JAK File No.

: 28-09-17
Rev 0

PT JAYA ABADI KONSTRUKSINDO


SALES & MARKETING DEPARTMENT

PROJECT QUOTATION

Jl Taman Simprug Raya No A2 12a- 12b


Kota Jababeka, Bekasi Jawa Barat
sales@jakonstruksindo.com; Cc to; s.adipura@gmail.com
021 2210 0802

PROJECT: REINSTATE CIKAMPEK PLAN

SITE: MALANG
CUSTOMER: KARYA SELARAS KONSULTAN

SEPTEMBER 28, 2017


Our Refferences: 02/JAK-RAPP/IX/17 Bekasi, 28 Setember 2017

To : Yuli Romadhoni
CV. karya Selaras Konsultan

PROPOSAL: Hangar Steel Structure Supply and Install

Thank you for the opportunity to quote for the above mentioned subject.

Base on description given to PT Jaya Abadi Konstruksindo, Please find our proposal to carry out and
complete the Proposal for 1,633,000,000 IDR, exclusive of VAT 10%, but inclusive PPH contractor
services.

Please accept our bid Proposal, and returning a copy to us with your sign confirmation within thirty (30)
days of the date of this letter.

While PT Jaya Abadi Konstruksindo will hold the Price firm for as long as possible, we may need to
revise it if we have not finalised our agreement within that period. Upon your acceptance, this Proposal
will become the entire final and binding agreement between both party to the exclusion of any other
terms, conditions or agreements.

Alternatively, please do not hesitate to contact us if you would like to discuss any aspect of our Proposal
(including the Price, Scope of Work and Terms and Conditions). We would be pleased to work with
you to reach a mutually acceptable agreement.

We look forward to hearing from you.

Sincerly Yours,
PT. JAYA ABADI KONSTRUKSINDO

Sani Adipura Winata


Director
3D VIEW

2D VIEW

STRUCTURAL MODEL
SECTION 1 : Building Description

A. BUILDING PARAMETERS
1 Structure Type Clear Span Building
2 No of Interior Column -
3 Width Module (m)
4 Roof Slope 7 degree
5 Width (m) 44 Out to Out Steel
6 Length (m) 15 Out to Out Steel
7 Area (Sq.m) 660
8 Exterior Column Base Conditions Pinned
9 Interior Column Base Conditions Pinned
10 Heigth (m) from FFL 8m
11 Bay Spacing 4m
Left 8 Girt : By Pass
End Wall
12 Rigth 8 Girt : By Pass
13 Bracing Type In Exterior Side wall Rod Bracing
14 Between Interior Column NA
15 Type Of Eave NA

NO DESCRIPTION UNIT QTY

1 MAIN FRAMED SUPPLIED KG 32,240.77


- RAFTER
-COLUMN
- BRACING
2 SECONDARY FRAMED SUPPLIED KG 3,832.32
ROOF PURLIN
WALL GIRTH
3 STRUCTURE ACCESORIES SUPPLIED KG 790.17
ANCHOR
BOLT
SECTION 2 : Panel Description
B. SIDING CONDITIONS
Please Refer to Section 2
1 Front Side Wall Fully Opened for Access
2 Rear Side Wall Fully Sheeted
3 Left Side Wall Fully Sheeted
4 Rigth Side Wall Fully Sheeted

A. ROOF PANELS
Profile BlueScope Lysgth Trimdek Optima
Material AZ 150 0.45 TCT
Exterior Skin
Finish Colorbond
Colour Standard Color
Core Thickness NA
Single Skin Core
Density NA
Profile NA
Material NA
Exterior Skin
Finish NA
Colour NA

B. WALL PANELS
Profile BlueScope Lysgth Trimdek Optima
Material AZ 150 0.45 TCT
Exterior Skin
Finish Colorbond
Colour Standard Color
Core Thickness NA
Single Skin Core
Density NA
Profile NA
Material NA
Exterior Skin
Finish NA
Colour NA

ITEM NO. DESCRIPTION UNIT QTY

1 METAL ROOFING (MAIN BUILDING) SUPPLIED (M2) 889.34


2 METAL WALLING SUPPLIED (M2) 1,038.98
3 METAL FASCIA NOT SUPPLIED (M2) 2.00
4 GUTTER & GUTTER STRAP NOT SUPPLIED Ls 0.00
5 FLASHING FOR ROOFING AND WALLING SUPPLIED Ls 0.00
SECTION 3 : Building Accesories

ITEM NO. DESCRIPTION UNIT QTY

1 RAIN DOWNSPOUT NOT SUPPLIED (M') 0.00


8" CLASS D

2 SLIDING DOOR NOT SUPPLIED (UNIT) 0.00


SLIDING DOOR SINGLE SKIN 1.2MM
3 WINDOW
ALUMINIUM WINDOW WITH CLEAR GLASS NOT SUPPLIED (UNIT) 0.00
STEEL LOUVER NOT SUPPLIED (M2) 0.00
WIREMESH NOT SUPPLIED (M2) 0.00

4 INSULATION
ROOFING : BUBBLE 4mm NW NOT SUPPLIED (M2) 0.00
WALLING : BUBBLE 4mm NW NOT SUPPLIED (M2) 0.00

5 TRANSLUCENT PANEL
ROOFING : FIBRELUX Trimdeck 760 1.2mm NOT SUPPLIED (M') 0.00
WALLING : FIBRELUX Trimdeck 760 1.2mm NOT SUPPLIED (M') 0.00

6 DOORS
ROLL UP DOOR NOT SUPPLIED (UNIT) 0.00
FOLDING GATE NOT SUPPLIED (UNIT) 0.00
TOILET DOOR NOT SUPPLIED (UNIT) 0.00

7 MEZZANINE ACCESSORIES
FLOOR DECK : SMARTDEK SD G550 0.75 TCT SUPPLIED (M2) 90.00
CHECKERED PLATE NOT SUPPLIED (M2) 0.00

8 MECHANICAL TURBIN VENTILATOR


V - 90 Stainless Steel NOT SUPPLIED (UNIT) 0.00
SECTION 3 : Design Load

The Building in This Proposal is Designed for the following Loads

A. LOADING PARAMETERS
1 Design Dead Loads 12 kg/sq.m
2 Design Live Loads 20 kg/sq.m
3 Design Wind Loads 40 kg/sq.m
4 Additional Collateral Loads (KN/Sq.m) NA
5 Roof Snow Loads NA
6 Seismic Zone NA
7 Temperature Loads NA
8 Load Combinations SNI

All structural components in buildings included in this proposal are designed in accordance
with the following design codes.

Hot rolled sections and built up sections are designed in accordance with:
Manual of Steel Construction – Allowable Stress Design
American Institute of Steel Construction, Inc. (AISC)
1 East Wacker Drive, Suite 3100, Chicago, Illinois 60601-2001, USA
Phone: (001-312) 670-2400 • Fax: (001-312) 670-5403
Edition used in this project: 2005 (Latest),

Cold formed members are designed in accordance with:


Cold-Formed Steel Design Manual
American Iron and Steel Institute (AISI)
1140 Connecticut Avenue, NW Suite 705, Washington DC 20036, USA
Phone: (001-202) 452-7100 • Fax: (001-202) 463-6573
Edition used in this project: 2002 (Latest),

Welding is applied in accordance with:


Structural Welding Code Steel Manual (AWS D.1.1/D.1M:2004)
American Welding Society (AWS)
550 NW LeJeune Road, Miami, FL 33126, USA
Phone: (001-800) 443-9353 • Fax: (001-305) 443-5647
Edition used in this project: 2004 (Latest)

Metal Building Systems Manual


Metal Building Manufacturers Association, Inc. (MBMA)
1300 Summer Ave., Cleveland, Ohio 44115, USA
Phone: (001-216) 241-7333 • Fax: (001-216) 241-0105
Edition used in this project: 2002 (Latest)
Section 4 : Surface Preparation and Paint Spesification for Primary Steel

Standard offers its in-house paint system applied to Primary structural components. Secondary structural
members such as roof purlins, wall girts, eave purlin, base angles and gable are made out of pregalvanized
steel which is roll formed and press bent.

4.1 Surface Preparation

All primary structural components will be cleaned using mechanical cleaning (brushing the steel surface
with a wire brush) or solvent cleaning (wiping the steel surface with a solvent soaked cloth).
Sand Blasting to remove loose material such as scale, dirt, oxide films, grease etc… it also increases
the roughness and anchor pattern of the steel surface resulting in strong adhesion of the primer to the
stee

4.2 Paint Specifications:

All paint is applied in factory. The following paint system will be used in this project. (DFT = Dry
Film Thickness).

coat Alkyd Primer (Total DFT = 50 microns):

A high quality grey oxide primer based on modified synthetic polyester resin incorporating
Anticorrosive Zinc Phosphate pigment.
ANNEX I

No Structural Component Spesification Strength


1 Built-up Sections ASTM A536 Grade 36 or SS400 or Above Fy = 24.5
2 Hot Rolled Sections Tubes JIS-3466 STKR-490 or ASTM A 500 Grade B or S355JR Fy = 24.5
I-sections ASTM -A572 Grade 36 Fy = 24.5
Channels ASTM -A572 Grade 36 Fy = 24.5
Angles ASTM -A572 Grade 36 Fy = 24.5
Pipes JIS –G-6344-STK500 or Equivalent
3 Cold formed secondary members ASTM A653M SS Grade 340 Class 1: Coating Z275 or Equivalent Fy = 34.5
4 Mezzanine Deck Panels ASTM A653M SS Grade 340 Class 1: Coating Z275 or Equivalent Fy = 24.5
5 Diagonal Bracing " X" Rods ASTM A36 Fy = 24.5
HR Angles ASTM -A572 Grade 36 Fu = 34.5
6 Anchor Bolts (high strength) ASTM A36 or Grade 4.6 Fu = 44.5
7 Primary Connection Bolts HSB DIN933 Grade 8.8
Ft = 31
Secondary Connection Bolts HSB DIN933 Grade 8.8
8 Sag Rods Hot rolled bar per ASTM A 36 or Grade 4.6 Fy = 24.5
Section 5. Supply Price and Alternative Price Options

5.1 Supply & Install Price

Basic Price Breakdown by building

Item
SUMMARY Rate Rupiahs
No.

A Hangar Building
1 SUPPLY STEEL STRUCTURE Rp. 1,273,000,000.00
2 INSTALL STEEL STRUCTURE Rp. 360,000,000.00

TOTAL ROUND Rp. 1,633,000,000.00


VAT 10% Rp. 163,300,000.00

Section 6. Payment Terms & Bank Information

6.1 Payment terms:

• 25% Down payment 14 Day after Nottice to proceed


• 75% Progress Payment 30 Day again invoice

6.2 Delivery Terms

• Delivery to site and Erection by PT Jaya Abadi Konstruksindo


• First Delivery 8-10 Weeks after following, Approve Engineering drawing Or Down Payment Received