MRB – PTP – 15
Prepared by Approved by
1 Objective 1
2 Acronym 1
4 Environmental Conditions 2
MRB PT PROGRAMMEME
MRB-PTP-15 Page 1 of 6
General Procedure
Of Equipment, Accommodation and
Environment
Issue No. 1 Amendment No. 2017/0
1 Objective
2 Acronym
3 Scope
This procedure covers all appropriate conditions to ensure PT activities are reliable.
These include the laboratory’s:
4.1 The PT laboratory has been suitably and appropriately located at premise
within the organisation.
4.2 Effective separation between incompatible and adjacent activities has been
placed in the laboratory, facilities, equipment, etc. These includes facilities and
equipment for proficiency test item manufacturing, handling, calibration,
testing, storage and dispatch, data processing, communications, and for
retrieval of materials and records.
4.3 All necessary facilities within the laboratory are adequate, suitable and
properly maintained to provide PT activities efficiently.
5 Environmental Conditions
5.2 For the storage of sample, the environmental conditions including temperature
and humidity are monitored & recorded. (Refer to PTP-15-F01). The
monitoring is carried out every 2 weeks.
5.3 Where required, other environmental conditions affecting the quality of the PT
items are monitored, controlled and recorded.
5.5 When the environmental conditions jeopardize the quality or the operations of
the proficiency testing scheme, the relevant proficiency testing activities shall
be stopped and remarked in the PTP-15-F01 accordingly.