PVC INSULATED 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS
GALVANIZED STEEL 5000 5000 470 5000 5000 BRICK UNLESS OTHERWISE MENTIONED.
BARBED WIRE WORK 230 2. ALL RCC WORKS TO BE DONE AS PER IS: 456-2000,IS:13920.
20 3. REINFORCED CONCRETE IS OF GRADE M-20 AND SHOULD CONFIRM TO I.S.
4 STRANDS THK.(TYP.)
EXP.JT. 456-2000.
4. COARSE AGGREGATE FOR CONCRETE SHALL CONSIST OF HARD CRUSHED
GRANITE STONE OF MAXIMUM SIZE 20mm AND SHALL BE PERFECTLY CLEANED
T.O.W : AND WELL GRADED CONFORMING TO IS:383 AND IS : 2386.
5. REINFORCEMENT BARS SHALL BE TOR STEEL (Fe-500D GRADE) CONFORMING
500
TB TB TB TB TB TB
TO IS:1786. REINFORCEMENT SHALL BE CLEAN AND FREE FROM OIL, MILL
SCALE ETC, SHALL BE BENT COLD TO THE SHAPES AND DIMENSIONS
INDICATED AND SHALL BE PLACED EXACTLY AS SHOWN.
6. THE LAP LENGTH OF BARS SHALL NOT BE LESS THAN 60Ø.
7. NOT MORE THAN 50 % OF BARS SHALL BE LAPPED AT SAME LOCATION.
8. THE CLEAR DISTANCE BETWEEN LAP AND ANOTHER PAIR OF LAP BARS SHALL
2135
40
HOLE III) PLINTH BEAM = 40mm , OTHER BEAMS = 25mm.
500
125
12. THE LEVELING COURSE SHALL BE OF CEMENT CONCRETE OF GRACE M10 USING
DOUBLE ARM SUPPORT 40MM MAX. SIZE OF COARSE AGGREGATE OF APPROVED QUALITY.
HOLE DETAIL 13. SBC IS ASSUMED AS 200 kN/sqm AT 2.0m FROM NGL. THE SAME SHALL NEED
125
HOLE DETAIL TO BE ENSURED WITH PLATE LOAD TEST AT THE SITE.
SCALE1:5 DOUBLE ARM SUPPORT
14.SPACER BARS DIAMETER SHOULD BE MAXIMUM OF THE DIAMETER OF THE
600
2135
125
4+4 LAYERS 15. BUILDING IS DESIGNED FOR SEISMIC ZONE V.
BARBED WIRE
16. FROM Avg.NGL TO FGL SHALL NEED TO BE FILLED WITH SOIL AND WELL
60
COMPACTED WITHIN AND OUT SIDE OF THE BUILDING BOUNDARY.
50x50x5 ANGLE
125
T.O.PB
HOT DIPPED GALVANIZED
350
T.O.W :
PB PB PB PB PB PB
200
LD+10 T
Q
LEGEND :
LD+10 T
Q
2000
)
115
mm
75 d
EXP.JT. k3 = 1.0
10
PB PB PB PB PB
2. FOLLOWING ASPECTS OF SNOW LOADS ARE CONSIDERED SNOW INTENSITY
(>
[ 1m DEPTH OF SNOW] = 20lbs/sq.ft = 0.96 kN/m²
900
900
350
500
3-12 T
Q
8T
Q@150 C/C
MIDDLE BARS (MB1)
2350 2350 3-12 T
Q
COLUMN COLUMN 10D (TYP.)
100
Cx PCC
COLUMN NOTES NO:14
R/F IN FOOTING R/F IN FOOTING
AT BOTTOM-B2 AT BOTTOM-B2
DETAILS OF PLINTH BEAM DETAILS OF TIE BEAM
Cy
R/F IN FOOTING R/F IN FOOTING SCALE 1:15 SCALE 1:15
AT BOTTOM-B1 AT BOTTOM-B1 STRP/LINKS
300 mm MIN. 300 mm MIN. ISSUED FOR CONSTRUCTION
Df Ld (TYP.) Df Ld (TYP.) TYP.SECTION A-A OF COLUMN(C1)
SCALE 1:10
B.O.F : B.O.F :
Lx X Ly Lx X Ly
SCHEDULE OF COLUMNS
100MM LEVELING COURSE 100MM LEVELING COURSE
SECTION 1-1 PCC (TYP.)
SECTION 2-2 PCC (TYP.) SR. TYPE SIZE OF COLUMN R/F IN COLUMN
SCALE 1:25 SCALE 1:25 NO. Cx Cy LONGITUDINAL BARS TYP.BARS SHAPES
FOR LINKS
1 1 CORNER BARS MIDDLE BARS STRP/LINKS
2 2 ( DIMENSION ARE
NOS- DIA NOS- DIA CENTER TO CENTER )
420
1 C1 250 500 4-12 T
Q 2-12 T
Q 2-12 T
Q 10 T
Q @75 C/C 10 T
Q @150 C/C 230 230
20 170
R/F IN FOOTING EXP.JT. R/F IN FOOTING
BOTTOM-B2 BOTTOM-B2
Ly Ly
SCHEDULE OF FOOTING
SR. SIZE OF FOOTING R/F IN FOOTING R/F IN FOOTING R/F IN FOOTING R/F IN FOOTING
100(typ) 100(typ) NO. TYPE AT BOTTOM-B1 AT BOTTOM-B2 AT TOP-T1 AT TOP-T2
Lx Ly 'Df'
R/F IN FOOTING R/F IN FOOTING
350
350
350
350
350
Lx Lx
350
350