2007-Nov-11 B 2008-Aug-11 REVISION
400V AC AND 220V DC SWITCHGEAR

CABLE ROUTING
05 ALMA-20.05.05.02-050-B-DWG 20 0100 EV 7100 Q 575 ALMA-20.05.05.02-050-B-DWG DIN A1 1:500 2007-Nov-11 B 2008-Aug-11 UGCL OPTION
AOS MV SUBSTATION AREA

CABLE ROUTING
05 ALMA-20.05.05.02-051-B-DWG 20 0100 EV 7100 Q 576 ALMA-20.05.05.02-051-B-DWG DIN A0 1:100 2007-Nov-11 B 2008-Aug-11 UGCL OPTION
AOS MV SUBSTATION

CABLE ROUTE SECTIONS


05 ALMA-20.05.05.02-052-B-DWG 20 0100 EV 7100 Q 579 ALMA-20.05.05.02-052-B-DWG DIN A1 1:10 2007-Nov-11 B 2008-Aug-11 UGCL OPTION
AOS MV SUBSTATION

05 ALMA-20.05.05.04-001-A-DWG 20 0100 EV 4300 P 501 ALMA-20.05.05.04-001-A-DWG AOS MV SS FIRE PROTECTION INSTALLATION DIN A1 1:100 2008-Aug-11

FIRE PROTECTION INSATLLATION


05 ALMA-20.05.05.04-002-A-DWG 20 0100 EV 4300 P 502 ALMA-20.05.05.04-002-A-DWG DIN A2 1:50 2008-Aug-11
AOS - AUX.TRANSFORMER BUILDING

AOS MV SS FIRE ALARM SYSTEM


05 ALMA-20.05.05.04-003-A-DWG 20 0100 EV 4300 R 505 ALMA-20.05.05.04-003-A-DWG DIN A2 2008-Aug-11
RISER DIAGEAM

EARTHING SYSTEM
05 ALMA-20.05.05.05-001-A-DWG 20 0100 EV 7900 Q 501 ALMA-20.05.05.05-001-A-DWG DIN A1 1:500 2008-Aug-11
AOS MV SUBSTATION AREA

EARTHING SYSTEM
05 ALMA-20.05.05.05-002-A-DWG 20 0100 EV 7900 Q 502 ALMA-20.05.05.05-002-A-DWG DIN A0 1:100 2008-Aug-11
AOS MV SUBSTATION

Annex 1

Page 6 of 8
Projekt No.: 20 0100 Tender Documents (EPC-Contractor)
Department: GE 1, Electrical Engineering ALMA 'European' 23kV POWER SUPPLY PROJECT
Date: August 11, 2008 Atacama Large Millimeter Array

Project Sheet- Format


File name Li-Drawing No. ESO/ALMA Drawing No. Text Scale Datum Index Datum Revision
Phase No. in mm Notes:

DETAIL 1 OF STEEL CONSTRUCTION EARTHING


05 ALMA-20.05.05.05-003-A-DWG 20 0100 EV 7900 Q 503 ALMA-20.05.05.05-003-A-DWG DIN A2 2008-Aug-11
AOS MV SUBSTATION

DETAIL 2 OF STEEL CONSTRUCTION EARTHING


05 ALMA-20.05.05.05-004-A-DWG 21 0100 EV 7900 Q 504 ALMA-20.05.05.05-004-A-DWG DIN A2 2008-Aug-11
AOS MV SUBSTATION

EARTHING METHOD OF PANELS INSTALLED ON


05 ALMA-20.05.05.05-005-A-DWG 22 0100 EV 7900 Q 505 ALMA-20.05.05.05-005-A-DWG DIN A2 2008-Aug-11
RAISED FLOORS - AOS MV SUBSTATION

EARTHING PRINCIPLE FOR CABLE TRAYS


05 ALMA-20.05.05.05-006-A-DWG 23 0100 EV 7900 Q 506 ALMA-20.05.05.05-006-A-DWG DIN A2 2008-Aug-11
AOS MV SUBSTATION

DETAIL OF BONDING POINT CONNECTION


05 ALMA-20.05.05.05-007-A-DWG 24 0100 EV 7900 Q 507 ALMA-20.05.05.05-007-A-DWG DIN A2 2008-Aug-11
WITH EARTHING MESH - AOS MV SUBSTATION

EARTHING SYSTEM DETAILS


05 ALMA-20.05.05.05-008-B-DWG 25 0100 EV 7900 Q 508 ALMA-20.05.05.05-008-B-DWG DIN A1 2008-Mar-31 B 2008-Aug-11 DETAIL 3
AOS MV SUBSTATION

INDICATION OF
LAYOUT
ENVIRONMENTALL
05 ALMA-20.05.06.00-001-B-DWG 20 0100 EV 7100 Q 591 ALMA-20.05.06.00-001-B-DWG 23kV OVERHEAD LINE OSF-AOS 1189x594 1:10000 2007-Nov-11 B 2008-Aug-11
Y SENSTIVE
PART 1
AREAS

INDICATION OF
LAYOUT
ENVIRONMENTALL
05 ALMA-20.05.06.00-002-B-DWG 20 0100 EV 7100 Q 592 ALMA-20.05.06.00-002-B-DWG 23kV OVERHEAD LINE OSF-AOS 1189x594 1:10000 2008-Jan-22 B 2008-Aug-11
Y SENSTIVE
PART 2
AREAS

INDICATION OF
LAYOUT
ENVIRONMENTALL
05 ALMA-20.05.06.00-003-B-DWG 20 0100 EV 7100 Q 593 ALMA-20.05.06.00-003-B-DWG 23kV OVERHEAD LINE OSF-AOS 1189x594 1:10000 2008-Jan-22 B 2008-Aug-11
Y SENSTIVE
PART 3
AREAS

INDICATION OF
LAYOUT
ENVIRONMENTALL
05 ALMA-20.05.06.00-004-B-DWG 20 0100 EV 7100 Q 594 ALMA-20.05.06.00-004-B-DWG 23kV OVERHEAD LINE OSF-AOS DIN A0 1:5000 2007-Nov-11 B 2008-Aug-11
Y SENSTIVE
PART 3 - DEATAIL 1
AREAS

INDICATION OF
LAYOUT
ENVIRONMENTALL
05 ALMA-20.05.06.00-005-B-DWG 20 0100 EV 7100 Q 595 ALMA-20.05.06.00-005-B-DWG 23kV OVERHEAD LINE OSF-AOS DIN A0 1:1000 2007-Nov-11 B 2008-Aug-11
Y SENSTIVE
PART 3 - DEATAIL 2
AREAS

PROPOSED TOWER LAYOUT 1


05 ALMA-20.05.06.02-001-A-DWG 20 0100 EV 7100 Q 598 ALMA-20.05.06.02-001-A-DWG DIN A2 1:50 2008-Aug-11
23kV-OVERHEAD LINE

PROPOSED TOWER LAYOUT 2


05 ALMA-20.05.06.02-002-A-DWG 20 0100 EV 7100 Q 599 ALMA-20.05.06.02-002-A-DWG DIN A2 1:50 2008-Aug-11
23kV-OVERHEAD LINE

Annex 1

Page 7 of 8
Projekt No.: 20 0100 Tender Documents (EPC-Contractor)
Department: GE 1, Electrical Engineering ALMA 'European' 23kV POWER SUPPLY PROJECT
Date: August 11, 2008 Atacama Large Millimeter Array

Project Sheet- Format


File name Li-Drawing No. ESO/ALMA Drawing No. Text Scale Datum Index Datum Revision
Phase No. in mm Notes:

LAYOUT
05 ALMA-20.05.06.02-051-A-DWG 20 0100 EV 7100 Q 571 ALMA-20.05.06.02-051-A-DWG 23kV UNDER GROUND CABLE LINE (UGCL) OSF-AOS DIN A2 1:100 2008-Aug-11
PART 1

LAYOUT
05 ALMA-20.05.06.02-052-A-DWG 20 0100 EV 7100 Q 572 ALMA-20.05.06.02-052-A-DWG 23kV UNDER GROUND CABLE LINE (UGCL) OSF-AOS DIN A2 1:100 2008-Aug-11
PART 2

LAYOUT
05 ALMA-20.05.06.02-053-A-DWG 20 0100 EV 7100 Q 573 ALMA-20.05.06.02-053-A-DWG 23kV UNDER GROUND CABLE LINE (UGCL) OSF-AOS DIN A2 1:100 2008-Aug-11
PART 3

LAYOUT
05 ALMA-20.05.06.02-054-A-DWG 20 0100 EV 7100 Q 574 ALMA-20.05.06.02-054-A-DWG 23kV UNDER GROUND CABLE LINE (UGCL) OSF-AOS DIN A2 1:100 2008-Aug-11
PART 3 - DETAIL 1

DETAILS OF 23kV OHL


05 ALMA-20.05.06.05-001-A-DWG 25 0100 EV 7900 Q 540 ALMA-20.05.06.05-001-A-DWG DIN A2 2008-Aug-11
TOWER EARTHING

Annex 1

Page 8 of 8