01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
01 02 03 04 05 06
19
07 08 09 10 11 12 13 14 15 16 17 18 19
Engineer
G+1
OLD BUILDING
UG WATER TANK
POLYMER TANKS
TANK 6
TANK 3
300cfm Return Polymer
FABRICATION YARD compressor tank
2.5m*2.5m 6m*3m*2.5m
BORE
WELL
0.6m
Polymer mixing
6m*3m*2.5m
TANK 4
tank
TANK 1
TANK 2
LABOUR'S
REST ROOM
FOOTP
Delivery Room
TICKET BOOKING OFFICE
RAILWAY GOODS
01 02 03 04 05 06 07 08 09
BUILDING-2 10 11 12 13 14 15 16 17 18 19
51.01M
51.075M
GUIDE WALL
51.145M DIAPHRAGM WALL
51.21M
51.23M
+46.019M
BOTTOM OF ROOF SLAB
+46.019M
BOTTOM OF ROOF SLAB
+40.769M
CONCOURSE SLAB TOP
+40.769M
CONCOURSE SLAB TOP
+32..919M
BASE SLAB TOP LEVEL
+32.919M
BASE SLAB TOP LEVEL
D-WALL TOE
D-WALL TOE
PHYSICAL PROGRESS
LEGEND:
DESCRIPTION UOM TOTAL CUMULATIVE
SCOPE ACHIEVED
01 Barrettes Nos 33 12
Diaphragm NOS
02 86 81
Wall
Concreting
04 SQM 4448 516
(Roof Slab)