Sunteți pe pagina 1din 1

REV DATE PREPARED CHECKED ENDORSED DESCRIPTION

PRECAST BEAM STEEL CABLE LAYOUT


SCALE A
II Ⅰ Ⅰ—Ⅰ Ⅱ—Ⅱ
13 1985
y SCALE B SCALE B
649.5(N4 straight reach)
443.3(N3 straight reach) 180 180

17 31.5 31.5 66.6 26.6 26.6 9.3


3.7 16.7
1415.9(N1 bend-up point) 4
N4

13.2
43.5
N3 1011.2(N2 bend-up point)
20
137.6(N2 straight reach) 427.1(N3 bend-up point) 3
262

R8000

R8000

96.5
221(N4 bend-up point)

262
R6000
N2

R8000
4

2.2 3.3
N1
x 3 2 2

47.5
13.8
O 2 2

54.5
13
1 1 1 1

40
25.5

36
150.5(N1 straight reach)

11
Ends cross section

15 15 15 15
II Ⅰ 12 12
54
12 12
54

GIEDER ENDS DETAIL TYPE YM15-7 ANCHORAGE


SCALE C
5 Spiral steel bar Grout hole M27 Installing hole M10
Ø14,4 circle

STELL CABLE 1 STELL CABLE 2 STELL CABLE 3 STELL CABLE 4

13.5

14.5
21
20
7
16.7 6 ∅13.5
2.2 3.3 3.7
2.2

3.3

3.7

16.7
16 14.5 Specfic layout refers to practical product
Corrugated pipe
12.5

12.5

21

12.5
Girder end

Girder end

Girder end
Steel cable Steel cable inner diameter Ø70
Steel cable

30.3
33.7

34.8

26.6

43.3
31.5

31.5

12.5
Girder end
Steel cable
19.1

14.4
19.1

26.6

14.4
13 13 13 TYPE YM15-9 ANCHORAGE
Anchor end Anchor end Anchor end
cross section cross section cross section
13 Anchor end
C50 concrete C50 concrete C50 concrete 6 Spiral steel bar Installing hole M10
cross section Ø16,5 circle Grout hole M27
C50 concrete

15.7

24

24
18
8
6 ∅15.7

18 18 Specfic layout refers to practical product


Corrugated pipe 24
inner diameter Ø80

STEEL CABLE COORDINATE (UNIT:cm)


0
x (Middle 1985 Elongation
NO.
y cross 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 (Cross value
section) section)
1 y 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.1 11.6 12.5 13.8 15.6 17.7 20.3 23.3 26.7 30.2 33.1 36.1 13.7 Dwg. No. DRAWING TITLE
2 y REFERENCE DRAWINGS
25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.5 25.6 26.0 26.7 27.7 29.1 30.7 32.7 35.0 37.5 40.4 43.7 47.2 51.0 55.2 59.7 64.5 69.6 74.9 80.1 83.8 13.7
3 y 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.9 41.9 43.1 44.7 46.5 48.7 51.2 54.0 57.1 60.5 64.3 68.3 72.7 77.4 82.4 87.8 93.4 99.4 105.7 112.3 119.2 126.2 133.3 140.3 147.3 154.4 161.4 168.4 175.5 180.4 13.8 EMPLOYER:
4 y 54.5 54.5 54.5 54.5 54.5 54.6 54.9 55.5 56.5 57.8 59.4 61.3 63.5 66.0 68.9 72.0 75.4 79.3 83.4 87.8 92.5 97.6 102.9 108.6 114.6 121.0 127.6 134.6 141.6 148.6 155.7 162.7 169.7 176.8 183.8 190.8 197.9 204.9 211.9 219.0 223.9 13.9
SK HYDRO (PRIVATE) LIMITED
OWNER’S ENGINEER:
MOTT MACDONALD UK, YELLOW RIVER CONSERVANCY
Notes: COMMISSION, MOTT MACDONALD PAKISTAN JOINT VENTURE
1.Dimensions are given in cm except the steel cable and corrugated pipe diameter given in mm.
2.The prestress steel cable uses the steel strand whose grade is ASTM270,standard strength is 1860MPa. One beam of prestress steel cable is comprised CONTRACTOR:
by 7、9 pieces of Ø S 15.24 steel strand.Details are shown in the girder steel cable、anchorage and corrugated pipe number list.
3.The reserved length of the steel strand beside the anchor ends is 70cm,which is used for the jack. The steel strand can be cut off after the work of jack.
A PIECE OF MAIN GIRDER STEEL CABLE、ANCHORAGE 4.The anchorage(including matched anchor plate and spiral rebar) uses the approved product whose type is YM15-7、9.
AND CORRUGATED PIPE NUMBER LIST 5.The prestress pipe uses embedded corrugated pipe, the inner diameter of corrugated pipe is shown in the number list.
Steel Steel Anchorage Embedded Corrugated 6.Tensioning the prestress steel should be done while the girder concrete strength reaches cylinder strength of 37MPa at 21 days.Grouting in the anchorage BIDR CHINA WATER RESOURCES BEIFANG
Length Count strand cable type/amount
NO.
(m) (beam)(piece) (kg) (set)
corrugated pipe length
pipe diameter (m)
Remark grout hole should be done after the completion of the girder steel cable stretching immediately. INVESTIGATION, DESIGN AND RESEARCH CO. LTD
7.The steel cable should be stretched in the both sides. The stretching stress of single 7、9-Ø S 15.24 steel cable is 1395MPa.The stretching force of single
1 41.09 2 7 316.68 YM15-7/4 ∅70 39.43 1、Anchorage(include anchor plate、clamping
7-Ø S 15.24 steel cable is 1357.34kN,The stretching force of single 9-Ø S 15.24 steel cable is 1745.15kN,the reference value of stretching length in every
2 41.11 2 7 316.84 YM15-7/4 ∅70 39.45
and spiral rebar etc.)uses the approved
end is 137~139mm。 PAKISTAN
products.
3 41.22 1 9 408.45 YM15-9/2 ∅80 39.56 8.The stretching sequence of steel cable is 1→4→2→3。 SUKI KINARI HYDROPOWER PROJECT
2、The steel cable is included in the 9.Scale A: 0 600 1200 1800 2400 3000mm
4 41.26 1 9 408.85 YM15-9/2 ∅80 39.60
stretching length that is 70cm on both DESIGNED 2018.5.22
TOTAL 6 46 2084.34 12 236.92 sides. Scale B: 0 500 1000 1500 2000 2500mm PRESTRESSED GIRDER
CHECKED 2018.5.22
Scale C: 0 100 200 300 400 500mm EXAMINED 2018.5.22 PRESTRESSED STEEL CABLE LAYOUT
VERIFIED
APPROVED CONSTRUCTION DESIGN HYDRAULIC SECTION
SCALE SEE DRAWING DRAWING No. SKP-CGGC-CD-04-UZA-13-109-D2