2.00 mtr.

HIGH BOUNDARY WALL DESIGN


Description Notation Calculation

TYPICAL WALL PANEL

Height of wall from top of footing h 2000 50


Thickness of wall t
Length of panel L 5000
Height to Length ratio h/L 2050 5000

Moment of inertia (UNIT WIDTH)about


xx axis Ixx 1000 8000000 12
Moment of inertia of WALL Panel about
xx axis Ixx-WALL BD3 /12 5000 8000000
12
Area of cross section Axx 5000 200
Radius of Zyration about xx Rxx root I / a 3333333333 3333
1000000
Effactive length factor kh
Slenderness ratio L/Rxx * hk 2050 0.75 26.63 <
57.74
Limiting Panel area clause 36.3.a.1 1500x tef2 1500 200 200
Panel area Height x length Area 5000 2000
Strength Design : Bending Moment :Plane of failure Perpendicular to the bed joints
Orthogonal ratio : Table 3 Mu 0.15 0.25
Ch. Wind Load Wk
Partial Safety factor Gama f for h/L =.5 for h/L =.3 Design value
Bending moment coeff. From table 9 Alfa 0.021 0.013 0.0174
Design Bending Moment : plane of
failure Perpendicular to the bed joints Alfa Wk Gama f L2

Putting the values 0.0174 1.25 1.4 25


Design Moment of Resistance Plane of failure Perpendicular to the bed joints
Moment of Resistance : plane of failure
Perpendicular to the bed joints fkx Z
0.25 13666667
Partial safety factor for material Ym 3.5
Section Modulus Zyy 2050 40000 82000000
6 6
Check for Failure 0.76 < DESIGN IS SAFE
0.98
Strength Design : Bending Moment :Plane of failure Parallel to the bed joints
for h/L =.5 for h/L =.3 Design value
Bending moment coeff. From table 9 Alfa 0.015 0.008 0.01185
Design Bending Moment : plane of
failure Parallel to the bed joints Alfa Wk Gama f L2 Mu

Putting the values 0.01185 1.25 1.4 25 0.6

Moment of Resistance :Parallel to joint


failure
fkx Z 0.15 6666666.67
Partial safety factor for material Ym 2.8

Section Modulus per Mtr Width Zxx 1000 40000 40000000


6 6
Design moment of resistance
Design vertical load per unit length 200 1000 22 2
Gama m 3

Supporting Column Footing Design : Stablity check / Bearing Capacity


Concrete and steel grade Fck 25 Fy 460
Assume size of column B 300 W 300 L
Assume depth of Footing from FGL CD
Assume Size of Column Footing L 1000 B 1600 T
Thickness and density of soil cover Tsoil 1250 Gama s 17
Wind load of wall on column Udlw 2000 5300 1.25
Passive soil pressure resistance Pas 300 0.3 1250 18
Passive soil bending moment 4.22 375
Bending moment at the base transverse
to wall Muxx wL2 /2 13.25 4 / 2
Total Vertical load of wall panel PWl 2000 5000 200 20
Total Vertical load of Plinth beam Pbw 200 5000 400 25
Total Vertical load of the column Pcol 300 300 3000 25
Total Vertical load of the column footing
Pftg 1000 1600 250
25
Total Vertical load of Soil cover over
footing Swt 1000 1600 1250 18

Less Column under FGL Cws -300 300 1250 25


Total vertical load on column P
Eccentricity on the column footing M/P 13.25 x 1.2 / 99.94
Check for Eccentricity 0.16 0.17 Eccentricity is within limits
Maximum bearing pressure on soil P/A 1+6E 62.4609375 1 0.95
B 1.6
Minimum bearing pressure on soil P/A 1-6E 62.4609375 1 0.95
B 1.6
Plinth Beam Design :
Size of Plinth Beam W 200 D 400 d
UDL on the beam UDL 1.76 8
Maximum Bending Moment on Mid
span
Bmmax wl2 /8 9.76 5.3 5.3
10
cover 40 Main R/F Dia 16
Moment of resistance of the section MR
Reinforcement steel Ast 50 25 0.000335692

Provide Reinforcement 295 401.92 OK 2


value Unit Reference

2050 mm
200 mm
5000 mm Clause 28.3.2 : BS: 5628
0.41

666666667
mm4
3333333333
mm4

1000000 mm2
57.74 mm

0.75 Clause 28.3.1.1(a): BS: 5628


27 OK Clause 28.1: BS: 5628

60000000
10000000 THE RATIO IS OK
to the bed joints
0.6 Using Mortar type 3, wall thickness 250
1.25 kN /m2
1.4 Clause 22(b); BS:5628
For Mu = 1.00 , h/L = 0.41 Table-9, Panel D : BS:5628

0.76 kNm Perpendicular to the bed joints

0.98 kNm Perpendicular to the bed joints


Table 4: for Normal manufacture /Const. control

13666667 mm3

DESIGN IS SAFE
he bed joints

For Mu = 0.6 , h/L = 0.41 Table-9, Panel H : BS:5628

Table-9, Panel D : BS:5628

0.31 kNm Condition H, for Mu= 0.6

0.36

6666667 mm3

8.8 N/mm2

g Capacity

3000 mm
1500 mm
250 mm

13.25 kN/m
4.22
1.58

26.50
kNm
40.00 kN
10.00 kN
6.75 kN
10.00
kN
36.00 kN

-2.81 kN
99.94 kN
0.16

76.30 kN /m2
1.77 kN /m2
352
9.76 kN/m
38.38
kNm

0.42 %age

T 16
200 TPD CAUSTIC SODA PLANT FOR KLJ ORGANIC ,
PROJECT QATAR
SITE LOCATION QATAR

WORK HEAD 2.00 MTR HIGH B.WALL


DESCRIPTION LOC L B H /T N
EARTHWORK IN EXCAVATION CF1 1.15 1.75 1.6 44.472
EARTHWORK IN EXCAVATION F2 1.15 1.75 1.6 2
EARTHWORK IN EXCAVATION : PLINTH PB 214.50 0.30 0.45 1
BEAM
EARTHWORK IN EXCAVATION : PLINTH PB 8.00 0.30 0.45 1
BEAM
SUB TOTAL
EARTHWORK IN FILLING
DISPOSAL OF SURPLUS EARTH
PCC M15 BELOW FOUNDATIONS

PCC (M15) IN FOUNDATION : CF1 1.150 1.750 0.08 44.472


COLUMN FOOTING
PCC (M15) IN FOUNDATION : F2 1.150 1.750 0.08 2
FOOTING E AND F
BELOW PLINTH BEAM PB 214.500 0.300 0.050 1
BELOW PLINTH BEAM PB 8.000 0.300 0.050 1
SUB TOTAL
RCC C25 BELOW PLINTH

COLUMN FOOTING CF1 1.00 1.600 0.25 44.472


COLUMN FOOTING WALL 2 CF2 1.00 1.60 0.25 2
PLINTH BEAM PB1 214.5 0.200 0.40 1
PLINTH BEAM 2 PB2 8.00 0.200 0.40 1
COLUMN UP TO FGL CBL 0.30 0.30 1.25 44.472
COLUMN UP TO FGL WALL2 0.30 0.30 1.25 2
SUB TOTAL
Reinforcement Bars HYSD 460: (Assumed 80 KG /CUM)
RCC C25 ABOVE PLINTH

COLUMNS ABOVE PLINTH C1 0.30 0.30 2.10 44.472


COLUMNS ABOVE PLINTH C2 0.30 0.30 2.10 2
TOP BAND 1 TB1 214.5 0.200 0.15 1
TOP BAND 2 TB2 8.0 0.200 0.15 1
SUB TOTAL
Reinforcement Bars HYSD 460: (Assumed 120 KG /CUM)
BLOCKWALL 200 THICK
BLOCK WALLS LONG SIDE L1 2.050 214.50 0.20 1
BLOCK WALLS PERP L2 2.050 8.00 0.20 1
DEDUCT FOR COLUMNS ,-VE -0.30 0.30 2.05 46.472
SUB TOTAL
PLASTERING/ WALL TILES/FINISHES

LONG 2.05 214.50 2


15 MM PLASTER ON BOTH SIDE OF WALLS
SHORT 2.05 8.00 2
15 MM PLASTER ON BOTH SIDE OF WALLS

SUB TOTAL
PAINTING WITH EXT. PAINT LW 2.05 214.50 2
PAINTING WITH EXT. PAINT SW 2.05 8.00 2
SUB TOTAL
JOB No 30005
ER MGR

QTY UNIT
143.20 CU M
6.44 CU M

28.96 CU M

1.08 CU M

179.68 CU M
127.71 CU M
51.97 CU M

6.71 CU M

0.30 CU M

3.22 CU M
0.12 CU M
10.35 CU M

17.79 CU M
0.80 CU M
17.16 CU M
0.64 CU M
5.00 CU M
0.23 CU M
41.62 CU M
3.329 MT

8.41 CU M
0.38 CU M
6.44 CU M
0.24 CU M
15.46 CU M
1.855 MT

87.95 CU M
3.28 CU M
-8.57 CU M
82.65 CU M

879.45 SQM

32.80 SQM

912.25 SQM
879.45 SQM
32.80 SQM
912.25 SQM
PROJECT WASTE HEAT RECOVERY POWER PLANT JOB No
SITE LOCATION ZUARI CEMENT , SITAPURAM ER

BUILDING NO. COOLING WATER STATION


DESCRIPTION LOC L B H /T N QTY
EARTHWORK IN EXCAVATION : RAFT R1 19.80 13.40 1.425 1 378.08
EARTHWORK IN EXCAVATION : SUMP R1 14.50 3.4 2.400 1 118.32
EARTHWORK IN EXCAVATION : RAFT R2 14.50 7.6 2.000 1 220.40
BELOW GRADE SLAB R3 4.60 7.70 0.500 1 17.71
SUB TOTAL 734.51
EARTHWORK IN FILLING 0.00
DISPOSAL OF SURPLUS EARTH 734.51
PCC (M15) IN FOUNDATION BELOW RAFT 20.100 13.55 0.10 1 27.24
SUB TOTAL 27.24
RCC M25 BELOW PLINTH

FOUNDATION RAFT of cooling sump R1 19.80 13.40 0.35 1 92.86


RAFT BEAMS-LONG R1 18.10 0.50 0.25 3 6.79
RAFT BEAMS-CROSS R1 12.70 0.50 0.25 3 4.76
FOUNDATION RAFT of Pump Area R2 14.50 7.10 0.35 1 36.03
RAFT BEAMS-CROSS R2 7.10 0.50 0.25 2 1.78
PERIMETER WALLS LONG SIDE NEAR E R2 14.50 2.05 0.30 1 8.92
PERIMETER WALLS SHORT GRID 1 & 4 R2 7.10 2.05 0.30 2 8.73
GRADE SLAB IN DOSING AREA R3 4.60 7.10 0.15 1 4.90
STAIR SLAB NEAR GRID E R4 14.50 1.30 0.15 1 2.83
PUMP PEDESTAL 2.60 1.20 0.50 3 4.68
PUMP PEDESTAL SMALL 1.20 1.20 0.50 1 0.72
STAIR PEDESTAL 1.20 0.50 0.50 2 0.60
EXTRA FOR SUMP 800x800 0.80 1.00 0.30 2 0.48
EXTRA FOR SUMP FOR SUCTION LONG 14.50 1.20 0.35 1 6.09
EXTRA FOR SUMP FOR SUCTION SHORT 2.70 1.20 0.35 1 1.13
SUB TOTAL 181.30
FDN : Reinforcement Bars Fe 415: HYSD bars (Assumed @ 110 KG /CUM) 19.943
WATER PROOFING COMPOUND

WATER PROOFING COMPOUND @ 200 ML / 50 KG CEMENT 253.82


WATER BARS AT RAFT LEVEL 18.90 12.50 1 62.80
WATER BARS AT SUMP LEVEL 14.30 4.00 1 36.60
RCC M25 ABOVE PLINTH

COLUMNS IN COOLING SUMP R1 0.50 0.50 4.80 15 18.00


COOLING SUMP WALL NR GRID D AND A R1 18.90 4.80 0.35 2 63.50
COOLING SUMP WALL AT GRID 1 AND 5 R1 12.70 4.80 0.35 2 42.67
COLUMNS AT GRID E R1 0.50 0.50 4.00 5 5.00
COOLING AREA BEAMS-LONG R1 18.10 0.30 0.50 3 8.15
COOLING AREA BEAMS-CROSS R1 12.70 0.30 0.50 3 5.72
PUMP AREA BEAMS-LONG R1 18.10 0.30 0.50 1 2.72
PUMP AREA BEAMS-CROSS R1 7.10 0.30 0.70 5 7.46
ROOF SLAB OVER PUMP ROOM R2,R3 18.90 8.10 0.15 1 22.96
Stair Start platform 1.20 1.20 0.20 1 0.29
SUB TOTAL 153.21
FDN : Reinforcement Bars Fe 415: HYSD bars (Assumed @ 85 KG /CUM) 13.023
STRUCTURAL STEEL
MONORAIL ISMB 300 18.40 44.20 1 0.81
Extra for connection and insert Plates @ 10 % 0.08
Steel Stair near grid 5
STRINGER BEAMS ISMC 200 22.00 22.10 2 0.97
SUPPORT ANGLE IN STEPS ISA 50X50x6 0.52 4.50 64 0.15
Grating in Steps @ 45 kg / SQM 0.30 0.75 45 61 0.62
Grating in LANDING @ 45 kg / SQM 0.75 0.75 45 3 0.08
CROSS BEAMS IN LANDING ISMC 200 0.75 22.10 6 0.10
Hand rail 40 NB "M" OVER STAIR T1,T2 22.00 3.61 4 0.32
Hand rail 40 NB "M" AROUND PLATFORM T1,T2 18.20 3.61 2 0.13
NEAR PUMPS
Toe Plate 150 Wide, 6 thick 22.00 0.15 47 2 0.31
Toe Plate 150 Wide, 6 thick 18.20 0.15 47 1 0.13
INSERT ANGLE AT SLAB EDGE ISA 75X6 18.20 6.8 1 0.12
TOTAL OF ABOVE 3.57

ADD EXTRA @ 5% FOR CONNECTIONS 0.18


SUB TOTAL 3.75
PRIMER+PAINTING 2 COATS 3.75
SUB TOTAL 3.75
BRICKWORK IN MAIN WALLS
BRICK WALLS AT GRID 1 AND 5 PUMP HOUSE 7.10 3.60 0.23 2 11.76
AREA
PLASTERING/ WALL TILES/FINISHES
15 MM PLASTER ON ROUGH SIDE OF LONG 7.10 3.60 4 102.24
WALLS
SUB TOTAL 102.24
20097
MGR

UNIT
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M

CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
MT

Ltrs
RM
RM

CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
CU M
MT

MT
MT

MT
MT
MT
MT
MT
MT

MT

MT
MT
MT
MT

MT
MT
MT
MT

CU M

SQM

MT
PROJECT WASTE HEAT RECOVERY POWER PLANT
SITE LOCATION ZUARI CEMENT , SITAPURAM

BUILDING NO. MAIN BUILDING


DESCRIPTION LOC L B H /T
EARTHWORK IN EXCAVATION IN FOUNDATION
FOOTING F1 F1 3.50 3.00 3.6
FOOTING F2 F2 5.00 3.50 3.6
FOOTING F3 F3 4.00 4.00 3.6
FOOTING F4 F4 4.50 4.00 3.6
FOOTING F5 F5 2.00 2.00 3.6
FOOTING F6 F6 3.50 3.50 3.6
FOOTING F7 F7 2.50 3.50 3.6
PLINTH BEAMS LONG LONG 26.00 0.40 0.7
PLINTH BEAMS SHORT SHORT 22.00 0.40 0.7
EQUIPMENTS EQ 26.00 22.00 0.20
SUB TOTAL
EARTHWORK IN FILLING

DISPOSAL OF SURPLUS EARTH

PCC M15 BELOW FOUNDATIONS

PCC (M15) IN FOUNDATION : F1 4.150 4.150 0.08


FOOTING ON GRID A
PCC (M15) IN FOUNDATION : F2 2.150 2.150 0.08
FOOTING E AND F
COLUMNS B/W GRID C & B /2-4 F3 0.750 0.750 0.08
BELOW GRADE SLAB 22.000 26.000 0.05

PLINTH BEAM GRID A & E PB1 22.00 0.350 0.08

PLINTH BEAM GRID 1 & 5 PB5 26.00 0.350 0.08


SUB TOTAL
RCC M25 BELOW PLINTH ( COLUMN FULL LENGTH INCLUDED)

FOUNDATION OF COLUMNS AT GRID A F1 3.50 3.000 0.60


COLUMNS AT GRID A C1 0.6 0.600 15.66
FOUNDATION OF COLUMNS AT GRID B & E F2 5.00 3.500 1.20
COLUMNS AT GRID B & E C2 0.6 1.000 16.61
COLUMN FOOTING AT GRID C & D /1 F3 4.00 4.00 0.70
COLUMNS AT GRID C & D /1 C3 0.6 0.600 21.00
COLUMN FOOTING AT GRID C & D /5 F4 4.50 4.00 0.70
COLUMNS AT GRID C & D /5 C4 0.8 0.600 21.00
COLUMN FOOTING B/W GRID C & B /2-4 F5 2.00 2.00 0.50
COLUMNS B/W GRID C & B /2-4 C5 0.60 0.60 10.00
COLUMN FOOTING B/W GRID C & D /2-4 F6 3.50 3.50 0.80
COLUMNS B/W GRID C & D /2-4 C6 0.80 0.80 10.00
COLUMN FOOTING B/W GRID C & D /4-5 F7 2.50 3.50 0.70
COLUMNS B/W GRID C & D /4-5 C7 0.50 0.80 10.00
PLINTH BEAM GRID A & E PB1 22.00 0.25 0.50
PLINTH BEAM GRID B PB2 22.00 0.40 0.60
PLINTH BEAM B/W GRID C-B PB3 11.00 0.25 0.50
PLINTH BEAM B/W GRID C-D PB4 11.00 0.50 0.60
PLINTH BEAM GRID 1 & 5 PB5 26.00 0.25 0.50
PLINTH BEAM GRID 2,3 & 4 PB6 11.00 0.30 0.70
PLINTH BEAM GRID PB7 4.00 0.30 5.00
PEDESTAL P1 P1 2.50 2.50 0.30
PEDESTAL P2 P2 0.70 1.00 0.30
PEDESTAL P3 P3 2.20 1.20 1.50
PEDESTAL P4 P4 1.20 0.80 0.30
PEDESTAL P5 P5 2.20 2.00 0.30
PEDESTAL P6 P6 0.80 0.80 0.30
PEDESTAL P7 P7 1.00 0.75 0.30
PEDESTAL P8 P8 2.00 1.20 1.50
PEDESTAL P9 P9 0.50 1.00 0.30
PEDESTAL P10 P10 0.95 0.95 1.00
PEDESTAL P11 P11 1.30 0.90 1.00
PEDESTAL P12 P12 0.35 0.75 2.00
PIT 1 AT -1.4 : BOT. SLAB PIT1 6.00 4.00 0.40
PIT 1 AT -1.4 : LONG WALLS PIT1 6.00 1.40 0.30
PIT 1 AT -1.4 : SHORT WALLS PIT1 4.00 1.40 0.30
PIT 1 SUMP PITSUMP 0.60 0.60 0.30
PIT 2 AT -1.2 : BOT. SLAB PIT2 3.80 3.50 0.30
PIT 2 AT -1.2 : LONG WALLS PIT2 3.80 1.20 0.30
PIT 2 AT -1.2 : SHORT WALLS PIT2 3.00 1.20 0.30
OUTSIDE TANK : BOT SLAB OST 3.50 2.60 0.30
OUTSIDE TANK : WALL LONG OSTW 3.50 2.50 0.25
OUTSIDE TANK : WALL SHORT OSTW 2.10 2.50 0.25
OUTSIDE TANK : TOP SLAB OST 3.50 2.60 0.30
GRADE SLAB INSIDE BUILDING S1 22.00 26.00 0.15
EXTRA FOR HEAVIER SLAB AT MAINT. BAY S2 11.00 6.00 0.15
SUB TOTAL
Reinforcement Bars Fe 415: HYSD bars (Assumed 120 KG/PER M3
RCC M25 ABOVE PLINTH
BEAM B1 : +4.200 B1 22.00 0.30 0.35
BEAM B2 : +4.200 B2 8.00 0.30 0.55
BEAM S1/S3 : +4.200 S1 22.00 0.23 0.35
BEAM S2 : +4.200 S2 5.00 0.23 0.35
ELECTRICAL ROOM +4.2 SLAB SS1 22.00 8.00 0.15
STAIR SLAB (OMIT 1 FOR EXTRA AT +4.2) ST1 5.50 1.50 0.20

BEAM FB1 : +7.000 FB1 22.00 0.30 0.35


BEAM FB2 : +7.000 FB2 8.00 0.30 0.55
BEAM FS1/FS3 : +7.000 FS1 22.00 0.23 0.35
BEAM FS2 : +7.000 FS2 5.00 0.23 0.35
CONT ROOM +7.000 SS1 22.00 8.00 0.15
STAIR SLAB (OMIT 1 FOR EXTRA AT +7) ST1 5.50 1.50 0.20

BEAM SB1 : +7.000 SB1 22.00 0.30 0.35


BEAM SB2 : +7.000 SB2 18.00 0.30 0.45
BEAM SB3 : +7.000 SB3 4.80 0.30 0.45
BEAM SB4 : +7.000 SB4 18.00 0.30 0.60
BEAM SB5 : +7.000 SB5 22.00 0.30 0.60
BEAM SB6 : +7.000 SB6 3.00 0.30 1.00
BEAM FS1 : +7.000 FS1 5.50 0.23 0.45
S1 +7.000 S1 22.00 5.80 0.15
S2 +7.000 S2 3.00 7.80 0.15
S3 +7.000 S3 6.50 13.50 0.15
S4 +7.000 S4 2.00 6.00 0.15

BEAM DB1 : +7.000 DB1 13.00 0.80 0.80


BEAM DB2 : +7.000 DB2 7.50 0.50 1.20
BEAM DB3 : +7.000 DB3 7.50 0.40 0.80
SLAB DSS1 DSS1 14.00 7.50 0.30

BEAM RB1 : +11.500 RB1 22.00 0.30 0.35


BEAM RB2 : +11.500 RB2 8.00 0.30 0.55
BEAM RFS1 : +11.500 RFS1 22.00 0.23 0.35
BEAM RFS2 : +11.500 RFS2 16.50 0.23 0.35
BEAM RFS3 : +11.500 RFS3 5.00 0.23 0.35
ROOF SLAB OF CONTROL ROOM RFSB1 22.00 8.00 0.15
BEAM TB1 : +13.610 TB1 22.00 0.23 0.50
BEAM GB1 : +13.610 GB1 22.00 0.45 1.20
BEAM TB2 : +13.610 TB2 18.00 0.30 0.60
WALKWAY SLAB: +13.610 WSB1 22.00 0.80 0.15

SUB TOTAL
Reinforcement Bars Fe 415: HYSD bars (Assumed 100 KG/PER M3
STRUCTURAL STEEL
TRUSS TR1
TRUSS TR1 18.0 MTR TR1 1380.00
GUSSET WEIGHT TR1 238.00
TIE RUNNER AND TIE ROD TR1 238.00
RAFTER ISMB 300 AT TOP OF GRID 1 AND 5 RFT2 18.50 44.2
Purlins @ 1.50 m each (ISMC 150) PLN 22.00 16.4
Wind Bracing ISA 75x6 LONG 54.00 6.8
Wind Bracing ISA 75x6 SHORT 18.00 6.8
Side Girt Long Side MC 150 22.00 16.4
INSERT PL AT COL TOP 1000x600 16 THK IP 1.00 0.60 125.6
LUGS 12 dia rod 1.60 0.9
INSERT PL AT COL TOP 1000x600 16 THK IP 0.60 0.60 125.6
LUGS 12 dia rod 1.60 0.9
Rail for Gantry Travel @ 52 kg / mtr 22.00 52
Hand rail 40 NB "M" OVER walkway T1,T2 22.00 3.61
STAIR: STRINGER BEAMS ISMC 200 10.50 22.10
SUPPORT ANGLE IN STEPS ISA 50X50x6 0.52 4.50
Grating in Steps @ 45 kg / SQM 0.30 0.75 45
Grating in LANDING @ 45 kg / SQM 1.00 1.00 45
CROSS BEAMS IN LANDING ISMC 200 1.00 22.10
GRATING OVER DRAIN TRENCH 22.00 0.35 45
GRATING OVER DRAIN TRENCH 5.00 0.35 45
Misc Supports AND Boiler at roof
TOTAL OF ABOVE
ADD EXTRA @ 5% FOR CONNECTIONS
SUB TOTAL
PRIMER+PAINTING 2 COATS
GI SHEET ON ROOF 54.00 26.00
boiler shed 22.00 7.00
SIDE SHEETING 22.00 6.00
SUB TOTAL
BRICKWORK IN MAIN WALLS
BRICK WALLS LONG SIDE 22.00 13.00 0.23
BRICK WALLS GRID 1 and 5 18.00 19.70 0.23
BRICK WALLS GRID B to A 8.00 13.00 0.23
DEDUCT FOR WINDOWS (1.5x1.5) 2.50 1.50 -0.23
SUB TOTAL
WATERPROOFING AT ROOF 22.00 8.00
BRICK COBA AT ROOF 22.00 8.00
PLASTERING/ WALL TILES/FINISHES
18 MM PLASTER ON ROUGH SIDE OF WALLS LONG 22.00 13.00
18 MM PLASTER ON ROUGH SIDE OF WALLS LONG 18.00 19.70
18 MM PLASTER ON ROUGH SIDE OF WALLS SHORT 8.00 13.00
SUB TOTAL
12 MM PLASTER ON EVEN SIDE OF WALLS LONG 22.00 13.00
12 MM PLASTER ON ROUGH SIDE OF WALLS LONG 18.00 19.70
12 MM PLASTER ON ROUGH SIDE OF WALLS SHORT 8.00 13.00
SUB TOTAL
Internal painting LW 22.00 13.00
External painting ex
SUB TOTAL
Glazed tiles on TOILET Wall Long wall 3.00 1.80
Glazed tiles on Bathroom Wall Shortwall 2.80 1.80
SUB TOTAL
Floor Tiles in Bathroom Toilet 3.50 3.00
DOORS AND WINDOWS
GLAZED WINDOWS 2.50 1.50
Flush Door 1.00 X 2.10
MAIN Door 2.1x2.4 2.1
Rolling Shutter Motor Operated 5 3
SANITORY ITEMS
Providing and fixing 1/2" Gi pipe for water supply Toilet
including elbows , tees, Unions and sockets etc
1/2" Bib Cock Toilet
Washbasin with counter tap Toilet
Waste water and Sewage pipeline Toilet Lumpsum including Traps, Tees and Elbows
Sintex water tank 1000 Ltr. roof
Europian Type Toilet seat including Flushing Tank and all Fittings
Indian Type Toilet seat including Flushing Tank and all Fittings
JOB No 20097
ER MGR

N QTY UNIT

5 189.00 CU M
10 630.00 CU M
2 115.20 CU M
2 129.60 CU M
4 57.60 CU M
6 264.60 CU M
2 63.00
5 36.40
6 36.96
1 114.40 CU M
1636.76 CU M
791.32 CU M
845.44 CU M

2 2.58 CU M

4 1.39 CU M

4 0.17 CU M
1 28.60 CU M
2 1.16 CU M
2 1.37 CU M
35.26 CU M

5 31.50
5 28.19
10 210.00
10 99.66
2 22.40
2 15.12
2 25.20
2 20.16
4 8.00
4 14.40
6 58.80
6 38.40
2 12.25
2 8.00
2 5.50
1 5.28
1 1.38
2 6.60
2 6.50
3 6.93
4 24.00
1 1.88
2 0.42
2 7.92
2 0.58
2 2.64
2 0.38
3 0.68
1 3.60
2 0.30
4 3.61
2 2.34
4 2.10
1 9.60
2 5.04
2 3.36
4 0.43
1 3.99
2 2.74
2 2.16
1 2.73
2 4.38
2 2.63
1 2.73
1 85.80
1 9.90
810.18 CU M
KG/PER M3 97.222 MT

2 4.62
5 6.60
2 3.54
1 0.40
1 26.40
1 1.65

2 4.62
5 6.60
2 3.54
1 0.40
1 26.40
1 1.65

1 2.31
2 4.86
2 1.30
1 3.24
1 3.96
2 1.80
2 1.14
1 19.14
1 3.51
1 13.16
1 1.80

2 16.64
2 9.00
2 4.80
1 31.50

2 4.62
5 6.60
1 1.77
1 1.33
1 0.40
1 26.40
2 5.06
2 23.76
2 6.48
2 5.28

286.29 CU M
KG/PER M3 28.629 MT
3 4.14
3 0.71
3 0.71
2 1.64
16 5.77
2 0.73
6 0.73
12 4.33
10 0.75
20 0.03
4 0.18
8 0.01
2 2.29
4 0.32
2 0.46
30 0.07
30 0.30
1 0.05
2 0.04
2 0.69
1 0.08
2.00
26.05 MT
1.30 MT
27.36 MT
27.36 MT
1 1404.00
1 154.00
2 264.00
1822.00 SQM

3 197.34
2 163.12
2 47.84
15 -12.94
395.36 CU M
1 176.00 SQM
1 176.00 SQM

3 858.00 SQM
2 709.20 SQM
2 208.00 SQM
1775.20 SQM
2 572.00 SQM
3 1063.80 SQM
2 208.00
1843.80 SQM
2 1843.80 SQM
1775.20
1843.80 SQM
3 16.20 SQM
3 15.12 SQM
31.32 SQM
1 10.50 SQM

15 56.25 SQM
10 10 NOS
4 4 NOS
15 SQM

30.00 RM

2 NO
2 NO
Tees and Elbows 40 RM
1 NO
1 NO
1 NO
DESCRIPTION

3.8

4.800 10
2
Mu 150
bd2 1000

-1.000

Raft slab 0.057 200 4.5 4.5 230.85


Mu 230.85 1000000 230850000 2.565
bd2 1000 300 90000000

200
8000

ROOF TOC = 11.560

2.67

DESCRIPTION CALCULATION CONT TH


SLAB DESIGN LIVE 15 kN /sqm
Dead Load Considering Thickness 150 mm 0.18 25
50 MM Thickness Floor Finish 0.05 24
Total Load
Maximum Bending at Mid Span : One Way wL2 /8 20.7 1.5 2.8 2.8
8
MU / bd2 30.43 1000 1000
1000 142 142
Bot Top Botd Topd Total
Ast 0.477 0.477 0.2 0.2 1.354
BEAMS LOAD STRIP WIDTH SPAN
20.7 2.8 5.5
MU / bd2 WL2/8 57.96 30.25
8
Maximum Bending at Mid Span : One Way 219.16 1000 1000
1000 440 440 Ast
SAFE BEARING CAPACITY 500 80%
LOAD
ROOF SLAB DEAD LOAD 8.0 5.5 0.5 16.5
FIXED END MOMENT WL2 363 4 0.7
12 12
7.00 SLAB DEAD LOAD 8.0 5.5 0.5 20.7
FIXED END MOMENT WL2 455.4 4 0.7
12 12
4.20 SLAB DEAD LOAD 8.0 5.5 0.5 16.5
FIXED END MOMENT WL2 363 4 0.7
12 12
Total P
Total M
Self and Dead Load Increase 25% 1476.75 P
Eccentricity M/P 275.66 0.18666667
1476.75 3.691875 150%
APPROXIMATE BASE AREA 400
5.538 2.215125
2.5
PMAX

Pressure Pz 0.6 vz2 0.6 45 45


Slope Height 2.7 0.3
Length 9
Coefficient Internal +Ext -0.832 -0.5 -1.332

Load X span EF -1.332 1215 1.5 -2427.57


Load X span GH -0.6 1215 1.5 -1093.5

Local 1.5 0.5 2 1215 0.7

1 0.333333333
3
9.5 8.1
1.35 7.037037037

5 3.571428571
1.4
wl2 2

240 150

1000000 150000000 1.666666667


300 90000000

80 1000000 80000000
573 1022 1000

AMOUNT
15
4.5
1.2
20.7 kN/SqM
30.429 kNM

1.51
106.289

219.16 kNM

1.132 Coeff
0.345 %
400 kN

363 KN
84.7 KN

455.4 KN
106.26 KN

363 KN
84.7 KN

1181.4
275.66

5.538 SQM

1215
16.7

10 -1.1
20 -0.7
16.7 0.04 6.7 0.268

for 16.7 -0.832


1701

18.4349488229
1.4
78.2778865
WASTE HEAT RECOVERY POWER PLANT
FOR ZUARI INDUSTRIES LTD.
AT SITAPUR, MP
DETAILED ESTIMATE OF PH BOILER BUILDING FOOTING
DETAILS OF QUANTITIES

S No. Description Nos. L B D

1 Earth Work in Excavation

Excavation for Footing


FT1 2 2.15 2.65 3.075
FT2 2 2.65 2.65 3.075

Total of Earthwork
Backfilling with available earth
FT1 2
FT2 2

PCC M20 BELOW FGL


2 PCC below Footing
FT1 2 2.15 2.65 0.075
FT2 2 2.65 2.65 0.075

RCC M25 BELOW FGL =


3 RCC Foundation
Footing slab
FT1 2 2.00 2.50 0.70
FT2 2 2.50 2.50 0.70
Pedestal below FGL
FT1 2 0.55 0.67 2.30
FT2 2 0.55 0.67 2.30
Pedestal above FGL
FT1 2 0.55 0.67 0.40
FT2 2 0.55 0.67 0.40

=
5 Reinforcement

Footing Slab
FT1 2
FT2 2
Pedastal
FT1 2
FT2 2

=
Quantity Unit

35.04
43.19
-----------
78.23 Cum

25.49
31.69
-----------
57.18

0.85
1.05
-----------
1.91 Cum

7.00
8.75

1.70
1.70

0.29
0.29
-----------
19.73 Cum

525
656.25

298.485
298.485
-----------
1.78 MT
WASTE HEAT RECOVERY POWER PLANT
FOR ZUARI INDUSTRIES LTD.
AT SITAPUR, MP
DETAILED ESTIMATE OF BOILER BUILDING FOOTING
DETAILS OF QUANTITIES

S No. Description Nos. L B D

Earth Work in Excavation


Excavation for Footing
FT1 3 2.65 2.65 3.075
FT2 3 2.65 3.15 3.075
FT3 2 2.65 2.65 3.075
FT4 1 3.65 4.65 3.075
FT5 1 4.65 4.65 5.075

=
Backfilling with available earth
FT1
FT2
FT3
FT4
FT5

PCC M20
PCC below Footing
FT1 3 2.65 2.65 0.075
FT2 3 2.65 3.15 0.075
FT3 2 2.65 2.65 0.075
FT4 1 3.65 4.65 0.075
FT5 1 4.65 4.65 0.075

=
RCC M25
Footing slab
FT1 3 2.50 2.50 0.60
FT2 3 2.50 3.00 0.60
FT3 2 2.50 2.50 0.50
FT4 1 3.50 4.50 0.40
FT5 1 4.50 4.50 0.70
Pedestal below FGL
FT1 3 0.70 1.00 2.40
FT2 3 0.70 1.00 2.40
FT3 2 0.70 1.00 2.50
FT4 1 0.70 1.00 2.60
FT5 1 0.70 1.00 4.30
Pedestal above FGL
FT1 3 0.70 1.00 0.40
FT2 3 0.70 1.00 0.40
FT3 2 0.70 1.00 0.40
FT4 1 0.70 1.00 0.40
FT5 1 0.70 1.00 0.40

Total RCC =

Reinforcement
Footing Slab
FT1
FT2
FT3
FT4
FT5
Pedastal
FT1
FT2
FT3
FT4
FT5

=
=
Quantity Unit

64.78
77.01
43.19
52.19
109.73
-----------
346.90 Cum

46.91
56.59
32.39
42.80
90.93
-----------
269.61 Cum

1.58
1.88
1.05
1.27
1.62
-----------
7.41 Cum

11.25
13.50
6.25
6.30
14.18
5.04
5.04
3.50
1.82
3.01

0.84
0.84
0.56
0.28
0.28
-----------
72.69 Cum

843.75
1012.5
468.75
472.5
1063.125

882
882
609
315
493.5
-----------
7042.13
7.042125 MT
ABSTRACT OF QUANTITIES : 6 MW WASTE HEAT RECOVERY PLANT

ITEM NO. DESCRIPTION UNIT QUANTITY BUILDING WISE QUANTITY RATE


CW DM MAIN PH AQC

Earth work in Excavation in foundations, wall footings, cable trenches, pits etc. in all types of soil except soft rock and hard rock as
classified in specification for a depth up to 1.5 M including removal of vegetation, shrubs and debris, cutting and dressing of sides in
slopes, leveling, grading and ramming of bottoms, dewatering of accumulated water from any source and keeping the surface dry for

1636.76
734.51

179.68

346.90
78.23
1 subsequent works and disposal or stacking of excavated material within a lead of 50M, including providing temporary supports to CUM 2976.08
existing service lines like water pipes, sewage pipes, electric overhead and underground cables etc all complete.(For payment the
excavation volume shall be calculated by multiplying the specified area of lean concrete by the specified depth of excavation) for a
depth of up to & inclusive of 5.0 M

Backfilling after execution of the work to proper grade and level with selected materials from available excavated soil within a lead
of 50 M, including re-excavating the deposited soil excavated earlier, breaking clods, laying at all depths and heights in layers of

127.71

791.32

269.61
thickness not exceeding 20 cm, watering, rolling and ramming by manual methods/mechanical compactors to achieve 95% laboratory

57.18
0.00
2 CUM 1245.82
max. dry density, dressing, trimming etc. in foundations, plinths, trenches, pits, etc. all complete

Transporting the surplus earth and debris including shrubs and vegetations from construction area to dumping area as per norms of
HZL including re-excavating the deposited soil excavated earlier, transportation, loading, unloading, laying at all depths and heights,

734.51

845.44
51.97

21.05

77.29
3 stacking, leveling and dressing – both the area (viz. from where the earth is transported and where it is deposited) to required levels CUM 1730.26
and slopes complete with all lifts as directed

Providing and laying Plain Cement Concrete for all depths below and upto plinth level in foundations, fillings, non-suspended floors,

181.30
etc. including tamping, ramming, vibrating, curing, shuttering etc. all as specified in any shape, position, thickness and finishing the

10.35

35.26

1.91

7.41
4 CUM 236.23
top surface rough or smooth as specified and directed all complete for concrete of nominal mix 1:2:4 by volume (1 cement: 2 coarse
sand: 4 crushed stone aggregates) with 20mm and down size graded crushed stone aggregates.

253.82
Water proofing compound (Dr. Fixit or equivalent) of approved quality in cement concrete works, cement plaster, RCC works,

0.00

0.00

0.00

0.00
5 Ltrs 253.82
flooring etc. in the proportion as per manufacturer’s specifications and as specified in the drawings.

Providing and laying Reinforced cement concrete of M-25 grade with 20 mm and down size graded crushed stone aggregates in
SUB-STRUCTURE of all types e.g. foundations, footings, raft beams, slabs, retaining walls, jambs, trenches, equipment / machine

181.30

810.18
41.62

19.73

72.69
6 foundations, pedestals, pipe sleepers, columns, plinth beams, vibrating, tamping, curing and rendering if required to give a smooth CUM 1125.51
and even surface etc. all complete (excluding the cost of Reinforcement and Shuttering) for all depths below and upto plinth level in
any shape, position and thickness, etc. all complete as specified, shown and directed.

Providing and laying Reinforced Cement Concrete of M-25 grade with 20 mm and down size graded crushed stone aggregates in
SUPER STRUCTURE in suspended floors, slabs, beams, columns, walls including counter forts, staircases, landings, steps, facia,
fins, mouldings, gutters, shelves, windowsills, canopies, lintels, girders, ducts, brackets, chajjas with drip moulds, Providing and

153.21

286.29
15.46

0.00

0.00
7 laying Reinforced Cement Concrete of M-25 grade with 20 mm and down size graded crushed stone aggregates in SUPER CUM 454.95
STRUCTURE in suspended floors, slabs, beams, columns, walls including counter forts, staircases, landings, steps, facia, fins,
mouldings, gutters, shelves, windowsills, canopies, lintels, girders, ducts, brackets, chajjas with drip moulds,

pedestals, posts, struts, equipment/machine foundations, ramps, etc. including providing pockets, openings, recesses, chamfering,
vibrating, tamping, curing and rendering if required to give a smooth and even surface etc. all complete (excluding the cost of
reinforcement and shuttering) for all heights above plinth level in any shape, position, thickness, etc. all complete as specified, shown
and directed.
ITEM NO. DESCRIPTION UNIT QUANTITY BUILDING WISE QUANTITY RATE
CW DM MAIN PH AQC
Supplying and placing in position High Yield Deformed Bars Reinforcement Grade Fe415 to IS: 1786, for RCC work including the
cost of steel, straightening, cleaning, de-coiling, cutting, bending to required shapes and lengths as per details, binding with

125.85
contra`ctor’s own 16 SWG black soft annealed binding wire at every intersection, supplying and placing with proper cover blocks,

32.97

5.18

1.78

7.04
8 MT 172.82
supports, chairs, overlaps, welding, spacers, fan hooks, etc. for all heights and depths, etc. all complete as directed.

Providing and fixing Centering and Shuttering in foundations, footings, raft beams, slabs, jambs, trenches, equipment/machine
foundations, pedestals, columns, plinth beams, lintels, beams, staircases, landings, steps, etc. including strutting, bracing, propping,

1261.42

1812.19

145.37
etc., keeping the same in position during concreting and removal of the same after specified period, etc. for straight/inclined

95.72

39.46
9 SQM 3354.16
Shuttering, keeping necessary provision for inserts, projecting dowels, etc. all complete and is specified and directed. For all heights
above plinth level and below plinth

Providing, Erecting, hoisting and fixing in position structural steel work in column, beams, girders, bracings, purlins and side

Err:509

27.36
3.75

0.00

0.00
10 runners including all necessary fasteners, bolts, nuts, welding etc. at all heights complete including painting as per specification and MT Err:509
direction of E.I.C.

Supplying and fixing C.G.I. sheets, flashing of plain steel sheets, ridges, corner pieces, galvanized fittings and fixtures, transportation

1822.00
Err:509
0.00

0.00

0.00
11 to site, cutting and bending of sheets to required shapes and size and erecting them in side cladding and roofing as shown in SQM Err:509
drawings.

Providing and laying 75B Class Brick Masonry Work with locally available kiln burnt Bricks in cement mortar 1:6 (1 cement : 6
12 coarse sand) as per specifications in one or more brick thickness and in any shape including providing recesses, opening, scaffolding, 0.00
staging, curing, finishing the joints flush below ground level and raking out joints in and above plinth level, etc. all complete

13 i) At all depths below and upto & inclusive of plinth level. CUM 0.00
14 ii) At all heights above plinth level. CUM 11.76 82.65 395.36 0.00 0.00 489.77

1775.20
102.24

912.25
Providing 18 mm thick cement plaster in cement mortar 1:6 (1 cement: 6 sand) on brick walls and/or concrete surfaces including

0.00

0.00
15 SQM 2789.69
cleaning, tracking concrete surfaces, scaffolding providing drip moulds if required watering, curing, etc. complete for all heights.
16 Same as above item no.22 but 12 thick plastering SQM 0 Err:509 1844 0.00 0.00 Err:509

1843.80 1843.80
102.24
Finishing walls, concrete surfaces and rain water pipes with waterproof cement paint of approved brand and manufacture on new

0.00

0.00
17 SQM 1946.04
work (three or more coats) to give an even shade.

912.25
Distempering with dry distemper of approved brand and manufacture (two or more coats) to give an even shade over and including

0.00

0.00

0.00
18 SQM 2756.05
priming coat with distemper primer.

Providing and laying rectified Glazed Ceramic floor tiles of size 300x300 mm or more (thickness to be specified by the
manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours White, Ivory , Grey , Fume Red Brown, laid on

10.50
0.00

0.00

0.00

0.00
19 SQM 10.50
20 mm thick cement mortar 1:4 (1 Cement: 4 Coarse sand), including grouting the joints with white cement and matching pigments
etc., complete.
ITEM NO. DESCRIPTION UNIT QUANTITY BUILDING WISE QUANTITY RATE
CW DM MAIN PH AQC
Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer),of
approved make, in all colours, shades except burgundy , bottle green, black of any size as approved by Engineer-in-Charge, in

31.32
0.00

0.00

0.00

0.00
20 SQM 31.32
skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey
cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete.
Providing and laying 100 mm thick (average) brick bat (coba) waterproofing treatment on terrace with 15 mm thick (average) cement
plaster 1:4 (1 cement:4 coarse sand) with an admixture of acrylic based chemical waterproofing compound of approved brand and
manufacture laid over the RCC slab after thoroughly cleaning the surface and flood grouting with chemical cement slurry. Brick

176.00
0.00

0.00

0.00

0.00
21 bat(coba) of adequate size to get the desired slope is laid in chemical cement mortar 1:4(1 cement:4 coarse sand) mixed with acrylic SQM 176.00
based waterproofing compounds with joints 15-25 mm wide, these joints are filled with chemical cement mortar 1:4 ( 1 cement :4
coarse sand) with acrylic base water proofing compound. The treatment should continue along the inner side of parapet or other
adjoining wall upto height of about 30 cm in the shape of round vata. Finally the top surface shall be covered with joint less
waterproofing
Providing plasterfour
and laying 15 mm thickwater
courses as mentioned above, finished
proofing treatment smooth felt
with bitumen withover
trowel
roofsinconsisting
cement colour marked
of first intocourses
and third 30 cm of
X 30 cm
blown
false square including curing complete.
bitumen 85/25 or 90/15 conforming to IS : 702 applied hot @ 1.45 Kg per square metre of area for each course, second course of
roofing felt type 3 grade-I (hessian based self finished bitumen felt) and fourth and final course of stone grit 6 mm and down size or

176.00
0.00

0.00

0.00

0.00
22 pea-sized gravel spread at 6 cubic diameter per square metre including preparation of surface but excluding grading complete with SQM 176.00
Bitumen felt (hessian base) type 3 grade I conforming to IS : 1322

Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/
appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of
required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/

Err:509

56.25
neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required

0.00

0.00

0.00
23 SQM Err:509
including cleat angle, Aluminium snap beading for glazing / paneling, C.P . brass / stainless steel screws, all complete as per
architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be INCLUDED AS
FOLLOWS : 1. Polyester powder coated aluminium (minimum thickness of polyester powder coating 50 micron) 2. Providing and
fixing glazing in aluminium door, window , ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket 3. With float
Providing
glass panesand fixingmm
of 5.50 ISIthickness
marked flush door shutters conforming to IS :2202 (Part I) decorative type, core of block board construction

Err:509
with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both
24 NOS Err:509

10
0

0
faces of shutters. 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws ( AVERAGE SIZE 1.00 x 2.10
M)
Providing and fixing G .I. Pipes complete with G .I. fittings and clamps, i/c making good the walls etc. concealed and open pipe,
including painting with anti corrosive bitumastic paint, cutting chases and making good the wal. including elbows , tees, Unions and

30.00
0.00

0.00
25 RM 30.00

0
sockets etc 15 mm dia nominal bore

26 Washbasin with counter tap AND EXTENSION PIPES ETC. COMPLETE NOS 0 0 2 2.00

0 0 0 0 0

0 0 0 0 0
27 Europian Type Toilet seat including Flushing Tank and all Fittings NOS 0 1 1.00
28 Indian Type Toilet seat including Flushing Tank and all Fittings NOS 1 1.00
29 Waste water and Sewage pipeline : 100 MM DIA UPVC PIPE , FITTINGS, TRAPS AND CLAMPS ETC. RM 0.00 0.00 40.00 40.00
30 Sintex tank with all fittings Ltrs 0.00 0.00 1000 1000.00
AMOUNT REMARKS
AMOUNT REMARKS
AMOUNT REMARKS
2.00 mtr. HIGH BOUNDARY WALL DESIGN
Description Notation Calculation
Height of wall from top of footing h 2000 50
Thickness of wall t
Length of panel L 5000
Height to Length ratio h/L 2050 5000

Moment of inertia (UNIT WIDTH)about


xx axis Ixx 1000 8000000 12
Moment of inertia of WALL Panel about
xx axis Ixx-WALL BD3 /12 5000 8000000
12
Area of cross section Axx 5000 200
Radius of Zyration about xx Rxx root I / a 3333333333 3333
1000000
Effactive length factor kh
Slenderness ratio L/Rxx * hk 2050 0.75 26.63 <
57.74
Limiting Panel area clause 36.3.a.1 1500x tef2 1500 200 200
Panel area Height x length Area 5000 2000
Strength Design : Bending Moment :Plane of failure Perpendicular to the bed joints
Orthogonal ratio : Table 3 Mu 0.15 0.25
Ch. Wind Load Wk
Partial Safety factor Gama f for h/L =.5 for h/L =.3 Design value
Bending moment coeff. From table 9 Alfa 0.021 0.013 0.0174
Design Bending Moment : plane of
failure Perpendicular to the bed joints Alfa Wk Gama f L2

Putting the values 0.0174 1.25 1.4 25


Design Moment of Resistance Plane of failure Perpendicular to the bed joints
Moment of Resistance : plane of failure
Perpendicular to the bed joints fkx Z
0.25 13666667
Partial safety factor for material Ym 3.5
Section Modulus Zyy 2050 40000 82000000
6 6
Check for Failure 0.76 < 0.98DESIGN IS SAFE
Strength Design : Bending Moment :Plane of failure Parallel to the bed joints
for h/L =.5 for h/L =.3 Design value
Bending moment coeff. From table 9 Alfa 0.026 0.017 0.02195
Design Bending Moment : plane of
failure Parallel to the bed joints Alfa Wk Gama f L2 Mu

Putting the values 0.02195 1.25 1.4 25 0.6


Moment of Resistance :Parallel to joint
failure
fkx Z 0.15 6666666.67
Partial safety factor for material Ym 2.8

Section Modulus per Mtr Width Zxx 1000 40000 40000000


6 6
Design moment of resistance
value Unit Reference
2050 mm
200 mm
5000 mm Clause 28.3.2 : BS: 5628
0.41

666666667
mm4
3333333333
mm4

1000000 mm2
57.74 mm

0.75 Clause 28.3.1.1(a): BS: 5628


27 OK Clause 28.1: BS: 5628

60000000
10000000 THE RATIO IS OK
to the bed joints
0.6 Using Mortar type 3, wall thickness 250
1.25 kN /m2
1.4 Clause 22(b); BS:5628
For Mu = 1.00 , h/L = 0.41 Table-9, Panel D : BS:5628

0.76 kNm Perpendicular to the bed joints

0.98 kNm Perpendicular to the bed joints


Table 4: for Normal manufacture /Const. control

13666667 mm3

DESIGN IS SAFE
he bed joints

For Mu = 0.6 , h/L = 0.41 Table-9, Panel D : BS:5628

Table-9, Panel D : BS:5628

0.58 kNm Condition D, for Mu= 0.6


0.36

6666667 mm3
y y

2000
z z x

300

200

y y