Fanhole Cutting Activity

Date : Shift :
I. LOADING AND SPITTING
Location: Undercutting Seq. No. :
FH No. :
INSPECTION CHECKLIST REMARKS Inspected By:

 The minimum 40 % of the swell tonnage from this


location has been scooped out.
Total Buckets Scooped: ______________________
_________________
 Conducted sounding of all the holes to be loaded.
See attached sounding measurements. Development
Supervisor

_________________
 All support installations within 50 meters from the
location are finished Concreting
Supervisor /
Foreman

_________________
Rock Mechanics
 The location is properly barred down. Inspector

 All blowers and circuit breakers that may be


affected are properly covered and/or protected
_________________
 All nearby water, air and power lines that may be
affected are properly covered and/or protected Surveyor

II. Swell Scooping Activity for the Shift


No. of buckets
LOCATION UNIT USED
scooped
1.
2.
3.

I hereby certify that all required activities prior to undercutting has been properly complied and accomplished.

Development Foreman Development Shift Superintendent Shift Manager