1. Project Description

2. Outdoor design Condition

3. Design Consideration for equipment rooms

4. Indoor design condition defined by client

5. Reference Standards

6. Design proposal Options

7. Conventional system design proposal

8. Total load summery.

9. Chiller plant system description

10. UPS Room air conditioning

11. Battery Room air conditioning

12. Ventilation
13. Electrical Load

14. System design excellence

1. Project Description
M/s. Wipro Developer is proposed to construct a Data Centre in Kodathi Campus at Bangalore.

The various spaces in the building as listed below have to be Air-conditioned / Ventilated.

M/s. Wipro Kodathi Data centre building consists of Ground, first, second & Terrace floor.

Sl.No. Description

Floors to be air-conditioned First floor & Second Floor.


1

First floor Master Server room(MSR) + Master communication


Areas to be air-conditioned
2 room(MCR) area & Second floor MSR+MCR

Area to be ventilated Electrical rooms, Plant Room etc.


3

2. Outdoor design conditions

2.1 Site Location : Bangalore


2.2 Geographic location : 12 degree 8' N
2.3 Altitude : 921 M above mean sea level.
2.4 WBT°C & HOURLY Table for Bangalore

3. Design Consideration for Equipment Rooms:(Inputs received from Client)

SI FLOOR MSR MSR MCR MCR TOTAL LOAD


NO DESCRIPTION AREA(SQ.FT) LOAD(KW) AREA(SQ.FT) LOAD(KW) (KW)

1 FIRST FLOOR 6000 1344 4000 426 1770

2 SECOND FLOOR 8000 2100 2000 359 2459

GRAND TOTAL (KW) 4229

Racks Details:

 At first floor MSR 40 racks of 10 KVA each & 160 racks of 8 KVA each

 At first floor MCR 133 racks of 4 KVA each

 At Second floor MSR 53 Racks of 13.5 KW & 213 racks of 6.5 KW

 At second floor MCR 13 Racks of 10 KVA & 53 Racks of 6 KVA

 MSR & MCR racks will be operated as below

MSR Racks:
A. Present phase: 80Racks of 8 KVA and 20 Racks of 10 KVA.
B. Future phase: 80Racks of 8 KVA and 20 Racks of 10 KVA.

MCR Racks:

A. Present phase: 66Racks of 4 KVA.


B. Future phase: 66Racks of 4 KVA.

Note: No lighting considered since only the lighting will be switched on wherever required for maintenance.

4. Indoor Design Condition as defined by client:

1. Supply air to be at 22 +/- 1 deg C


2. Return air at 30 Deg. C & RH 50 +/- 5 %
3. 100% recirculation with special chemical filters shall be suitable to deliver continuous downstream
concentration equal to air output of G1 class with no fresh air make up
4. Filter machine to be in the PAC rack for individual MSR/MCR rooms to maintain better IAQ.
5. Minimum fresh air to be provided as per Ashrae standards

5. Reference Standards:
Following standard & guidelines shall be adopted while designing the HVAC system.

5.1.1 National Building Code of India (NBC) 2005


5.1.3 ASHRAE Hand Books.
Fundamentals 2009
HVAC Systems and Equipment 2008
HVAC Applications 2007
Refrigeration 2006
5.1.4 Duct construction standards as per relevant BIS Codes & SMACNA standards
5.1.5 Air filters as per ASHRAE 52.1-1992 and 52.2-2007

6. Design Proposal Options Analyzed

1. Conventional system
2. Air to air Heat Exchanger with PAC machines
3. IEC proposal with PAC machines. (Eliminated from detailing since client does not want to
use water spray on the secondary side of the PHE)
After done the analysis between conventional system and heat exchanger we could
save only Rs.3.5 Million/year whereas our capital investment cost is RS 274.5 million.
Comparing with capital investment our cost savings/year is not valuable. So we have
concluded with client acceptance to go with conventional system with PAC
machines.

7. Conventional system – Design Proposal.

1. Cold isle containment system to be followed.

2. Supply air to be at 22 +/- 1 deg C

3. 750mm raised insulated floor to be used as a supply plenum and the plenum to be maintained at 6 Pascal positive

pressure

4. Floor tiles both active and passive will be used to supply the air from the plenum in to the contained cold isle

5. Cold Isle to be maintained at a positive pressure of 6 Pascal using variable speed fans in the AHUs and fan aided tiles

6. Hot air collected from the higher level is passed through special filters to reduce degassing and avoid gaseous

contaminants

7. This hot air is passed through the hot aisle plenum and re circulating the return air to PAC units through return air

plenum.

8. Necessary fire dampers will be provided.

9. Each floor rack area consists of 2 nos MSR and 2 nos MCR with partitions on the above floor level .However false

floor is common for both the rooms.

10. Bothe the floors racks rooms will be considered as two wing ,half of the wing will be handled by one set of machines

with N+1 redundancy+4 filter machines and another half of the wing will be handled by another set of machines with

N+1 redundancy+4 filter machines.

11. Bothe the wings false floor shall be segregated by fire tight partition.
8. Total Load summery:

A. Total Equipment load Summery = 4229 KW

By considering 100% heat dissipation total heat load =1205 TR

B. Total Rack room Sensible load = 15 TR

C. Total room UPS+Battery room load =61 TR

D. Total comfort Air-conditioning Load = 14 TR

Total Data Centre Air conditioning load = 1205+15+61+14 = 1295 TR

9. Chiller Plant System Description


Chilled water Central plant design consists of Hybrid combination of Primary Variable Chillers, pumping system,
Hydronic Pressure is maintained in the equipment through pressure regulating cum balancing valve provided in
every PAC. VFD provided for the Primary Pumps and condenser pumps.
VFD using as starting device to achieve maximum flow without trimming the impeller. Hence condenser pumps
shall be constant flow.
Chiller Plant configuration:

 Water Cooled Chillers :-

 Capacity :-650 TR
 Qty :-2 Nos. (2 Working)
 Type :- Variable Primary with Centrifugal Compressor Chillers.
 Chw. In/Out : 16 / 22°C.
 Flow Rate : 2.2gpm/TR.

 Air Cooled Chillers :-

 Capacity :- 650TR
 Qty :- 1 Nos. ( Standby )
 Type :- Variable Primary with Screw Compressor Chillers.
 Chw. In/Out :- 16/22°C.
 Flow Rate :- 2.22gpm/TR.

 Chiller Plant room is Located at the ground floor level of Data Centre building.
 All water cooled chilles shall be located at ground floor plant room.
 Air cooled chiller shall be placed on terrace level.
 All the Pumps are on a common header which will be located inside the Water cooled chiller plant room.
 Apart from the above equipments, Chilled water system consists of Air separator, Side stream filter,
Electromagnetic descaler and Compression tank etc.,
 Refrigerant used is R134a which is environmentally friendly.

A.Water Cooled Chiller Package:

 Centrifugal Compressor with quick restart @ set point feature.


 Primary Variable flow and constant condenser flow.
 Non CFC Refrigerant.
 Elevated water temperature, thereby Savings in energy consumption.
 Inbuilt Microprocessor control
 The panel shall incorporate main disconnect switches & fuses for individual motors, contactors, over
load relays, single phase preventers, under/ over Voltage trip, on/off push buttons, auto manual
switches for remote starting stopping of Chiller packages.
 Less than 0.45kW/TR @ 16/22°C.

B.Air cooled chiller Package:


 Screw Compressor.
 Primary Variable flow.
 Non CFC Refrigerant.
 IP-55 grade Protection including electrical panel.
 Elevated water temperature, thereby Savings in energy consumption.
 Inbuilt Microprocessor control
 The panel shall incorporate main disconnect switches & fuses for individual motors, contactors, over
load relays, single phase preventers, under/ over Voltage trip, on/off push buttons, auto manual
switches for remote starting stopping of Chiller packages.
 Less than 1.2kW/TR.

C.Cooling Tower
 CTI Approved Cooling Tower
 High efficiency Cooling Tower ( Approach Temperature 2Deg C )

D.Centrifugal Pumps:
 Centrifugal Inline type pumps.
 Motors ( EE1 ) shall be energy efficient, TEFC type
 Provided with mechanical seal.
 Untrimmed Impeller.
 4 pole Motor.

D.1 Primary Chilled Water Pumps

 chiller Evaporators are provided with common primary chilled water pump station

 Variable flow type activated through Variable Frequency Drive (VFD) based on the load fluctuation.

 Primary chilled water pumps suction line is provided with an isolation valve, Y-Strainer, and pressure
Gauge. Discharge line is provided with isolation valve, Non-Return valve, and pressure gauge.

 No electrical Starter used. VFD used as a starter.

 N+1 Redundancy

D.2 Condenser Water Pumps

 Chillers condenser are provided with common Condenser water pump station

 Each condenser pump is provided with VFD only for balancing while commissioning.

 VFD using as starting device to achieve maximum flow without trimming the impeller. Hence condenser
pumps shall be constant flow.

 Primary Condenser water pumps suction line is provided with an isolation valve, Y-Strainer, and pressure
Gauge. Discharge line is provided with isolation valve, Non-Return valve, and pressure gauge.

 No electrical Starter used. VFD used as a starter.

 N+1 Redundancy

10.UPS Room Air-conditioning:

10.1 UPS inside condition:


1. Supply air to be at 18 deg
2. Return air at 32 Deg. C
3. Air distribution 100% recirculation During on coil mode
4. Air distribution 100% once through during free cooling (When the outside temperature is less than 18Deg C).

10.2 UPS Load:

 UPS Room 1 Load = 5000KVA


 UPS Room 2 Load =5000KVA

10.3 UPS Room cooling load:

 UPS Room1 Load =27TR (5% heat emission considered from 45% of UPS load as per client inputs=5000x0.45x0.05)
 UPS Room 2 Load =27 TR(5% heat emission considered from 45% of UPS load as per client inputs =5000x0.45x0.05)

10.4Working principle:

 AHU shall be with stand by.


 Supply air will be fed by supply air duct with required fire dampers.
 100% air shall be re circulated when ambient air is more than 20Deg C.
 100% air shall be once through during free cooling when ambient air is less than 20Deg C.
 Exhaust fan shall be located inside AHU room.
 Return/Exhaust air shall be taken by return air duct with required fire dampers.

10.5 UPS Room Schematic Layout:


11.Battery Room Air-conditioning:

11.1Battery Room inside condition:

1. Supply air to be at 18 deg C an85% RH


2. Return air at 23 Deg. C & 50%
3. Chilled water coil selection criteria for water in/out 16 / 22 deg C

11.2Working principle:

 AHU shall be with stand by.


 Supply air will be fed by supply air duct with required fire dampers.
 Exhaust air shall be exhausted from the battery room 1cfm/sq.ft as per NFPA standard
continuously.
 Exhaust fan shall be located inside the battery room ceiling.
 Return air shall be taken by return air duct with required fire dampers.
 Fresh air will be drawn from service corridor as equal to exhausted CFM.

11.2 battery Room schematic:

12.Ventilation:

A.TOILETS:

 All the toilet exhaust shall be through propeller fan which is kept on the toilet wall at each individual
toilet.
 Fresh air to toilets will be drawn from through Door louvers
 Exhaust air for Toilet shall be at 60cfm per fixtures.
B.ELECTRICAL ROOM:
 Electrical room at all the floors shall be provided with exhaust system.
 Exhaust duct from each Electrical room will be connected to individual exhaust fan.
 Each electrical room will be provided with inline exhaust fan.
 Main Electrical rooms @ Ground Panel Heat dissipation shall be considered 0.5% from the total load
for sensible cooling.
 Air quantity calculated considering Delta t 9Deg F from ambient.
 Fresh air will be fed by fresh air fan by considering 120% of exhaust cfm to maintain positive pressure
in electrical room.
 Exhaust & Fresh air supply shall be achieved by duct system.
 Floor electrical room ventilation shall be done by propeller fans.
 Fresh air will be drawn by door louvers by considering 15ACPH.

C.PLANT ROOM:
 Plant Room ventilation shall be done by propeller fan.
 Fresh air louvers shall be provided in plant room wall/Door
 Exhaust air for plant room considered 15ACPH.

D.FIRE SUPRESSION EXHAUST FAN:


 @UPS room, battery room and rack area Exhaust fan designs based on area of the room.
 Fan selection will be 1cfm/sq.ft.
 If the fire suppression is on, these exhaust fans will help to remove the fire suppression gas smoke
from respective rooms.

13.Electrical load:

Please Click the Below Link for Load Calculation

Load Calculation
14.System design excellence:
Chilled water system design excellence is achieved by selecting the following:
1) Elevated Higher water temperature chiller
2) High COP Chillers shall be selected.
3) Primary variable chiller.
4) Lower water temperature chiller capacity is minimized as low as possible.
5) Non-CFC refrigerant shall be used.
6) R134a refrigerant shall be used which is environmental friendly.
7) All motors including pumps, AHU’s and Exhaust fans shall be EFF1.